Plan Review Details - Permit 02020454
Plan Review Stops For Permit 02020454
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2002-03-06 Cont ID  
Sent By pkrauss Date 2002-02-21 Time 14:04 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2002-03-06 00:00:00NEEDS COUNTY IMPACT FEE REVIEW

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-03-14 Cont ID  
Sent By dpalmer Date 2002-03-14 Time 06:34 Rev Time 0.00
Received By dpalmer Date 2002-03-14 Time 06:34 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-02-12 Cont ID  
Sent By dpalmer Date 2002-02-12 Time 14:13 Rev Time 0.00
Received By dpalmer Date 2002-02-12 Time 14:13 Sent To P
Notes
2002-02-12 00:00:00***************** UNSAT **************
  
 1)NOTE: PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW EQUIPMENT BEING INSTALLED.
 MAINS/PANELS/BREAKERS MUST BE RATED FOR
 THE AVAILABLE FAULT CURRENT PER 110-9.
  
 2)NOTE: PLEASE NOTE THAT MAIN DISCONNECT
 IS NOT SHOWN NEXT TO METERCAN. PLEASE
 SHOW.
  
 3)NOTE: PLEASE NOTE THAT NEW A/C COND.
 UNITS IS NOT SHOWN. DISC PER 440-11 AND
 GFI PER 309.2 MECH CODE
  
 4)NOTE: PLEASE NOTE THAT EQUIPMENT
 GROUNDING IS MISSING BETWEEN MAIN DISC
 AND PANEL.PER 250-122
  
 5)NOTE: PLEASE LOAD FOR WATER HEATER,
 LOAD CALCS SHOW "GAS" AND PANEL SCHEDULE
 SHOW ELECTRICAL.??
  
 6) NOTE: PLEASE LIST THE REQ`D BATH(S)
 CIRCUIT(S) PER 210-11-C-3.
 MUST BE 20A AND #12AWG.
  
 7)NOTE: PLEASE CLARIFY DRYER LOAD?
 PANEL SCHEDULE SHOWS 1-POLE 20A AND LOAD
  
  
 8)NOTE: PLEASE CLARIFY LOAD FOR "NEW"
 AHU. PANEL SCHEDULE SHOWS 60A OCP WITH
 45A LOAD AND LOAD CALCS SHOW 5KW LOAD??
 PLEASE CORRELATE.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-06-08 Cont ID  
Sent By hmoser Date 2002-06-08 Time 07:33 Rev Time 0.33
Received By hmoser Date 2002-06-08 Time 07:33 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-02-21 Cont ID  
Sent By pkrauss Date 2002-02-21 Time 14:04 Rev Time 0.35
Received By pkrauss Date 2002-02-21 Time 13:55 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-02-20 Cont ID  
Sent By dpalmer Date 2002-03-14 Time 06:34 Rev Time 0.33
Received By kstevens Date 2002-02-20 Time 17:38 Sent To  
Notes
2002-02-20 00:00:00REVIEWED UNDER SPC-94 CODE.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-02-12 Cont ID  
Sent By sgraham Date 2002-02-12 Time 14:15 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***