Plan Review Details - Permit 01101647
Plan Review Stops For Permit 01101647
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-05-19 Cont ID  
Sent By jwitmer Date 2003-05-19 Time 13:34 Rev Time 0.50
Received By jwitmer Date 2003-05-19 Time 13:24 Sent To M
Notes
2003-05-19 00:00:00BUILDING PROVISO:
 PLANS, SPECIFICATIONS,REPORTS OR
 OTHER DOCUMENTS PREPARED BY THE DESIGN
 PROFESSIONAL AND BEING FILED FOR PUBLIC
 RECORD SHALL HAVE THE SIGNATURE AND
 SEAL OF THE DESIGN PROFESSIONAL AFFIXED
 TO THE DOCUMENT.
 FL STATE STAT: 61G15-23.002 ENGINEERS
 FL ATATE STAT: 61G16.003 ARCHITECTS

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2002-02-04 Cont ID  
Sent By jwitmer Date 2002-02-04 Time 14:45 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
2002-02-04 00:00:00BUILDING PLAN REVIEW
 PERMIT # 01101647
 5881 45TH STREET
  
 1)- THE PLAN FOR "DUMPING" OF THE
 ANHYDROUS AMMONIA INTO THE 25,000 GAL
 UNDERGROUND TANK WILL REQUIRE ADDITIONAL
 INFORMATION.
 2) WE WILL NEED TO KNOW THE VOLUME OF
 AMMONIA THAT WILL BE IN THE SEALED
 SYSTEM. THE CALCULATIONS INDICATING HOW
 MUCH WATER SHALL BE REQUIRED TO NEUTRAL-
 IZE THE AMMONIA.
 3) MSDS SHEETS FOR THE R-717 OR
 ANHYDROUS AMMONIA.
 4) THE PROCEDURE INVOLVED IF A ACCIDENT
 DOES OCCUR??
 5) SAFETY DEVISES SENSORS?
 6) SARA SECTION 302/304 EMERGENCY PLAN-
 NING AND NOTIFICATION,
 REPORTABLE QUANTITY 100 LBS
 THRESHOLD PLANNING500 LBS.
  
 THIS REVIEW IS NOT TO BE CONSIDERED
 A THROUGH REVIEW UNTIL THE ABOVE COM-
 MENTS HAVE BEEN ADDRESSED, MORE COMMENTS
 MAY BE FORTH COMING WITH THE NEW INFORMA
 TION. THIS APPLICATION FOR PERMIT MAY BE
 ONLY FOR THE TANK BUT THE CONCERNS ARE
 THAT IF IN CASE OF A LEAK WE DO HAVE THE
 PROPER SAFETY PROCEDURES IN AFFECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2001-11-28 Cont ID  
Sent By jwitmer Date 2001-11-28 Time 12:18 Rev Time 1.00
Received By jwitmer Date   Time   Sent To  
Notes
2001-11-28 00:00:00THE QUESTIONS ASKED BY THE FIRE DEPART-
 MENT WOULD BE THE SAME, ADDTIONAL INFORM
 ATION WILL BE REQUIRED BEFORE A
 THOROUGH PLAN REVIW COULD BE ACCOMPLISH-
 ED.
 JIM WITMER

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2001-11-20 Cont ID  
Sent By pkrauss Date 2001-11-20 Time 09:46 Rev Time 0.05
Received By pkrauss Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2002-02-26 Cont ID  
Sent By lsmith Date 2002-02-26 Time 10:17 Rev Time 0.00
Received By lsmith Date   Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2003-03-19 Cont ID  
Sent By mcarsill Date 2003-03-19 Time 10:24 Rev Time 0.00
Received By mcarsill Date 2003-03-19 Time 10:23 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2002-01-03 Cont ID  
Sent By mcarsill Date 2002-01-03 Time 14:23 Rev Time 0.00
Received By jwitmer Date 2002-01-03 Time 14:23 Sent To  
Notes
2002-01-03 00:00:001) PLEASE PROVIDE MATERIAL SAFETY DATA
 SHEETS FOR THE AMMONIA WHEN IT IS WITHIN
 THE CLOSED SYSTEM. ALSO PLEASE PROVIDE
 MATERIAL SAFETY DATA SHEETS FOR THE
 AMMONIA HYDROXIDE PRODUCT THAT IS
 COLLECTED IN THE UNDERGROUND STORAGE
 TANK. THIS OFFICE NEEDS TO DETERMINE
 THE FLAMMABILITY, TOXICITY, AND
 QUANTITIES OF THE AMMONIA.
 2) PLEASE PROVIDE APPROPRIATE WARNING
 SIGNS INDICATING HAZARDS AND WORKING
 PRESSURES.
 3) ONLY IRON OR STEEL PIPE ARE TO BE
 CONNECTED TOP AMMONIA SYSTEMS.
  
 MIKE CARSILLO, CAPTAIN
 659-8096,EXT.8497
 835-2910

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2001-11-15 Cont ID  
Sent By mcarsill Date 2001-11-15 Time 12:20 Rev Time 0.00
Received By mcarsill Date 2001-11-15 Time 12:20 Sent To  
Notes
2001-11-15 00:00:001) PLEASE EXPLAIN PROCESS THAT THE
 AMMONIA TANK IS USED FOR. WHAT TYPE
 OF AMMONIA IS USED OR BEING PRODUCED.
 ANY WASTE GENERATED FROM THIS PROCESS.
 2) PLEASE PROVIDE MATERIAL SAFETY
 DATA SHEETS FOR THE AMMONIA.
 3) CUT SHEETS REQUIRED FOR ALL
 SAFETY EQUIPMENT.
 4) PLEASE EXPLAIN ALL INTERNAL WORKING
 PRESSURES FOR THE SYSTEM.
 5) PLEASE INDICATE MINIMUM SEPARATION
 DISTANCES FROM VENT PIPE TO ANY AIR
 INTAKE DEVICES.
 6) WHAT OPERATIONAL STEPS WILL BE TAKEN
 IN THE EVENT OF AN INDUSTRIAL
 ACCIDENT INVOLVING THE AMMONIA.
 7) IS THE SYSTEM THAT THE AMMONIA IS
 BEING USED IN OPEN OR CLOSED.
  
 MIKE CARSILLO, CAPTAIN
 659-8096,EXT.8497
 835-2910

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-03-18 Cont ID  
Sent By jwitmer Date 2003-05-19 Time 13:39 Rev Time 0.10
Received By pkrauss Date 2003-03-18 Time 14:39 Sent To  
Notes
2003-03-18 00:00:00SUBMITTAL LETTER ON WATER TO AMMONIA
 RATIO.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2002-01-04 Cont ID  
Sent By pkrauss Date 2002-01-04 Time 09:27 Rev Time 4.00
Received By pkrauss Date 2002-01-04 Time 09:27 Sent To  
Notes
2002-01-04 00:00:00 
 THIS REVIEW WAS DONE WITH CAPT MIKE
 CARSILLO, NANCY DEMARK, JIM WHITMERE &
 PATTY KRAUSS
  
 VENT LINE TO TANK - SHALL COMPLY WITH
 1997 SMC 1105.7.2.
  
 PLEASE PROVIDE MSDS SHEETS ON THE
 AMMONIA TYPE SPECIFIC TO THIS
 APPLICATION.
  
 PROVIDE MANUFACTURER SUBMITTAL DATA FOR
 THE DOUBLE WALL FIBERGLASS TANK.AS PER
 ASHRAE 15-1992 10.4.8.2, TANK SHALL BE
 SUBSTANTIALLY CONSTRUCTED OF NOT LESS
 THAN 1/8 IN OR NO. 11 U.S. GAGE IRON OR
 STEEL.
  
 INDICATE WHO MAKES THE DETERMINATION
 WHEN THE SYSTEM IS TO BE DUMPED INTO
 THE TANK.WILL THIS BE A MANUAL OR
 MONITORED SYSTEM.
  
 PROVIDE PLAN FOR ACTION IF LEAK OCCURS
 WHEN BUILDING IS NOT OCCUPIED TO PROVIDE
 NOTIFICATION.AS PER ASHRAE 15-1999
 B10,THE RELEASE OF AMMONIA INTO THE
 ATMOSHERE IN THE EVENT OF AN EMERGENCY,
 MAY BE SUBJECT TO THE REPORTING REQUIREM
 ENTS OF THE 'EMERGENCY PLANNING & COMMUN
 ITY RIGHT-TO-KNOW ACT OF 1986.IN LOCAT
 IONS WHERE ATMOSHPERIC RELEASE MAY BE
 HAZARDOUS DUE TO THE PROXIMITY OF PEOPLE
 OR OTHER PREMISES.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2001-11-20 Cont ID  
Sent By pkrauss Date 2001-11-20 Time 09:36 Rev Time 0.50
Received By pkrauss Date 2001-11-20 Time 09:36 Sent To  
Notes
2001-11-20 00:00:00 
 SEE FIRE DEPARTMENT COMMENTS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop P PLUMBING
Rev No 1 Status N Date 2002-02-26 Cont ID  
Sent By lsmith Date 2002-02-26 Time 10:17 Rev Time 0.00
Received By lsmith Date   Time   Sent To  
Notes
***NONE***