| 2002-01-29 00:00:00 | CHECKLIST: |
| | 1-NEED RECORDED NOTICE OF COMMENCEMENT. |
| | 2-PAY IMPACT FEES AND BRING PAID RECEIPT |
| | 3-CLARIFY LOCATION OF SHEARWALL SEGMENTS |
| | AND DIMENSIONS. SEE ELEVATIONS AND |
| | 2ND. FLOOR FRAMING PLAN. |
| | -CLARIFY FASTENING AT ENDS OF SHEARWALL |
| | -CLARIFY WHY THERE ARE NOT SHEARWALLS |
| | AT FRONT ELEVATION? |
| | -HOW ARE CORNERS AT 2ND FL. REINFORCED? |
| | 4-FIRST FLOOR BATH TO HAVE DOOR THAT |
| | PROVIDES 29" MIN. CLEAR OPENING. SEC. |
| | 11 OF FLORIDA ACCESSIBILITY CODE, 1997 |
| | 5-PROVIDE ATTIC ACCESS AT LANAI ROOF. |
| | SEC. 2309.6 SBC 1997. |
| | 6-SHOW RAILINGS AT STAIRS. SEC. 1007.5 |
| | -SPECIFY FASTENERS FOR GUARDRAILS AND |
| | HANDRAILS THAT SATISFY THE DESIGN |
| | REQUIREMENTS OF SEC. 1608.2 SBC 1997. |
| | 7-SPECIFY BEAM ABOVE BREAKFAST AREA AND |
| | END CONNECTORS. SEC. 104.2.2 CITY |
| | AMENDMENTS AND SEC. 1606 SBC 1997. |
| | 8-COMPLETE STEEL COLUMN DETAIL. SPECIFY |
| | TOP AND BOTTOM ATTACHMENTS. SECTION |
| | 104.2.2 CITY AMENDMENTS TO SBC 1997 & |
| | SEC. 1606 SBC 1997. |
| | 9-PROVIDE STRUCTURAL BUCK DETAIL FOR |
| | EXTERIOR SWING DOORS. SEC. 104.2.2 |
| | CITY AMENDMENTS TO SBC 1997. |
| | 10-SOIL TEST REPORT TO HAVE ENGINEER'S |
| | ORIGINAL SIGNATURE (NOT RUBBER STAMP) |
| | AS REQUIRED BY CHAPTER 471 FL STATUTES |
| | 11-LEFT SIDE EXTERIOR ELEVATION DOESN'T |
| | MATCH FLOOR PLANS. SEE WINDOWS AND |
| | DOORS NOT SHOWN. |
| | -CLARIFY PITCH OF ROOF. SEE ELEVATIONS. |
| | 12-PROVIDE PRODUCT APPROVAL FOR: |
| | A)ENTRY DOORS. |
| | B)HORIZONTAL ROLLING WINDOWS (DRAWINGS |
| | ARE NOT LEGIBLE). |
| | C)SINGLE HUNG WINDOWS. |
| | D)SLIDING GLASS DOORS(DWGS NOT LEGIBLE). |
| | E)ARCHED WINDOWS. SEE SIZES ON PLANS. |
| | F)WINDOW MULLIONS. |
| | G)AWNING WINDOWS. |
| | H)ROOF TILE. |
| | |
| | 13-SPECIFY THE DESIGN PRESSURES THAT |
| | WERE CALCULATED AT EACH EXT. OPENING. |
| | SEC. 1606 SBC 1997. |
| | 14-REVISE THE OWNER INFORMATION IN THE |
| | ENERGY CALCULATIONS AND COMPLETE ALL |
| | INFORMATION ON TOP OF FORM. |
| | 15-SPECIFY FASTENINGS FOR RAILINGS AND |
| | GUARDRAILS TO COMPLY WITH SECTION |
| | 1608.2 SBC 1997. |
| | -SHOW RAILINGS ON PLANS. SECTION |
| | 1007.5 SBC 1997. |
| | 16-SPECIFY CEILING INSTALLATION AT ENTRY |
| | AND REAR PORCHES. SEE ASTM C926 AND |
| | ASTM C1063 FOR PROPER SPECIFICATIONS. |
| | SEC. 2504.2SBC 1997. |
| | 17-SEE COMMENTS ON PLANS, INCLUDING |
| | COMMENTS BY THE OTHER TRADES. |
| | -PLEASE BRING BACK REVIEWED SET AFTER |
| | CORRECTIONS ARE DONE TO THE ORIGINAL |
| | DRAWINGS IN ORDER TO EXPEDITE THE |
| | REVIEW PROCESS. |
| | 18-STORM PANELS: |
| | A)PROVIDE COMPLETE INSTALLATION SCHEDULE |
| | AS PER CITY SAMPLE ATTACHED. |
| | B)PROVIDE KEY PLAN THAT MATCHES ACTUAL |
| | ARCHITECTURAL PLANS. |
| | C)STORM SHUTTERS PRODUCT APPROVAL IS |
| | GOOD FOR ONE PERMIT ONLY. SEE NOTE ON |
| | STORM SHUTTERS APPROVED DRAWINGS. |
| | D)CLEARLY INDICATE ON STORM SHUTTER DWGS |
| | THE SPECIFIC MOUNTING CONDITIONS AND |
| | ANCHOR TYPE AND SPACING TO BE USED |
| | ACCORDING TO THE MEAN ROOF HEIGHT, |
| | DESIGN PRESSURES, PANEL SPAN, EDGE |
| | DISTANCE AND STRUCTURE TO BE ATTACHED |
| | TO (WOOD OR CONCRETE BLOCK). |