Plan Review Details - Permit 02022365
Plan Review Stops For Permit 02022365
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2002-09-10 Cont ID  
Sent By hpiskura Date 2002-09-10 Time 15:31 Rev Time 0.00
Received By hpiskura Date 2002-09-10 Time 14:16 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2002-08-12 Cont ID  
Sent By hpiskura Date 2002-08-12 Time 10:52 Rev Time 0.00
Received By hpiskura Date   Time   Sent To Z
Notes
2002-08-12 00:00:00THE STRUCTURAL SHEETS, S1 AND S2,
 DECLARE THE FOUNDATION DESIGN FOR A
 "BUTLER PRE-MANUF METAL BLDG FORCES AS
 CALCULATEDBY SOUTHERN CONSTRUCTION
 SYSTEMS, INC."THE METAL BLDG
 INFORMATION SUBMITTED IS FOR A "STAR
 BUILDING SYSTEMS"PLEASE REVISE AS
 NECESSARY.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2002-04-01 Cont ID  
Sent By hpiskura Date 2002-04-01 Time 09:27 Rev Time 0.00
Received By hpiskura Date   Time   Sent To Z
Notes
2002-04-01 00:00:00THERE IS NO INFOMATION ON THE PLANS FOR
 THE METAL BUILDING PROPOSED ON THE
 PERMIT APPLICATION.
  
 ENGINEER OF RECORD PLEASE NOTE IF DESIGN
 FOR WIND IS ASCE 7-95 OR SBC 1606.2.
  
 THE NEW CONSTRUCTION MAY BE SUBJECT TO
 IMPACT FEES COLLECTED BY THE COUNTY FOR
 THE CITY.THE PERMIT PLANS MUST BE
 STAMPED BY THAT OFFICE AND A COPY OF
 THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION.CALL 233-5025 FOR MORE
 INFORMATION

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-03-19 Cont ID  
Sent By dpalmer Date 2002-03-19 Time 19:08 Rev Time 0.00
Received By dpalmer Date 2002-03-19 Time 18:32 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2002-03-07 Cont ID  
Sent By mamini Date 2002-03-07 Time 13:58 Rev Time 1.00
Received By mamini Date 2002-03-07 Time 13:58 Sent To  
Notes
2002-03-07 00:00:00PASSED:
 1. SEE PERMIT # 02022365 FOR UNDERGROUND
 UTILITIES /SITE WORKS FOR THIS PHASE.
 IF ANY QUESTIONS PLEASE CONTACT 659-8096
 EXT.8492 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2002-03-07 Cont ID  
Sent By mcarsill Date 2002-03-07 Time 11:19 Rev Time 0.00
Received By mcarsill Date 2002-03-07 Time 11:19 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2002-03-25 Cont ID  
Sent By ndenmark Date 2002-03-25 Time 14:43 Rev Time 0.25
Received By ndenmark Date 2002-03-25 Time 14:43 Sent To  
Notes
2002-03-25 00:00:00NO MECHANICAL INFORMATION PROVIDED
 PROVIDE MECHANICAL PLANS PRIOR TO ANY
 MECHANICAL WORK BEING STARTED WHERE
 PERMIT IS REQUIRED.

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-05-11 Cont ID  
Sent By kstevens Date 2002-05-11 Time 13:16 Rev Time 0.00
Received By kstevens Date 2002-05-11 Time 13:16 Sent To  
Notes
2002-05-11 00:00:00PASSED/PROVISO
  
 BACKFLOW PREVENTERS REQUIRED ON EACH
 BLDG.

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-03-19 Cont ID  
Sent By kstevens Date 2002-03-19 Time 16:31 Rev Time 1.25
Received By kstevens Date 2002-03-19 Time 16:31 Sent To  
Notes
2002-03-19 00:00:00DENIED
 REFERENCE: SPC-94
  
 1) SHT P-1 BLDG A QUARANTINE BLDG, CENT-
 ER RUN 6" PVC SANITARY LINE, C/O REQD
 NOT SHOWN ON PLAN
 2) SHT P-1 BLDG A QUARANTINE BLDG. VENT
 REQUIRED BEFORE FIRST DRAINS. SPC SEC
 921.4.2 - SHOW VENTS ON RISER DIAGRAM
 ALSO.
 3) BACKFLOW REQUIRED ON WATER SERVICE TO
 EACH BLDG.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop Z ZONING
Rev No 1 Status P Date 2002-08-13 Cont ID  
Sent By hpiskura Date 2002-09-03 Time 07:49 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***