| Plan Review Stops For Permit 02030183 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2002-09-11 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-09-11 |
Time |
10:57 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2002-09-11 |
Time |
10:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2002-05-31 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-05-31 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2002-05-14 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-05-14 |
Time |
09:43 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2002-04-05 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2002-04-05 |
Time |
09:00 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2002-04-05 00:00:00 | THE ADDITION OF A SECOND STORY WILL | | | CAUSE THIS BUILDING TO EXCEED THE | | | ALLOWABLE ARE FOR A TWO STORY GROUP F | | | OCCUPANCY, TYPE IV, FS CONSTRUCTION AS | | | PROVIDED FOR IN FBC TABLE 500.THIS | | | PROPOSED WORK DOES NOT COMPLY WITH | | | MEZZANINE REQUIREMENTS SO IT WAS NOT | | | REVIEWED IN THAT CONTEXT. | | | | | | WHAT WILL THE USE OF THIS SPACE BE?SEE | | | FBC 104.3.1.1 FOR THE MINIMUM REVIEW | | | CRITERIA, AND ADDRESS THE ITEMS | | | PERTINENT TO THIS WORK.SEE ALSO FBC | | | 1606.1.7 INFORMATION ON DRAWINGS. | | | | | | THIS BUILDING WAS CONSTRUCTED AS A | | | FACTORY INDUSTRIAL OCCUPANCY, IT | | | APPEARS THAT THE PROPORTION OF OFFICE | | | USE, GROUP B, MAY RESULT IN A CHANGE OF | | | OCCUPANCY.THE CHANGE MUST MEET THE | | | BUILDING CODE RESQUIREMENTS FOR THAT | | | USE AND IMPACT FEES ADJUSTED WITH THE | | | COUNTY. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2002-08-29 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-08-29 |
Time |
05:42 |
Rev Time |
0.50 |
| Received By |
dpalmer |
Date |
2002-08-29 |
Time |
05:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2002-06-05 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-06-05 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-06-05 |
Time |
12:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2002-05-16 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-05-16 |
Time |
06:36 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-05-16 |
Time |
06:36 |
Sent To |
|
|
| Notes |
| 2002-05-16 00:00:00 | ************ NOTE *********** | | | | | | PLEASE NOTE THAT ELECTRICAL PLANS SEEM | | | TO BE OK. HOWEVER CONTRACTOR NEEDS TO | | | COME IN AND TAKE ALL REVISED SHEETS OUT | | | AND INSERT NEW REVISED SHEETS TO MAKE | | | THE SETS REQUIRED. | | | | | | IF THERE ARE ANY QUESTIONS, PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2002-03-15 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2002-03-15 |
Time |
06:46 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2002-03-15 |
Time |
06:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2002-03-12 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2002-03-12 |
Time |
15:34 |
Rev Time |
0.00 |
| Received By |
mamini |
Date |
2002-03-12 |
Time |
15:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2002-08-29 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-08-29 |
Time |
15:21 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-08-29 |
Time |
15:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2002-06-06 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-06-06 |
Time |
08:54 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-06-06 |
Time |
08:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2002-05-14 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-05-14 |
Time |
16:40 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-05-14 |
Time |
16:40 |
Sent To |
|
|
| Notes |
| 2002-05-14 00:00:00 | 1) ANOTHER EXIT SIGN IS NEEDED IN | | | WORK AREA # 2 TO DIRECT PERSONS TO | | | WORK AREA # 1. | | | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2002-04-02 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2002-04-02 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2002-04-02 |
Time |
14:24 |
Sent To |
|
|
| Notes |
| 2002-04-02 00:00:00 | A) PLEASE EXPLAIN EXITING RATIONALE FOR | | | SECOND FLOOR. IT APPEARS THAT ONLY | | | A SINGLE MEANS OF EGRESS IS PRESENT FROM | | | THE SECOND FLOOR. | | | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2002-09-10 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2002-09-10 |
Time |
11:04 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2002-09-10 |
Time |
10:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2002-08-20 |
|
|
Cont ID |
|
| Sent By |
ndenmark |
Date |
2002-08-20 |
Time |
11:41 |
Rev Time |
0.25 |
| Received By |
ndenmark |
Date |
2002-08-20 |
Time |
11:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2002-05-28 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2002-05-28 |
Time |
14:28 |
Rev Time |
0.40 |
| Received By |
pkrauss |
Date |
2002-05-28 |
Time |
14:28 |
Sent To |
|
|
| Notes |
| 2002-05-28 00:00:00 | MECHANICAL PERMIT 02030186 | | | PLANS APPROVED PER NANCY DENMARK 3/25/02 | | | | | | RESUB 5/2/02 - DELETED SECOND FLOOR |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2002-03-25 |
|
|
Cont ID |
|
| Sent By |
ndenmark |
Date |
2002-03-25 |
Time |
15:04 |
Rev Time |
0.33 |
| Received By |
ndenmark |
Date |
2002-03-25 |
Time |
15:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2002-08-31 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-08-31 |
Time |
09:25 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-08-31 |
Time |
09:25 |
Sent To |
|
|
| Notes |
| 2002-08-31 00:00:00 | REVISION OK - MOVED SINK IN COUNTER - | | | MOVED DRINKING FOUNTAIN ACROSS CORRIDOR | | | AND CHANGED FROM HIGH/LOW TO SINGLE. - | | | CUP DISP REQD. A-1 - P2.1 - P3.1 - P5.1 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2002-06-12 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-06-12 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-06-12 |
Time |
14:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2002-05-25 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-05-25 |
Time |
13:11 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-05-25 |
Time |
13:02 |
Sent To |
|
|
| Notes |
| 2002-05-25 00:00:00 | DENIED | | | REFERENCE: FBC-2001 CHAPTER 11 | | | FBC-2001 PLUMBING | | | | | | 1) FROM PREVIOUS REVIEW, SHOWER STALL, | | | SECTIONS 4.21.3, 4.21.5, 4.21.6, (60" | | | MINIMUM - 59" SHOWN), & 4.21.7 HAVE NOT | | | BEEN ADDRESSED. | | | 2) FROM PREVIOUS REVIEW, SHTS P2.1 AND | | | P5.1 STILL SHOW FLOOR DRAINS AT WATER | | | HEATER. PLEASE CHANGE PLANS TO SHOW A | | | FLOOR SINK FOR INDIRECT WASTE. | | | 3) WHEN SUBMITTING PLANS PLEASE REMOVE | | | ALL SHEETS THAT HAVE BEEN REVISED AND | | | INSERT NEW SHEET. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2002-04-04 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-04-04 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
2002-04-04 |
Time |
11:09 |
Sent To |
|
|
| Notes |
| 2002-04-04 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FACBC-97 | | | | | | 1) SHT PO.1 PLUMBING NOTES #13, REMOVE | | | ALL REFERENCES TO AIR CHAMBERS. AIR | | | CHAMBERS ARE NOT APPROVED IN FBC-2001 | | | 2) SHOWER STALL ROOM NOT WIDE ENOUGH. | | | SEE SECTIONS 4.21, 4.21.2, 4.21.3, | | | 4.21.4, 4.21.5, 4.21.6 AND 4.21.7. | | | 3) SUBMIT DETAIL FOR SHOWER STALL. SEE | | | FIGS 35(A) & 35(B). COMPLY WITH FACBC | | | SECTIONS 4.23,4.23.2, & 4.23.3. | | | 4) WATER HEATER. PROVIDE DETAIL FOR | | | RELIEF OUTLET WASTE. IF DISCHARGE IS BE- | | | ING DRAINED INTO FLOOR DRAIN, ALL IN- | | | DIRECT WASTE SHALL BE DRAINED TO A FLOOR | | | SINK. PLEASE CLAIRFY. FBC-2001 SECS | | | 504.7 & 504.7.1 | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2002-06-12 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-06-12 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
kstevens |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|