| Plan Review Stops For Permit 02050051 |
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2002-06-07 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-06-07 |
Time |
08:44 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-06-07 |
Time |
08:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-05-19 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2002-05-19 |
Time |
06:44 |
Rev Time |
1.00 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2002-05-19 00:00:00 | PLUMBING PLAN REVIEW, DENIED.PES | | | 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS | | | EQUIPMENT TO VERIFY COMPLIANCE WITH | | | STANDARDS NFPA 54, NFPA 58, AND THE | | | STANDARD GAS CODE SEC. 402. | | | 7. INDICATE THE DELIVERY PRESSURE (PSI) | | | PER STANDARD GAS CODE SEC. 305.2. IF | | | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. | | | 4. BTU LOAD OF EACH APPLIANCE AND THE | | | TOTAL BTU LOAD ON THE SYSTEM. REFER TO | | | THE STANDARD GAS CODE SECS. 305.2 THRU | | | 305.4 AND TABLES 305.4(A) THRU 305.4(E). | | | 3. TYPE OF GAS, (LP OR NATURAL) | | | END OF COMMENTS PAUL SCHMITZ | | | QUESTIONS, 561-659-8096 |
|
|
|