Plan Review Details - Permit 02051793
Plan Review Stops For Permit 02051793
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2007-08-08 Cont ID  
Sent By jgomez Date 2007-08-08 Time 09:52 Rev Time 0.00
Received By jgomez Date 2007-08-08 Time 09:52 Sent To PC
Notes
2007-08-08 09:52:47TRUSS PACKAGE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2007-07-31 Cont ID  
Sent By jgomez Date 2007-07-31 Time 13:25 Rev Time 0.00
Received By jgomez Date 2007-07-31 Time 13:25 Sent To PC
Notes
2007-07-31 13:50:51TRUSS DRAWING PACKAGE CHECKLIST:
 1- AS REQUESTED ON PREVIOUS CHECKLIST DATED 7-6-07THE
 TRUSSES NEED TO INCLUDE THE ATTIC LIVE LOAD AS REQUIRED
 BY TABLE 1604.1 FBC 2001.
 ENGINEER RESPONDED WITH LETTER SAYING THAT THIS IS A
 NON CONCURRENT LOAD. THIS IS NOT CORRECT.
 ENGINEER TO READ SECTION 1604.1 OF FBC 2001. THIS TRUSS
 PACKAGE DOESN'T MEET THE MINIMUM CODE REQUIREMENTS.
 (NOTE: THIS IS NOT ONLY REQUIRED BY THE FLORIDA
 BUILDING CODE,BUT BY THE ASCE 7-98 STANDARD ALSO. SEE
 SEC. 4.2.1).
  
 2- EACH INDIVIDUAL SHEET SHALL HAVE ENGINEER'S ORIGINAL
 SIGNATURE, NOT COPY OF SIGNATURE AS REQUIRED BY CHAPTER
 471 FLORIDASTATUTE.
  
 3- PRODUCT APPROVAL PACKAGE SUBMITTED IS OK.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2007-07-06 Cont ID  
Sent By jgomez Date 2007-07-06 Time 13:23 Rev Time 0.00
Received By jgomez Date 2007-07-06 Time 11:16 Sent To PC
Notes
2007-07-06 13:39:02BUILDING REVIEW CHECKLIST:
 1- TRUSS PACKAGE:
 A) TRUSS PACKAGE NEEDS TO BE REVIEWED AND APPROVED
 IN WRITING BY THE ENGINEER OF RECORD PRIOR TO SUBMITTAL
 TO THIS OFFICE.
  
 B) ALL DRAWINGS, INCLUDING GENERAL DETAILS, LETTERS
 NEED TO BE SIGNED AND SEALED WITH WITH ORIGINAL SEAL,
 SIGNATURE AND DATE AS REQUIRED BY CHAPTER 471 FLORIDA
 STATUTEAND SEC. 61G15-23 FLORIDA ADMINISTRATIVE
 CODE.
  
 C) ALL INDIVIDUAL TRUSSES TO HAVE ENGINEER'S
 ORIGINAL SIGNATURE, NOT COPIES, AS REQUIRED BY CHAPTER
 471 FLORIDA STATUTEAND SEC. 61G15-23 FLORIDA
 ADMINISTRATIVE CODE
  
 D) ALL DESIGN LOADS SHOWN IN GENERAL DETAILS AND
 INDIVIDUAL TRUSSES TO MATCH. REVISE AS REQUIRED. ALSO,
 COORDINATEWITH ITEM 1(E) BELOW.
  
 E) TRUSS DRAWINGS NEED TO SPECIFY THE ATTIC LIVE
 LOAD AS REQUIRED BY TABLE 1604.1 FBC 2001. REVISE AS
 REQUIRED.
  
 2- ROOF TILE UPLIFT TEST REPORT REFERENCES FBC 2004.
 THIS BUILDING WASDESIGNED AND APPROVED UNDER FBC
 2001. REVISE AS REQUIRED.THERE IS NOT PRODUCT
 APPROVAL SUBMITTED FOR CONCRETE TILE, THEREFORE UNABLE
 TO VERIFY WHICH TESTING WAS REQUIRED.
  
 3- PRODUCT APPROVAL PACKAGE SUBMITTED IS INCOMPLETE.
 NEED TO PROVIDE 2 COMPLETE COPIES OF PRODUCT APPROVALS,
 NOT JUST A LIST OFNOA NUMBERS.
  
 4- NOA 02-0131.03 EXPIRED ON AUGUST 31, 2006.
 THEREFORE, IT CAN'T BE USED.
  
 5-PROVIDEALL PRODUCT APPROVALS AND ADDITIONAL
 INFORMATION WAS REQUESTED ON PROVISO DATED 11/21/02 AS
 AGREED WITH THE OWNER TO EXPEDITE THE PERMITTING
 PROCESS. OWNER IGNORED THIS PROVISO AS WELL AS
 REMAINDERGIVEN TO THE OWNER ON 4/19/5 WHEN REVISIONS
 WERE SUBMITTED.SEE ATTACHED COPIES.
 OWNER TO PROVIDE ALL REQUESTED INFORMATION IN THE
 PROVISO DATED 11/21/02.
  
 JULIO GOMEZ
 BUILDING PLANS EXAMINER
 (561)805-6712

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status N Date 2005-04-20 Cont ID  
Sent By jgomez Date 2005-04-20 Time 15:59 Rev Time 0.00
Received By jgomez Date 2005-04-20 Time 15:58 Sent To  
Notes
2005-04-20 00:00:00SUBMITTED RE-RECORDED NOTICE OF
 COMMENCEMENT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-04-19 Cont ID  
Sent By jgomez Date 2005-04-19 Time 11:29 Rev Time 0.50
Received By jgomez Date 2005-04-19 Time 11:29 Sent To PC
Notes
2005-04-19 00:00:00BUILDING REVIEW CHECKLIST:
  
 1- REVISION IS TO MODIFY ENGINEERED
 TRUSS. THERE IS NOT ENGINEERED TRUSS
 PACKAGE ON FILE. NEED THE ENGINEERED
 TRUSS PACKAGE REVIEWED BY THE ENGINEER
 OF RECORD TO BE SUBMITTED TO THIS
 OFFICE.
  
 2- NONE OF THE INFORMATION REQUESTED ON
 PROVISO DATED 11-21-02 WAS SUBMITTED TO
 THIS OFFICE. SEE ATTACHED COPY AND
 PROVIDE ALL REQUESTED INFORMATION TO
 AVOID DELAYS OR CONFLICTS.
  
 3- NOTICE OF COMMENCEMENT IS EXPIRED
 AFTER ONE YEAR OF RECORDING. THERE IS
 NOT A DIFFERENT DATE SPECIFIED ON THE
 RECORDED NOTICE OF COMMENCEMENT.
 THEREFORE, NEED NEW NOTICE OF
 COMENCEMENT. SEE TITLE XL SEC. 713.13 OF
 FLORIDA STATUTES.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT (561)805-6712.

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2007-05-18 Cont ID  
Sent By btrobaug Date 2007-05-18 Time 08:12 Rev Time 0.75
Received By btrobaug Date 2007-05-18 Time 06:55 Sent To PC
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2007-05-01 Cont ID  
Sent By jleahy Date 2007-05-01 Time 16:35 Rev Time 3.00
Received By jleahy Date 2007-05-01 Time 16:24 Sent To  
Notes
2007-05-01 16:34:18PANEL SCHEDULES "A" & 'B"HAVE NOT BEEN ADJUSTED FOR
 ALL NEW LOADS.
  
 PANELS 'A' , 'B' LOAD CALCULATIONS HAVE NOT BEEN
 ADJUSTED FOR NEW LOADS
  
 SEE PLAN WITH GREEN HIGHLIGHTER FOR NEW LOADS THAT ARE
 SHOWN ON THIS DRAWINGS.
  
 FIELD INSPECTOR STATES THAT ALL TUBS ARE NOW SPAS AND
 THIS IS NOT SHOWN ON DRAWINGS.
  
 SPAS THAT ARE SHOWN ON SECOND FLOOR THE LARGE ONE SHOW
 TWO (2) SWITCHES WITHIN 5' OF SPA
 SEE SECTION 680.43 (C) FOR VIOLATION.
  
 IF THE OTHER TUBS ARE SPAS YOU WILL HAVE THE SAME
 VIOLATION ON THE ONES ON THE SECOND AND FIRST FLOORS
 WHERE THE SWITCHES ARE WITHIN 5' OF THE SPA.
  
 PANEL "B" SHOWS ON RISER AS A 24 CIRCUIT PANEL AND IT
 IS A 42 CIRCUIT PANEL.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-09-30 Cont ID  
Sent By btrobaug Date 2002-09-30 Time 10:00 Rev Time 1.00
Received By btrobaug Date 2002-09-30 Time 09:22 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-07-02 Cont ID  
Sent By pkrauss Date 2002-06-26 Time 12:53 Rev Time 0.00
Received By btrobaug Date 2002-07-02 Time 17:20 Sent To R
Notes
2002-07-02 00:00:00UNSAT
 ~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE PROVIDE THE FOLLOWING
 INFORMATION,MAKE ANY NECESSARY CHANGES
 ON THE PLAN AND RESUBMIT FOR REVIEW.
  
 1} PLEASE SHOW PANEL"B" LOCATION ON THE
 DRAWING.
  
 2} PLEASE LIST THE REQ`D BATH(S)
 CIRCUIT(S). PER 210-11-C-3
 MUST BE 20A AND #12AWG.
  
 3} PLEASE LIST THE REQ'D ARC
 FAULT PROTECTED CIRCUITS ON PANEL
 SCHEDULE. PER 210-12
  
 4} PLEASE NOTE THAT IN B-108,ANOTHER
 GFI IS REQUIRED PER 210-52(D).(DOUBLE
 SINK IS SHOWN ON E-1.)
  
 5} SMOKE DETECTORS ARE REQUIRED IN AND
 OUT OF BEDROOMS PER 2-2.1.1.1 NFPA-72.
  
 6} PLEASE ADD RECEPTACLES TO MEET THE
 REQUIREMENT OF 210-52(A)(1),NOTE THE
 STEREO ROOM.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL;
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 561/659-8096 EXT. 8392.

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2007-08-07 Cont ID  
Sent By lmartine Date 2007-08-07 Time 14:19 Rev Time 0.00
Received By lmartine Date 2007-08-07 Time 14:19 Sent To B
Notes
2007-08-07 14:20:36GAVE TO JULIO

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2007-07-28 Cont ID  
Sent By adarroug Date 2007-07-28 Time 12:34 Rev Time 0.00
Received By adarroug Date 2007-07-28 Time 12:34 Sent To B
Notes
2007-07-28 12:35:08TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2007-07-02 Cont ID  
Sent By adarroug Date 2007-07-02 Time 15:53 Rev Time 0.00
Received By adarroug Date 2007-07-02 Time 15:53 Sent To B
Notes
2007-07-02 15:53:48TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2007-06-28 Cont ID  
Sent By adarroug Date 2007-06-28 Time 16:43 Rev Time 0.00
Received By adarroug Date 2007-06-28 Time 16:43 Sent To B
Notes
2007-06-28 16:44:08TO "JGOMEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2007-05-10 Cont ID  
Sent By btrobaug Date 2007-05-10 Time 13:45 Rev Time 0.00
Received By btrobaug Date 2007-05-10 Time 13:44 Sent To E
Notes
2007-05-10 13:44:52 
  
  
 TO JAKE'S DESK./WRT.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2007-05-07 Cont ID  
Sent By adarroug Date 2007-05-07 Time 15:45 Rev Time 0.00
Received By adarroug Date 2007-05-07 Time 15:45 Sent To E
Notes
2007-05-07 15:45:45TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2007-04-16 Cont ID  
Sent By adarroug Date 2007-04-16 Time 16:56 Rev Time 0.00
Received By adarroug Date 2007-04-16 Time 16:56 Sent To E
Notes
2007-04-16 16:56:32TO "BTROBAUG" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-04-06 Cont ID  
Sent By adarroug Date 2005-04-06 Time 16:47 Rev Time 0.00
Received By adarroug Date 2005-04-06 Time 16:47 Sent To B
Notes
2005-04-06 00:00:00TO "JGOMEZ" DESK/REVISION

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-10-03 Cont ID  
Sent By pkrauss Date 2002-10-03 Time 15:51 Rev Time 0.40
Received By pkrauss Date 2002-10-03 Time 15:13 Sent To P
Notes
2002-10-03 00:00:00MECHANICAL PERMIT 02061129

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2002-06-26 Cont ID  
Sent By btrobaug Date 2002-09-30 Time 10:01 Rev Time 0.45
Received By pkrauss Date 2002-06-26 Time 11:07 Sent To E
Notes
2002-06-26 00:00:00DENIED:MECHANICAL PERMIT 02061129
  
 PLEASE PROVIDE THE FOLLOWING INFORMATION
 FOR REVIEW:
  
 2001 FBC(M) 402.2 - NATURAL VENTILATION
 FOR OUTSIDE AIR REQUIRMENT. SHOW
 COMPLIANCE FOR THE MINIMUM OPENABLE AREA
 TO THE OUTDOORS. (4 PERCENT OF THE FLOOR
 AREA BEING VENTILATED) OR TABLE 403.3
 FOR MECHANICAL VENTILATION.
  
 SMOKE DETECTORS SHALL BE INSTALLED
 SUPPLY SYSTEMS WITH A DESIGN CAPACITY
 GREATER THAN 2,000 CFM, IN THE SUPPLY
 AIR DUCT. 2001 FBC(M) 606.2.1OR
 UPON ACTIVATION, THE SMOKE DETECTORS
 SHALL SHUTDOWN THE AIR DISTRIBUTION
 SYSTEM. 2001 FBC(M) 606.4
  
 PLEASE NOTE PLAN SHEET M-1 THE TWO DROPS
 LOCATED IN THE KITCHEN AREA, FLEX SIZE
 IS NOT INDICATED ON PLAN.
  
 OVERFLOW PROTECTION REQUIRED AS PER
 2001 FBC(M) 307.2.3.
  
 SHOULD A GAS DRYER BE INSTALLED -
 SHOW COMPLIANCE FOR COMBUSTION AIR AS
 PER 2001 FBC(M) CHAPTER 7.
  
 PLEASE NOTE, EXHAUST AIR SHALL NOT BE
 DIRECTED ONTO WALKWAYS AS PER 2001 FBC
 (M) 401.5.2.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-10-05 Cont ID  
Sent By jleech Date 2002-10-05 Time 07:23 Rev Time 0.50
Received By jleech Date 2002-10-05 Time 07:22 Sent To  
Notes
2002-10-05 00:00:00RE-SUB OK

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-06-22 Cont ID  
Sent By pkrauss Date 2002-10-03 Time 15:53 Rev Time 0.50
Received By jleech Date 2002-06-22 Time 09:11 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status P Date 2003-06-05 Cont ID  
Sent By jgomez Date 2003-06-05 Time 12:15 Rev Time 0.50
Received By jgomez Date 2003-06-05 Time 12:15 Sent To  
Notes
2003-06-05 00:00:00STEMWALL REVISION.

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2002-11-21 Cont ID  
Sent By jgomez Date 2002-11-21 Time 11:41 Rev Time 3.00
Received By jgomez Date 2002-11-21 Time 13:16 Sent To  
Notes
2002-11-21 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SURVEY WITH PROPOSED LAYOUT.
 SEC. 104.2.4 CITY AMENDMENTS TO FBC.
 2-PROVIDE COMPLETE/CLEAR WINDOW SCHEDULE
 THAT MATCHES PRODUCT APPROVALS.
 3-PROVIDE PRODUCT APPROVAL AND COMPLETE
 SPECIFICATIONS FOR EPICORE SYSTEM TO
 BE USED. ALL INFORMATION REVIEWED BY
 THE ENGINEER & SUBMITTED TO BUILDING
 DEPARTMENT PRIOR TO CONSTRUCTION.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 4-ARCHITECT AND ENGINEER TO REVIEW ALL
 SHOP DRAWINGS PRIOR TO CONSTRUCTION
 AND SUBMIT TO THIS OFFICE.
 5-PROVIDE PRODUCT APPROVAL FOR: A)SKY-
 LIGHT. B)INSWING FRENCH DOORS AS SHOWN
 ON PLANS. C)INSWING FRENCH DOORS WITH
 TRANSOM ABOVE SINGLE ASSEMBLY AS SHOWN
 ON PLANS. D)FIXED WINDOWS WITH SIZES
 AS SHOWN ON PLANS. E)ROOF TILE. F)FLAT
 ROOF SYSTEM. G)FIREPLACE UL LISTING &
 COMPLETE SPECS. H)BBQ UL LISTING AND
 SPECS.
 6-PROVIDE COMPLETE FRAMING DETAILS FOR
 SKYLIGHT. SECTION 104.2.1.2 CITY AMEND
 MENTS TO FBC 2001.
 7-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS UNDER A SEPARATE PERMIT.
 8-PROVIDE COMPLETE SHORING PLANS/DETAILS
 AND SPECS FOR INSTALLATION OF CONCRETE
 FLOOR SYSTEM PRIOR TO CONSTRUCTION.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2002-10-08 Cont ID  
Sent By jgomez Date 2002-10-08 Time 18:34 Rev Time 4.00
Received By jgomez Date 2002-10-08 Time 18:33 Sent To  
Notes
2002-10-08 00:00:00CHECKLIST:
 1-SURVEY AND PLANS DON'T MATCH. SURVEY
 SHOWS OLD HOUSE. NOT THE NEW LAYOUT.
 2-PROVIDE RECEIPT OF PAID IMPACT FEES.
 3-NOTICE OF COMMENCEMENT WASN'T RECORDED
 IN THE COURTHOUSE.
 4-WINDOW SCHEDULE IS NOT CLEAR. EXTERIOR
 ELEVATIONS SHOW SINGLE HUNG WINDOWS.
 PRODUCT APPROVAL SUBMITTED IS FOR
 CASEMENT WINDOWS. ALSO, CLARIFY SIZES
 CALLED ON WINDOW SCHEDULE. EG: WHAT IS
 A PELLA #322020? ETC.
 5-SOIL TEST REPORT TO HAVE ORIGINAL SEAL
 AND SIGNATURE AS REQ'D BY CHAPTER 471
 FL. STATUTES WHEN SUBMITTING DOCUMENTS
 FOR PUBLIC RECORDS.
 6-THERE WASN'T PRODUCT APPROVAL & STRUC-
 TURAL SPECS SUBMITTED FOR THE EPICORE
 FLOOR SYSTEM TO BE USED. SEC 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 7-ARCHITECT TO PROVIDE REVIEW STAMP AT
 ANY PRODUCT APPROVAL OR SHOP DRAWING.
 THIS SHOW PROOF OF REVIEW DONE BY HIM.
 8-ITEM #14 FROM PREVIOUS CHECKLIST IS
 STILL UNCLEAR.SOME STRUCTURAL WALL
 SECTIONS SHOW MONOLITHIC CONCRETE SLAB
 AND OTHERS SHOW CONCRETE SLAB WITH
 EXPANSION JOINT. CLARIFY WHY?.
 RESPONSE TO ITEM #14 CALLS FOR ALL CON
 CRETE WORK TO BE MONOLITHIC. SEE STRUC
 TURAL WALL SECTIONS AND CLARIFY.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 9-WHERE IS THE BEAM SCHEDULE? SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 10-PROVIDE PRODUCT APPROVAL FOR:
 A)SKYLIGHT.
 B)INSWING FRENCH DOORS AS SHOWN ON PLANS
 C)INSWING FRENCH DOORS WITH TRANSOM
 ABOVE SINGLE ASSEMBLY AS SHOWN ON PLAN
 D)FIXED WINDOWS. SEE SIZES ON PLANS BY
 STAIRWAY AND AT MASTER BATHROOM.
 E)ROOF TILE.
 F)FLAT ROOF SYSTEM.
 G)FIREPLACE UL LISTING AND SPECS.
 H)BBQ UL LISTING AND SPECS.
 11-SPECIFY HOW TO GET THE R-11 INSUL. AT
 MASONRY WALLS AS SPECIFIED ON THE
 ENERGY CALCS.SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 12-PROVIDE FRAMING DETAILS FOR SKYLIGHT.
 BUILDING SECTION ON SHEET A-10 DOESN'T
 HAVE ENOUGH STRUCTURAL INFORMATION.
 SPECIFY ALL FASTENERS. ETC.SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 13-CLARIFY IF USING STORM SHUTTERS OR
 MISSILE IMPACT GLASS GLAZING. PRODUCT
 APPROVAL SUBMITTED IS FOR MISSILE
 IMPACT GLAZING. IF USING STORM SHUTTER
 THEN PROVIDE KEY PLAN AND COMPLETE
 INSTALLATION SCHEDULE. ALSO, SPECIFY
 ON PRODUCT APPROVAL DWGS SPECIFIC
 MOUNTING CONDITIONS AND ANCHORS TYPE &
 SPACING TO BE USED. SEC. 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001 & CITY STANDARD
 FOR STORM SHUTTERS INSTALLATION.
 14-OWES $793.83 FOR UPDATED VALUE AND
 RADON FEES.
 15-PROVIDE SHORING PLANS AND SPECIFICA-
 TIONS FOR INSTALLATION OF CONCRETE
 FLOOR SYSTEM AS CALLED FOR EPICORE
 SYSTEM. SEC. 104.2.1.2 CITY AMENDMENTS

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-07-29 Cont ID  
Sent By pkrauss Date 2002-10-03 Time 15:52 Rev Time 0.00
Received By jgomez Date 2002-07-29 Time 11:14 Sent To  
Notes
2002-07-29 00:00:00CHECKLIST:
 1-PAY IMPACT FEES TO PALM BEACH COUNTY.
 BRING STAMPED DWGS & PAID RECEIPT.
 2-NEED RECORDED NOTICE OF COMMENCEMENT.
 3-SURVEY AND PLANS DON'T MATCH.
 4-DRAWINGS SHALL HAVE THE INFORMATION
 REQUIRED BY SEC. 1606.1.7 FBC 2001.
 5-ENGINEER TO SIGN, SEAL AND DATE DWGS
 S-3 AND S-6.
 6-PROVIDE COMPLETE STRUCTURAL SECTION/
 DETAIL AT INTERIOR STAIR.
 **REVISE RISER/TREAD RATIO SHOWN ON EXT.
 STAIRS. SEE EXCEPTION ON SEC. 1007.3.1
 7-PROVIDE WINDOW SCHEDULE & KEY PLAN TO
 CHECK FOR EGRESS. SEC. 1005.4.4 FBC.
 SH OR CASEMENT WINDOWS. SEE ELEVATIONS
 8-NEED ATTIC ACCESS @ ROOF ABOVE LAUNDRY
 SEC. 2309.6 FBC 2001.
 9-PROVIDE SOIL TEST REPORT.
 10-CLARIFY DESIGN PRESSURES SPECIFIED
 FOR EXTERIOR OPENINGS. SEE ELEVATIONS.
 11-PROVIDE COMPLETE DRAWINGS/SPECS FOR
 PRECAST RAILINGS REVIEWED BY ARCHITECT
 12-PROVIDE COMPLETE STRUCTURAL INFO. FOR
 EPICORE CONCRETE SYSTEM TO BE USED.
 **ENGINEER TO REVIEW ALL INFORMATION
 PRIOR TO SUBMITTAL.
 *SPECIFY REINFORCEMENT AROUND OPENINGS.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC
 13-ARCHITECT TO REVIEW ALL PRODUCT
 APPROVALS. SEE NOTES ON DWG A-9.
 14-SOME STRUCTURAL WALL SECTIONS SHOW
 MONOLITHIC CONCRETE SLAB AND OTHERS
 CONCRETE SLAB WITH EXPANSION JOINT.
 CLEARLY IDENTIFY ON PLANS AREAS TO
 HAVE EXP. JOINT OR MONOLITHIC SLAB.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 15-PROVIDE COMPLETE STEEL COLUMN SCHED.
 SPECIFY TOP & BOTTOM CONNECTIOS.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC
 16-PROVIDE COMPLETE BEAM AND LINTEL
 SCHEDULE AND KEY PLAN.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC
 17-PROVIDE SPECIFICATIONS/DIMENSIONS FOR
 CHIMNEY TO COMPLY WITH CLEARANCES
 REQUIRED ON SEC. 2804.2.4 FBC 2001.
 18-PROVIDE COMPLETE STRUCTURAL WALL
 SECTION THRU FIREPLACE. SEE SECTIONS
 2114 AND CHAPTER 28 FBC 2001.
 19-PROVIDE PRODUCT APPROVAL FOR:
 A)SKYLIGHT
 B)INSWING FRENCH DOORS AS SHOWN ON PLANS
 C)FIXED WINDOWS AS SHOWN ON PLANS.
 D)ROOF TILE.
 E)FLAT ROOF SYSTEM.
 F)GLASS BLOCK.
 G)FIREPLACE UL LISTING & SPECS REVIEWED
 BY ARCHITECT. BBQ UL LISTING & SPECS.
 20-PROVIDE FRAMING DETAILS FOR SKYLIGHT.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 21-SPECIFY SAFETY GLASS WHERE REQUIRED.
 SEE COMMENTS ON PLANS. SEC. 2405.2.2.
 22-PROVIDE 2X STRUCTURAL BUCK DETAIL FOR
 EXTERIOR DOORS. SEE PRODUCT APPROVALS
 & SEC. 1707.4.4.2 FOR REQUIREMENTS.
 23-SEE PLANS FOR ADDITIONAL COMMENTS AND
 PLEASE RETURN REVIEWED SET AFTER THE
 CORRECTIONS ARE DONE TO THE ORIGINAL
 DRAWINGS TO EXPEDITE REVIEW PROCESS.
 24-PROVIDE AREA TABULATION SEPARATING
 BALCONY AREAS, PORCH AREAS TO PROPERLY
 ASSESS THE RADON AND CONSTRUCTION
 VALUE.

Review Stop REV REVISIONS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2002-06-20 Cont ID  
Sent By sgraham Date 2002-06-20 Time 16:18 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved