Plan Review Details - Permit 01121770
Plan Review Stops For Permit 01121770
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2002-04-30 Cont ID  
Sent By jgomez Date 2002-04-30 Time 18:57 Rev Time 1.00
Received By jgomez Date 2002-04-30 Time 18:57 Sent To E
Notes
2002-04-30 00:00:00REVISION APPROVED WITH PROVISO:
 1-PROVIDE REVISED ENERGY CALCULATIONS.
 2-SUBMITT INFORMATION REQUESTED ON
 PROVISO DATED 4-2-02BEFORE
 INSTALLATION TO AVOID CONFLICTS OR
 DELAYS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2002-04-02 Cont ID  
Sent By jgomez Date 2002-04-02 Time 18:11 Rev Time 4.00
Received By jgomez Date 2002-04-02 Time 18:11 Sent To  
Notes
2002-04-02 00:00:00APPROVED WITH PROVISO:
 1-SITE SPECIFIC PRODUCT APPROVAL FOR
 ENTRY DOORS WITH SIDELITES. ENGINEER
 NEEDS TO CAREFULLY REVIEW CONSTRUCTION
 DRAWINGS TO REVISE THE FOLLOWING:
 A)SEE BUILDING CODE USED BY ARCHITECT TO
 DESIGN THE STRUCTURE.
 B)REVISE THE MEAN ROOF HEIGHT FOR BLDG.
 SEE EXTERIOR ELEVATIONS.
 C)STRUCTURE TO RECEIVE ENTRY DOORS
 ASEMBLY IS NOT CONCRETE COLUMNS, BUT
 FILLED CONCRETE BLOCK COLUMNS. SEE
 ARCHITECT'S PLANS.
 2-ARCHITECT TO PROVIDE CERTIFICATION
 STATING THAT HE REVIEW THE SITE
 SPECIFIC ENGINEERING FOR THE ENTRY
 ASSEMBLY AND WILL BE OK FOR HIS BLDG
 AND THAT HIS STRUCTURE WILL RESIST THE
 LOADS APPLIED BY THIS ASSEMBLY.
 3-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS UNDER A SEPARATE PERMIT.
 NOTES:
 A)SEE PLANS FOR AREAS TO RECEIVE PANELS.
 B)SEE TABLE 1 ON STORM SHUTTERS DWGS FOR
 MAX. PANEL SPAN AND OPENINGS TO BE
 INSTALLED ON. IT DOESN'T WORK.
 C)CHECK ANCHOR TYPE AND SPACING TO BE
 USED ACCORDING TO DESIGN PRESSURES,
 MEAN ROOF HEIGHT, CONNECTION TYPE AND
 STRUCTURE TO BE ATTACHED TO (CONCRETE
 BLOCK OR CONCRETE).
 4-SITE SPECIFIC ENGINEERING FOR BUTT
 GLAZING ASSEMBLIES:
 A)ENGINEER TO PROVIDE COMPLETE
 ENGINEERING CALCULATIONS FOR SITE
 SPECIFIC APPLICATIONS (THIS IS NOT AN
 APPROVED PRODUCT APPROVAL, THEREFORE
 COMPLETE SITE SPECIFIC ANALYSIS IS
 REQUIRED) USING THE BUILDING CODE FOR
 WHICH BUILDING WAS DESIGNED.
 B)PRODUCT APPROVAL SUBMITTED FOR SERIES
 4500 STOREFRONT SYSTEM IS TO BE USED
 WITH MULLIONS, NOT BUTT GLAZING. SEE
 PRODUCT APPROVAL DRAWINGS.
 C)ARCHITECT TO PROVIDE CERTIFICATION AS
 DONE FOR ENTRY DOORS ASSEMBLY.
  
 NOTE: REMEMBER THAT ALL DOCUMENTS THAT
 ARE SUBMITTED FOR PUBLIC RECORDS BY
 ARCHITECTS/ENGINEERS NEED TO BE SIGNED,
 SEALED & DATED AND PROFESSIONALS NEED TO
 PROVIDE ALL THEIR INFORMATION AS REQ'D
 BY CHAPTER 471/481 OF FLORIDA STATUTES.
  
 5-PROVIDE COMPLETE UL LISTING & SPECS
 FOR FIREPLACE AND BBQ PRIOR TO
 INSTALLATION (TWO COPIES OF EACH).
 6-ARCHITECT TO PROVIDE DETAIL/SPECS FOR
 2X STRUCTURAL BUCK DETAILS AS REQUIRED
 FOR SWING DOORS AND STOREFRONT SYSTEM.
 7-PROVIDE PRODUCT APPROVAL OR SITE
 SPECIFIC ENGINEERING FOR FRENCH DOOR
 WITH TRANSOM ABOVE SINGLE ASSEMBLY W/
 SIZES & STRUCTURE TYPE ATTACHED TO AS
 SHOWN ON EXTERIOR ELEVATIONS.
 **ARCHITECT TO PROVIDE CERTIFICATION AS
 REQUESTED ON PREVIOUS ITEMS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2002-03-04 Cont ID  
Sent By jgomez Date 2002-03-04 Time 18:22 Rev Time 3.00
Received By jgomez Date 2002-03-04 Time 18:22 Sent To  
Notes
2002-03-04 00:00:00SECOND CHECKLIST:
 1-NOTICE OF COMMENCEMENT WASN'T RECORDED
 2-IMPACT FEES WERE NOT PAID.
 3-SURVEY WAS RE-SUBMITTED WITHOUT THE
 ORIGINAL SIGNATURE AS REQUIRED BY
 CHAPTER 471 FLORIDA STATUTES.
 4-AT LEAST ONE BATHROOM, NOT POWDER RM,
 SHALL HAVE DOOR THAT PROVIDES 29" MIN.
 CLEAR OPENING. SEC 11 OF FLORIDA
 ACCESSIBILITY CODE.
 5-PROVIDE INSTALLATION DETAILS AND SPECS
 FOR ROPE COLUMNS AT FRONT ELEVATION.
 THIS IS PART OF THE DESIGN.
 SEC. 104.2.2 CITY AMENDMENTS TO SBC/97
 AND SECTION 1606.1 SBC 1997.
 6-PROVIDE COMPLETE INFORMATION FOR STORM
 PANELS. PRODUCT APPROVAL, KEY PLAN &
 COMPLETE INSTALLATION SCHEDULE
 OR APPLY FOR SEPARATE PERMIT.
 7-PROVIDE PRODUCT APPROVAL FOR:
 A)ENTRY DOORS. SEE SIZE ON PLANS.
 B)FIREPLACE WITH UL LISTING.
 C)BBQ WITH DEEP FRYER LISTING.
 D)EXTERIOR SWING DOORS INCLUDING GARAGE.
 E)FRENCH DOORS WITH & WITHOUT SIDELITES.
 F)FRENCH DOOR WITH TRANSOM ABOVE AS
 SHOWN ON EXTERIOR ELEVATIONS.
 NOTE:
 COMMENTS ON PRODUCT APPROVAL PACKAGE
 SUBMITTED THE FIRST TIME WERE IGNORED.
 PACKAGE RESUBMITTED IS THE SAME ONE WITH
 THE EXCEPTION OF HAVING THE ARCHITECT'S
 REVIEW STAMP ON THEM. READ THE COMMENTS.
  
 G)IMPACT FIXED WINDOWS. SEE ELEVATIONS.
 H)IMPACT CASEMENT WINDOWS.
 8-DETAIL 5 OF A9 DOESN'T WORK. CONNECTOR
 SPECIFIED CAN'T BE USED. SEE TRUSS
 PROFILE AND ANCHOR SPECIFIED.
 REVISED AS REQUIRED.
 9-OWES $45.90 FOR UPDATED VALUE TO
 REFLECT REVISION ON SQUARE FOOTAGES.
 10-CHIMNEY SECTION/DETAIL: SPECIFY HOW
 ARE ROOF TRUSSES FASTENED.
 SEC. 104.2.2 CITY AMENDMENTS TO SBC
 AND SECTION 1606 SBC 1997.
 11-CLARIFY IF GLASS BLOCK IS GOING TO
 HAVE STORM PANELS OR NOT.
 12-SEE COMMENTS ON PLANS AND RESUBMIT
 REVIEW SET.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2002-02-01 Cont ID  
Sent By btrobaug Date 2002-01-17 Time 13:49 Rev Time 4.50
Received By jgomez Date 2002-02-01 Time 19:04 Sent To  
Notes
2002-02-01 00:00:00CHECKLIST:
 1-NEED NOTICE OF COMMENCEMENT.
 2-PAY IMPACT FEES.
 3-REVISE GENERAL NOTES ON COVER SHEET.
 THEY REFER TO SFBC NOT SBC 1997. SEE
 COMMENTS ON SHEET C-1.
 4-REVISE AREA CALCULATIONS.
 5-SURVEY TO HAVE ORIGINAL SIGNATURE AS
 REQUIRED BY CHAPTER 471 FL. STATUTES.
 6-PROVIDE EGRESS AT "LIBRARY". ROOM CAN
 BE USED FOR SLEEPING ALSO. SECTION
 1005.4 SBC 1997.
 7-SPECIFY ON PLANS SAFETY GLASS AS REQ'D
 BY SEC. 2405.2 SBC 1997. SEE PLANS.
 -SAFETY GLASS SHALL PASS THE TEST
 REQUIREMENTS OF CPSC 16-CFR,PART 1201.
 SEE SEC. 2405.1 SBC 1997.
 8-AT LEAST ONE BATHROOM SHALL HAVE DOOR
 THAT PROVIDES 29" MIN. CLEAR OPENING
 AS REQ'D BY SECTION 11 OF FLORIDA
 ACCESSIBILITY CODE, 1997.
 9-PROVIDE COMPLETE SPECIFICATIONS FOR
 CEILING INSTALLATION AT REAR AND FRONT
 PORCHES. SEE ASTM C926 AND ASTM C1063
 FOR PROPER SPECS. SEC. 2504.2 SBC 1997
 10-REVISE SIZE OF ATTIC ACCESS ON DETAIL
 2 OF A8. SEC. 2309.6 SBC 1997.
 11-PROVIDE INSTALLATION DETAILS AND
 SPECS FOR ROPE COLUMNS AT FRONT ELEV.
 SECTION 104.2.2 CITY AMENDMENTS TO SBC
 12-REVISE SIZE OF FASTENER FOR STRUCT'L
 BUCK DETAIL FOR SWING DOORS. 1 1/2"
 NAILS DON'T WORK FOR A 2X4 BUCK.
 13-PROVIDE COMPLETE CHIMNEY DETAIL THAT
 MATCHES CHIMNEY SHOWN ON PLANS.
 SEC. 104.2.2 CITY AMENDMENTS TO SBC.
 14-CLARIFY IF STORM PANELS OR IMPACT
 GLAZING IS GOING TO BE USED. SEE NOTE
 ON DWG A-2.
 -NEED STORM SHUTTERS PRODUCT APPROVAL
 AND INDICATE ON APPROVED DRAWINGS THE
 SPECIFIC MOUNTING CONDITIONS & ANCHOR
 TO BE USED ACCORDING TO THE MEAN ROOF
 HEIGHT, DESIGN PRESSURES, PANEL SPAN,
 EDGE DISTANCE AND STRUCTURE TO BE
 ATTACHED TO (WOOD OR CONCRETE BLOCK)
 15-SPECIFY DESIGN PRESSURES CALCULATED
 AT SMALL GARAGE DOORS.
 SEC. 1606 SBC 1997.
 16-CLARIFY WINDOW TYPE FOR BREAKFAST AND
 LIVING AREAS. ARCHITECTURAL PLANS CALL
 FOR FIXED WINDOWS WITH STRUCTURAL
 MULLIONS. PRODUCT APPROVAL INFORMATION
 SUBMITTED IS FOR BUTT GLAZING.
 REVISE PLANS AS REQUIRED.
 A)NOTE: IF USING BUTT GLAZING, THEN
 PROVIDE PRODUCT APPROVAL OR COMPLETE
 SITE SPECIFIC INFORMATION AND FILL
 ATTACHED FORM WHICH NEEDS TO BE SIGNED
 SEALED AND DATED BY THE MANUFACTURER'S
 ENGINEER & BY ARCHITECT OF RECORD.
 B)STOREFRONT PRODUCT APPROVAL DOESN'T
 HAVE LEGIBLE DRAWINGS AND CLEARLY
 INDICATE THE COMPONENTS TO BE USED.
 17-PROVIDE PRODUCT APPROVAL FOR:
 A)ENTRY DOORS. SEE SIZE ON PLANS.
 B)FIREPLACE WITH UL LISTING.
 C)BBQ WITH DEEP FRYER UL LISTING.
 D)EXTERIOR SWING DOORS INCLUDING GARAGE.
 E)FRENCH DOORS WITH & WITHOUT SIDELITES.
 F)FRENCH DOOR WITH TRAMSOM ABOVE AS
 SHOWN ON EXTERIOR ELEVATIONS.
 18-SEE PLANS FOR ADDITIONAL COMMENTS,
 INCLUDING TOSED BY THE OTHER TRADES &
 RETURN REVIEWED SET AFTER ORIGINAL
 DRAWINGS ARE CORRECTED IN ORDER TO
 EXPEDITE THE REVIEW PROCESS.

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2003-08-08 Cont ID  
Sent By btrobaug Date 2003-08-08 Time 15:15 Rev Time 0.50
Received By btrobaug Date 2003-08-08 Time 14:45 Sent To  
Notes
2003-08-08 00:00:00UNSAT
 ~~~~~
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
 PLEASE REVISE TO SHOW CODE COMPLIANCE
 FOR THE FOLLOWING.
  
 1} THE GEC FOR A 400 AMP SERVICE IS 1/0
 PER 210.66
  
 2} THE 225 OCP FOR PANELS "A" & "B" IS
 INCORRECT FOR 2/0 CONDUCTORS,THESE
 FEEDERS SHOULD BE 3/0 FOR 225 AMPS PER
 310.15(B)(6).
  
 SHOW CORRECT PANEL "C" & "D" FEEDS,
 RISER AND PANEL SCHEDULE DO NOT
 CORRELATE.
  
 IF THERE ARE ANY QUESTIONS PLEASE CALL.
  
 BILL TROBAUGH
 ELECTRICAL PLAN REVIEW
 561/805-6718

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-05-01 Cont ID  
Sent By alange Date 2003-08-05 Time 14:52 Rev Time 0.00
Received By btrobaug Date 2002-05-01 Time 12:06 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-01-17 Cont ID  
Sent By jgomez Date 2002-05-01 Time 11:21 Rev Time 1.00
Received By btrobaug Date 2002-01-17 Time 12:44 Sent To B
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2002-01-31 Cont ID  
Sent By lmartine Date 2002-01-31 Time 07:48 Rev Time 1.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status N Date 2002-01-31 Cont ID  
Sent By lmartine Date 2002-01-31 Time 07:49 Rev Time 1.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-08-05 Cont ID  
Sent By alange Date 2003-08-05 Time 14:52 Rev Time 0.00
Received By alange Date 2003-08-05 Time 14:52 Sent To E
Notes
2003-08-05 00:00:00TO BT DESK

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-06-05 Cont ID  
Sent By pkrauss Date 2002-06-05 Time 07:57 Rev Time 0.35
Received By pkrauss Date 2002-06-05 Time 07:47 Sent To  
Notes
2002-06-05 00:00:00MECHANICAL PERMIT 02051917
 REVISION - MOVED AHU #3

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-01-10 Cont ID  
Sent By hmoser Date 2002-01-10 Time 20:07 Rev Time 0.50
Received By hmoser Date 2002-01-10 Time 20:07 Sent To  
Notes
2002-01-10 00:00:00NO MECHANICAL PERMIT NUMBER WITH THIS
 APPLICATION 1/10/02H.M.

Review Stop P PLUMBING
Rev No 4 Status P Date 2002-07-13 Cont ID  
Sent By jleech Date 2002-07-13 Time 11:22 Rev Time 0.33
Received By jleech Date 2002-07-13 Time 11:22 Sent To  
Notes
2002-07-13 00:00:00REVISION SAN. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 3 Status F Date 2002-06-08 Cont ID  
Sent By kstevens Date 2002-06-08 Time 11:06 Rev Time 0.00
Received By kstevens Date 2002-06-08 Time 11:06 Sent To  
Notes
2002-06-08 00:00:00DENIED
 REFERENCE: SPC-94
  
 1) SANITARY RISER DIAGRAM DOES NOT RE-
 FLECT FLOOR PLAN. BATHROOM #3 NOT ON
 RISER DIAGRAM.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-04-04 Cont ID  
Sent By btrobaug Date 2002-05-01 Time 12:47 Rev Time 0.25
Received By jleech Date 2002-04-04 Time 15:39 Sent To  
Notes
2002-04-04 00:00:00RESTAMP NO CHANGE TO PLUMBING.

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-01-05 Cont ID  
Sent By jleech Date 2002-01-05 Time 10:29 Rev Time 0.50
Received By jleech Date 2002-01-05 Time 10:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2002-01-02 Cont ID  
Sent By sgraham Date 2002-01-02 Time 11:43 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved