Plan Review Details - Permit 02041746
| Plan Review Stops For Permit 02041746 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2002-05-30 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-05-30 |
Time |
13:00 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2002-05-13 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-05-13 |
Time |
17:54 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-05-13 |
Time |
17:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2002-05-17 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-05-17 |
Time |
10:28 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-05-17 |
Time |
10:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2002-08-29 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2002-08-29 |
Time |
16:42 |
Rev Time |
0.50 |
| Received By |
hmoser |
Date |
2002-08-29 |
Time |
16:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2002-05-30 |
|
|
Cont ID |
|
| Sent By |
ndenmark |
Date |
2002-05-30 |
Time |
06:56 |
Rev Time |
0.33 |
| Received By |
ndenmark |
Date |
2002-05-30 |
Time |
06:56 |
Sent To |
|
|
| Notes |
| 2002-05-30 00:00:00 | PROVISO: | | | | | | FAN SHUT DOWN BY DUCT SMOKE DETECTOR | | | WITH HORN AND STROBE FOR NOTIFICATION | | | REQUIRED. | | | | | | SEPARATE PLANS AND PERMIT REQUIRED FOR | | | COOLER/FREEZER |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2002-08-29 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-08-29 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-08-29 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2002-08-29 00:00:00 | REVISION OK - DUAL SAMPLE POINTS IN | | | GREASE LINE. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2002-06-07 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-06-07 |
Time |
14:35 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-06-07 |
Time |
14:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-05-18 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-05-18 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-05-18 |
Time |
14:29 |
Sent To |
|
|
| Notes |
| 2002-05-18 00:00:00 | DENIED | | | REFERENCE: FBC-2001 CHAPTER 11 | | | FBC-2001 PLUMBING | | | | | | 1) SHT A-3 SAMPLE POINT SHALL BE FOR | | | GREASE WASTE ONLY. SEPARATE 3-COMPART- | | | MENT SINK, FLOOR DRAIN, AND MOP SINK | | | THEN INSTALL SAMPLE POINT. AFTER SAMPLE | | | POINT THEN TIE INTO SANITARY | | | 2) SHT A-3 SANITARY RISER DIAGRAM SHALL | | | REFLECT THE FLOOR PLAN, TOILET ROOMS DO | | | NOT TIE IN AFTER 3-COMP SINK ECT. | | | 3) SHT A-3 HUB DRAIN NOT APPROVED FOR | | | INDIRECT WASTE. (ICE/SODA MACHINE) FLOOR | | | SINK REQUIRED FOR ALL INDIRECT WASTE. | | | SEC 802.3 | | | 4) SHT A-3 WATER FILTRATION SYSTEM FOR | | | ICE MACHINE SHALL BE NSF APPROVED. | | | PLEASE PROVIDE MANUFACTURE INFORMATION. | | | 5) SHT A-3 DRINKING FOUNTAIN REQUIRED | | | TABLE 403.1. ALSO SEE 410.1 BOTTLED | | | WATER REQUIREMENT ARI-1010 IF USED SUB- | | | MIT MANUF. INFO SHOWING COMPLIANCE. | | | 6) SHT A-3 TOILET ROOM ELEVATIONS, URNAL | | | SHALL BE 17" TO LIP AFF MAX. | | | 7) SHT A-3 WATER RISER DIAGRAM, AIR | | | CHAMBERS NOT APPROVED (NOTE #4). | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
|