| Plan Review Stops For Permit 02051538 |
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2002-06-10 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-06-10 |
Time |
09:21 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-06-10 |
Time |
09:21 |
Sent To |
|
|
| Notes |
| 2002-06-10 00:00:00 | PASSED - PROVISO- PUMP TANK SHALL BE | | | VENTED PER FBC-2001 PLUMBING TABLE | | | 916.5.1 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-06-08 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-06-08 |
Time |
08:45 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-06-08 |
Time |
08:45 |
Sent To |
|
|
| Notes |
| 2002-06-08 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | | | | 1) SUBMIT MANUFACTURE INFORMATION FOR | | | PUMP. LISTED AGENCY APPROVAL REQUIRED. | | | 2) PUMP SHALL BE VENTED PER TABLE | | | 916.5.1 | | | 3) CHECK VALVE AND GATE VALVE REQUIRED. | | | A GATE VALVE LOCATED ON THE DISCHARGE | | | SIDE OF THE CHECK VALVE SHALL BE INST- | | | ALLED IN THE PUMP PIPING BETWEEN THE | | | PUMP OR EJECTOR AND THE GRAVITY SEWER. | | | SEC 712.2 | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
|