| 2002-04-23 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 424.2 SWIMMING POOLS |
| | |
| | 1) ADJUST YOUR PLANS, NOTES, DETAILS, & |
| | SUBMITTALS TO REFLECT THE FOLLOWING IN- |
| | FORMATION REQUIRED FOR POOL PLUMBING |
| | PERMITS. |
| | A) |
| | COMPLY WITH FBC-2001 SEC 424.2 |
| | PRIVATE SWIMMING POOLS. |
| | B) |
| | FBC-2001 SEC 424.2.6.1 ENGINEERING |
| | DESIGN, CONSTRUCTION AND WORKMANSHIP. |
| | ANSI/NSPI-4 92. |
| | C) |
| | FBC-2001 SEC 424.2.6.6.5 WHERE PROVIDED, |
| | THE VACUUM OR PRESSURE CLEANER FITTING |
| | SHALL BE LOCATED AT LEAST 6" AND NOT |
| | GREATER THAN 12" BELOW THE MINIMUM OPER- |
| | ATING WATER LEVEL OR AS AN ATTACHMENT TO |
| | THE SKIMMER. |
| | D) |
| | FBC-2001 SEC 424.2.7.2 PUMPS AND EQUIP- |
| | MENT SHALL BE MOUNTED ON A SUBSTANTIAL |
| | BASE IN A MANNER THAT WILL ELIMINATE |
| | STRAIN ON PIPING. SLAB SHALL BE A NOMIN- |
| | AL 4" THICK. (DETAIL) |
| | E) |
| | FBC-2001 SEC 424.2.9 WATER SUPPLY, LOCAL |
| | ORD. #2853-95, BACKFLOW REQUIRED ON |
| | WATER SERVICE. (ADD TO NOTES) |
| | F) |
| | FBC-2001 SEC 424.2.12.1 PRESSURE TESTS. |
| | PER MANUFACTURE RECOMMENDATIONS, NO AIR |
| | TEST SHALL BE APPROVED FOR PVC PIPE AND |
| | FITTINGS. (ADD TO NOTES) |
| | G) |
| | FBC-2001 SEC 424.2.13.2JOINTS AND CON- |
| | NECTIONS, FBC PLMG SEC 605.21, PURPLE |
| | PRIMER REQUIRED ON PVC PIPING. (ADD TO |
| | NOTES) |
| | 2) FOR FUTURE REFERENCE: WHEN A POOL |
| | HEATER IS INSTALLED, THE FOLLOWING NOTES |
| | DETAILS, SUBMITTALS SHALL BE REQUIRED. |
| | H) |
| | FBC-2001 SEC 424.2.14.1 SWIMMING POOL |
| | WATER HEATERS SHALL BEAR THE LABEL OF A |
| | RECOGNIZED TESTING AGENCY. MANUFACTURE |
| | SHEETS REQUIRED. (SUBMITTAL) |
| | I) |
| | FBC-2001 SEC 424.2.14.2 WATER RETENTION, |
| | PROVIDE A POSITIVE MEANS OF RETAINING |
| | WATER IN THE HEATER WHEN PUMP IS SHUT |
| | OFF. (MANUFACTURE CUT SHEETS SUBMITTAL) |
| | J) |
| | FBC-2001 SEC 424.2.14.4 CONNECTIONS, ALL |
| | WATER HEATING EQUIPMENT SHALL BE INSTAL- |
| | LED WITH FLANGES OR UNION CONNECTIONS |
| | ADJACENT TO THE HEATER. (ADD TO NOTES) |
| | K) |
| | FBC-2001 SEC 424.2.15 GAS PIPING SHALL |
| | COMPLY WITH FBC FUEL GAS. SEPARATE PLANS |
| | AND PERMIT REQUIRED. |
| | 3) SECOND SHEET WITH NOTES AND DETAILS |
| | ARE VERY UNCLEAR AND HARD TO READ. |
| | PLEASE SUBMIT SHEET THAT HAS LARGER |
| | LETTERS AND IS READABLE. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |