Plan Review Details - Permit 01111177
Plan Review Stops For Permit 01111177
Review Stop P PLUMBING
Rev No 3 Status P Date 2002-11-12 Cont ID  
Sent By kstevens Date 2002-11-12 Time 16:41 Rev Time 1.00
Received By kstevens Date 2002-11-12 Time 16:41 Sent To  
Notes
2002-11-12 00:00:00REVISION OK - RISER DIAG - ADD 5K (2 GAS
 LIGHTS 2.5K EA) - CHANGE TO U/G AT
 GAS LIGHTS/FIREPLACE

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-03-26 Cont ID  
Sent By kstevens Date 2002-03-26 Time 13:37 Rev Time 0.00
Received By kstevens Date 2002-03-26 Time 13:37 Sent To  
Notes
2002-03-26 00:00:00PASSED/PROVISO
  
 CHECK FOR AGA LISTING SEAL ON DRYER DOOR
 (INSIDE)

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-03-07 Cont ID  
Sent By kstevens Date 2002-03-07 Time 13:46 Rev Time 1.50
Received By kstevens Date 2002-03-07 Time 13:46 Sent To  
Notes
2002-03-07 00:00:00DENIED
 REFERENCE: SGC-97
  
 1) ORIGINAL PERMIT APPLICATION NOT SUB-
 MITTED WITH PLANS. PLEASE RETURN APPLI-
 CATION WITH PLANS.
 2) FLAT LAYOUT NOT CLEAR AND READABLE
 PLEASE SUBMIT NEW LAYOUT SHEET. SGC SEC
 104.2.1
 3) PLEASE SUBMIT CALCULATIONS FOR TACT
 ROOM FOR DRYER.
 4) PLEASE SUBMIT AN ISOMETRIC DRAWING
 FOR ENTIRE SYSTEM. SHOW ALL CUT SECTIONS
 OF PIPE AND CORRESPONDING LENGTHS PER
 STANDARD GAS CODE.
 5) SUBMIT MANUFACTURE'S CHART FOR CSST
 PIPE. IDENTIFY MFG.
 6) TYPE OF GAS? NATURAL OR LP?
 7) SUBMIT APPROVAL LISTING FOR THE FOL-
 LOWING APPLIANCES, - RANGE AND DRYER.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved