| 2002-02-27 00:00:00 | *************BUILDING DENIED********** |
| | 1) IMPACT FEES MUST BE PAID TO PALM |
| | BEACH COUNTY, PLANS STAMPED BY THEM AND |
| | COPY OF RECEIPT SUBMITTED TO CITY OF |
| | WEST PALM BEACH BUILDING DEPARTMENT, |
| | BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| | |
| | 2) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 3) STRUCTURE IS LOCATED IN AN A5 FLOOD |
| | ZONE. THE ENTIRE STRUCTURE WILL BE |
| | REQUIRED TO BE 6" ABOVE THE BASE FLOOD |
| | ELEVATION PER CHAPTER 12 OF THE CITY |
| | MUNICIPAL CODE. PLEASE PROVIDE A SURVEY |
| | INDICATING ELEVATIONS. |
| | |
| | 4) THE LOT NUMBER LISTED ON SHEET D-1 |
| | AND SP-1 IS INCORRECT. PLEASE CORRECT. |
| | |
| | 5) SHEETS A-2.0 AND A-2.1 HAVE NOT BEEN |
| | SEALED BY THE ARCHITECT. |
| | |
| | 6) THE MINIMUM ATTIC ACCESS SIZE IS 24"X |
| | 36" PER 97SBC 2309.6. |
| | |
| | 7) SAFETY GLASS IS REQUIRED IN THE |
| | WINDOWS IN THE MASTER BATH AND BATHROOM |
| | #2. GLASS IS REQUIRED TO PASS THE TEST |
| | REQUIREMENTS OF CPSC 16-CFR, PART 1201. |
| | 97 SBC 2405.1 |
| | |
| | 8) PROVIDE MANUFACTURES' SPECIFICATIONS |
| | AND LISTING INFORMATION FOR THE PREFAB |
| | FIREPLACE AND FLUE PIPE. |
| | A SEPARATE PERMIT IS REQUIRED FOR GAS. |
| | |
| | 9) TRUSS ENGINEER SHALL BE PROVIDED WITH |
| | CHIMNEY CONSTRUCTION DETAILS AND |
| | MOUNTING INFORMATION FOR A/C EQUIPMENT |
| | THAT WILL BE SUSPENDED FROM TRUSSES, SO |
| | THAT ADDITIONAL LOADS CAN BE ADDRESSED. |
| | TRUSS ENGINEER'S WRITTEN APPROVAL FOR |
| | THESE ITEMS WILL BE REQUIRED BEFORE |
| | TRUSSES WILL BE APPROVED. |
| | |
| | 10) PROVIDE CAP AND BASE DETAILS FOR |
| | STEEL COLUMNS. |
| | |
| | 11) PLEASE CLARIFY IF THE ENTIRE ROOF |
| | SYSTEM IS BEING REPLACED OR NOT. PLEASE |
| | CLARIFY IF THE TWO CONNECTORS SPECIFIED |
| | ARE TO BE USED FOR ALL TRUSSES AND |
| | GIRDERS. PLEASE CHECK LATEST SIMPSON |
| | CATALOG FOR CORRECT NUMBER OF FASTENERS |
| | REQUIRED TO ACHIEVE THE LISTED ALLOWABLE |
| | LOADS. |
| | |
| | 12) THE DEN/LIBRARY ON A-1 WHICH COULD |
| | BE USED AS A SLEEPING ROOM IS REQUIRED |
| | TO HAVE AN EGRESS WINDOW COMPLYING WITH |
| | 97SBC 1005.4 OR IT CAN BE PERMANENTLY |
| | NOTED ON THE ORIGINAL DRAWINGS(NOT HAND |
| | WRITTEN) THAT THE ROOM SHALL NOT BE USED |
| | FOR SLEEPING PURPOSES. |
| | |
| | 13) THE ARCHITECT DID NOT SIGN THE |
| | DESIGN CERTIFICATION FORMS. THIS |
| | INFORMATION IS REQUIRED TO BE ON THE |
| | PLANS AND THE FORMS WILL NO LONGER BE |
| | ACCEPTED BY THE BUILDING DEPARTMENT. |
| | |
| | 14) PROVIDE DETAILS FOR THE CONSTRUCTION |
| | OF ARCHES AT WINDOW OPENINGS. |
| | |
| | 15) PROVIDE (2) CURRENT AND COMPLETE |
| | COPIES OF SBCCI OR METRO-DADE PRODUCT |
| | APPROVALS FOR: |
| | - STRUCTRAL MULLIONS FOR IMPACT RATED |
| | ASSEMBLIES |
| | - FRONT DOOR ASSEMBLY |
| | - METAL SIDE SWING DOOR AT GARAGE |
| | - 12' & 18' SLIDING GLASS DOORS (THE |
| | ONE SUBMITTED IS FOR DOORS WITH A 9' |
| | MAXIMUM WIDTH. |
| | |
| | IF YOU HAVE ANY QUESTIONS PLEASE CALL: |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |