| Plan Review Stops For Permit 02050463 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2002-12-27 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2002-12-27 |
Time |
13:57 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2002-12-27 |
Time |
13:57 |
Sent To |
|
|
| Notes |
| 2002-12-27 00:00:00 | CHECKLIST: | | | 1-PERMIT #02050463 IS FOR WORK AT MAIN | | | HOUSE. THIS GAZEBO IS COMPLETE NEW | | | CONSTRUCTION. THEREFORE, A SEPARATE | | | PERMIT AND SEPARATE REVIEWS BY ZONING | | | AND BUILDING ARE REQUIRED. | | | APPLY FOR A SEPARATE PERMIT. | | | | | | **NOTES: | | | A) ARCHITECT TO PROVIDE ALL INFORMATION | | | REQUIRED BY SECTION 1606.1.7 OF FBC | | | 2001. | | | B) PLANS SUBMITTED ARE VERY INCOMPLETE. | | | MISSING BEAMS, TRUSS CONNECTORS, | | | ANCHOR BOLTS FOR COLUMNS TOP PLATE, | | | CALCULATED UPLIFT LOADS FOR ROOF AND | | | COLUMNS, SIZE OF COL. BOTT. PLATE. | | | C) CLARIFY FOOTING SIZES FOR COLUMNS AND | | | CONCRETE SLAB EDGES. | | | D)ARCHITECT TO PROVIDE ALL HIS INFORMA- | | | TION AS REQUIRED BY CHAPTER 481 OF | | | FLORIDA STATUTES WHEN SUBMITTING | | | DOCUMENTS FOR PUBLIC RECORDS. | | | | | | | | | *************** REMAINDER ************* | | | | | | PROVIDE INFORMATION REQUESTED ON PROVISO | | | DATED 6-22-02 TO AVOID ANY DELAYS OR | | | CONFLICTS TO OBTAIN THE FINAL C.O. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2002-06-25 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-12-27 |
Time |
08:54 |
Rev Time |
3.00 |
| Received By |
jgomez |
Date |
2002-06-22 |
Time |
16:59 |
Sent To |
|
|
| Notes |
| 2002-06-24 00:00:00 | APPROVED WITH PROVISO: | | | 1-THERE ARE TWO DIFFERENT GABLE END | | | DETAILS. SEE SHEET A6 & A7. PROVIDE | | | ONLY ONE DETAIL AND SPECIFY ALL | | | STRUCTURAL MEMBERS AND ALL FASTENERS. | | | **PROVIDE DIAGRAM AND CALCULATIONS | | | SHOWING HOW IS GABLE END CONTINUOUS IN | | | ORDER TO COMPLY WITH SECTION 2313.4.1 | | | FBC 2001. | | | 2-ARCHITECT TO PROVIDE ALL MINIMUM. | | | INFORMATION REQUIRED ON DRAWINGS. SEE | | | SECTION 1606.1.7 FBC 2001 FOR MINIMUM | | | INFORMATION REQUIRED TO BE ON PLANS. | | | 3-SECTION A- A6 DOESN'T MATCH ENGINEERED | | | TRUSS INFORMATION SUBMITTED. THESE ARE | | | TWO COMPLETE DIFFERENT STRUCTURAL | | | CONCEPTS. | | | **ARCHITECT TO SPECIFY CONNECTORS OF | | | TRUSS TO THE STRUCTURE. | | | 4-ARCHITECT TO SPECIFY HOW IS CONTINUOUS | | | SUPPORT PROVIDED FOR GABLE END TRUSS @ | | | GABLE END TRUSS LOCATED ABOVE KITCHEN | | | AREA. ALSO, SPECIFY ALL CONNECTORS. | | | 5-SPECIFY HOW ARE NEW TRUSSES ATTACHED | | | TO EXISTING ROOF. | | | 6-PROVIDE COMPLETE ENGINEERED TRUSS | | | PACKAGE WITH ORIGINAL SIGNATURE, SEAL | | | AND DATE AS REQUIRED BY CHAPTER 471 | | | FLORIDA STATUTES. | | | **NOTE: ARCHITECT TO REVIEW ALL TRUSS | | | DRAWINGS (USE REVIEW STAMP) PRIOR TO | | | SUBMITTAL. | | 2002-06-22 00:00:00 | | | | 1-ARCHITECT TO PROVIDE COMPLETE DETAIL/ | | | SPECS FOR ANCHORING GABLE END TRUSS | | | THAT IS SITUATED BETWEEN EXISTING |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2002-06-12 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-06-21 |
Time |
14:21 |
Rev Time |
3.00 |
| Received By |
jgomez |
Date |
2002-06-12 |
Time |
15:13 |
Sent To |
|
|
| Notes |
| 2002-06-12 00:00:00 | CHECKLIST: | | | 1-PAY IMPACT FEES TO PALM BEACH COUNTY | | | AFTER CORRECTIONS ARE DONE TO ORIGINAL | | | DWGS. BRING STAMPED DWGS & PD. RECEIPT | | | 2-NEED RECORDED NOTICE OF COMMENCEMENT. | | | 3-PROVIDE COMPLETE SECTIONS, DETAILS AND | | | SPECS AT KITCHEN AREA WHERE EXISTING | | | BEARING WALL IS REMOVED TO ALLOW FOR | | | KITCHEN EXPANSION. SPECIFY SHORING, | | | NEW BEAM, BEAM SUPPORTS ETC.SECTION | | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | | 4-REVISE UPDATE ALL PLANS AS REQ'D AND | | | PROVIDE ALL MIN. INFORMATION. SECTION | | | 1606.1.7 FBC/01. SEE COMMENTS ON PLANS | | | 5-CONNECTORS SPECIFIED ON TRUSS ANCHOR | | | SCHEDULE DON'T THE RESIST THE UPLIFT | | | LOADS CALCULATED ON ROOF FRAMING PLAN. | | | REVISE AS REQ'D. SEE COMMENTS ON PLANS | | | 6-PROVIDE SOIL TEST REPORT. SECTION | | | 1804.2.2 CITY AMENDMENTS TO FBC 2001. | | | 7-PROVIDE GABLE END DETAILS THAT COMPLY | | | WITH SECTION 2313.4.3 FBC 2001 FOR | | | CONTINUOUS CONSTRUCTION. | | | NOTE: CONSIDER THE TWO NEW GABLE ENDS | | | ON RIGHT HAND ELEVATION. | | | 8-OWNER/AGENT TO SIGN AND DATE BOTTOM OF | | | ENERGY CALCULATIONS. | | | | | | NOTE: | | | PLEASE, RETURN REVIEWED SETS AFTER | | | ORIGINAL DWGS ARE REVISED TO EXPEDITE | | | THE REVIEW PROCESS. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2002-09-26 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-09-26 |
Time |
12:36 |
Rev Time |
1.00 |
| Received By |
btrobaug |
Date |
2002-09-26 |
Time |
11:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2002-06-21 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-06-21 |
Time |
14:21 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2002-06-20 |
Time |
13:03 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2002-05-22 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-05-22 |
Time |
18:13 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-05-22 |
Time |
17:48 |
Sent To |
P |
|
| Notes |
| 2002-05-22 00:00:00 | ************ UNSAT ******************** | | | | | | 1)NOTE: PLEASE SHOW ALL EXISTING | | | ELECTRICAL FOR HOUSE. PLEASE NOTE | | | BRINGING SD`S UP TO CODE INSIDE AND | | | OUTSIDE ALL EXISTING BEDROOMS ALSO PER | | | NFPA-72 2-2.1.1.1. | | | | | | | | | 2)) NOTE: PLEASE NOTE FRONT AND REAR | | | RECEPTS REQ`D PER 210-52E | | | | | | 3 NOTE: PLEASE SUBMIT AIC RATINGS FOR | | | ALL NEW EQUIPMENT BEING INSTALLED. | | | MAINS/PANELS/BREAKERS MUST BE RATED FOR | | | THE AVAILABLE FAULT CURRENT PER 110-9. | | | | | | 4) NOTE: PLEASE LIST THE REQ`D BATH(S) | | | CIRCUIT(S). PER 210-11-C-3 | | | MUST BE 20A AND #12AWG. | | | | | | 5 )NOTE: PLEASE LIST THE REQ`D ARC | | | FAULT PROTECTED CIRCUITS ON PANEL | | | SCHEDULE. PER 210-12 | | | | | | 6)NOTE: PLEASE NOTE OUTLET SPACING FOR | | | KITCHEN COUNTERSPACE AND PENINSULAR. | | | 210-52-C-1,2,3,4,5 | | | | | | 7)NOTE: PLEASE NOTE OCP SHOWN FOR AHU`S | | | NEEDS TO MEET 424-3B | | | | | | 8)NOTE: PLEASE NOTE OTHER OCP SIZES | | | EXCEED MAX 150% OCP FOR WATER HEATER AND | | | DRYER. PLEASE VERIFY LOAD SHOWN FOR | | | DRYER, SHOWN AS 4KW(UNCOMMON LOAD)?? | | | | | | 9)NOTE: PLEASE SHOW ON RISER DIAGRAM | | | FOOTER STEEL AS SHOWN ON NOTE#7. | | | | | | 10)NOTE: PLEASE SHOW SECOND AHU ON PLANS | | | | | | 11)NOTE: PLEASE SHOW SERVICE LOCATION | | | ON PLANS/PANEL/METER/. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE NAY QUESTIONS, | | | PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
N |
Date |
2002-06-25 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-05-13 |
Time |
16:02 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2002-05-13 |
Time |
16:02 |
Sent To |
Z |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2002-12-27 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-12-27 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-12-27 |
Time |
08:54 |
Sent To |
B |
|
| Notes |
| 2002-12-27 00:00:00 | TO JULIO GOMEZ |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2002-09-13 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2002-09-13 |
Time |
09:35 |
Rev Time |
0.40 |
| Received By |
pkrauss |
Date |
2002-09-13 |
Time |
09:34 |
Sent To |
|
|
| Notes |
| 2002-09-13 00:00:00 | PROVIDE DUCT SIZE ON PLAN. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2002-05-30 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2002-05-30 |
Time |
16:19 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2002-05-30 |
Time |
16:11 |
Sent To |
B |
|
| Notes |
| 2002-05-30 00:00:00 | PROVISO: | | | | | | CONDENSATE SHALL DISCHARGE A MINIMUM OF | | | 12" AWAY FROM THE BUILDING STRUCTURE AS | | | PER 2001 FBC 1503.4.4. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2002-05-29 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-09-26 |
Time |
11:33 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2002-05-29 |
Time |
17:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2002-05-16 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2002-06-25 |
Time |
14:38 |
Rev Time |
0.25 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|