Plan Review Details - Permit 01101022
Plan Review Stops For Permit 01101022
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2001-11-20 Cont ID  
Sent By dpalmer Date 2001-11-20 Time 21:03 Rev Time 0.00
Received By dpalmer Date 2001-11-20 Time 21:03 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2001-11-27 Cont ID  
Sent By hmoser Date 2001-11-27 Time 18:53 Rev Time 0.50
Received By hmoser Date 2001-11-27 Time 18:53 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-11-07 Cont ID  
Sent By pschmitz Date 2002-11-07 Time 08:37 Rev Time 0.66
Received By pschmitz Date   Time   Sent To  
Notes
2002-11-07 00:00:00REVISION APPROVED,PES.

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-11-14 Cont ID  
Sent By kstevens Date 2001-11-14 Time 17:32 Rev Time 0.33
Received By kstevens Date 2001-11-14 Time 17:32 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status N Date 2001-12-08 Cont ID  
Sent By rmcdouga Date 2001-12-08 Time 08:02 Rev Time 1.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-12-08 00:00:00TRUSSES
 DENIED
  
 1) THE TRUSS LAYOUT REQUIRES THE WET
 SIGNATURE, EMBOSSED SEAL AND DATE OF THE
 TRUSS ENGINEER,AS WELL AS, HIS TITLE
 BLOCK. THE TRUSS LAYOUT AND DRAWINGS
 MUST BE REVIEWED BY THE DESIGNER OF
 RECORD OF THE STRUCTURE AND HIS APPROVAL
 MUST BE ACKNOWLEGED BY HIS SIGNATURE ON
 THE LAYOUT.
  
 2) INDICATE THE CONNECTORS TO BE USED
 ON TRUSS K2 AT COVERED LANAI (UPLIFT
 1528# & 1483#) WHICH IS NOT INDICATED ON
 SHEET A5 (ROOF PLAN).
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2001-12-08 Cont ID  
Sent By rmcdouga Date 2001-12-08 Time 07:20 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-12-08 00:00:00************BUILDING PROVISO************
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - FIXED GLASS WINDOWS
 - SLIDING GLASS DOORS
 - FRENCH DOORS
 - STRUCTURAL MULLIONS
 MUST BE SUBMITTED FOR APPROVAL PRIOR TO
 INSTALLATION AND MUST MEET OR EXCEED
 WINDLOAD REQUIREMENTS OF ASSEMBLY IN
 WHICH THEY ARE TO BE INSTALLED.
  
 3) SUBMIT CURRENT PRODUCT APPROVALS FOR
 SINGLE HUNG WINDOWS, GLASS BLOCK AND
 ROOF TILES FOR REVIEW PRIOR TO
 INSTALLATION. THE ONES THAT WERE
 SUBMITTED HAD EXPIRED PRIOR TO 10/15/01,
 WHICH IS THE DATE APPLICATION FOR PERMIT
 WAS SUBMITTED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 2 Status P Date 2001-11-14 Cont ID  
Sent By sgraham Date 2001-11-14 Time 15:29 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2001-10-30 Cont ID  
Sent By sgraham Date 2001-10-24 Time 10:12 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
2001-10-30 00:00:00SETBACKS INCORRECT