Plan Review Details - Permit 01100098
| Plan Review Stops For Permit 01100098 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2001-10-03 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-10-03 |
Time |
08:24 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-10-03 |
Time |
08:24 |
Sent To |
|
|
| Notes |
| 2001-10-03 00:00:00 | TWO AIR PACKS WILL BE REQUIRED SINCE | | | THE ROOM IS CONSIDERED HAZARDOUS. SINGLE | | | WORK GROUPS NOT PERMITTED, TWO PERSONS | | | MUST WORK IN HAZARDOUS AREAS NOT ONE. | | | AIR PACKS PROVIDED MUST MEET ALL | | | REQUIRED STANDARDS FOR HAZARDOUS AREAS. | | | | | | MIKE CARSILLO, CAPTAIN | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2001-10-03 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-10-03 |
Time |
07:41 |
Rev Time |
0.40 |
| Received By |
pkrauss |
Date |
2001-10-03 |
Time |
07:35 |
Sent To |
|
|
| Notes |
| 2001-10-03 00:00:00 | ******************PROVISO*************** | | | | | | | | | PRIOR TO FINAL INSPECTION BUILDING | | | DEPARTMENT REQUIRES A SIGNED, SEALED | | | AND DATED LETTER FROM STRUCTURAL | | | ENGINEER CERTIFYING STABLITY OF | | | STRUCTURAL SUPPORT FOR COOLING TOWER. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2001-10-01 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-10-01 |
Time |
16:12 |
Rev Time |
1.00 |
| Received By |
pkrauss |
Date |
2001-10-01 |
Time |
15:32 |
Sent To |
|
|
| Notes |
| 2001-10-01 00:00:00 | *******************DENIED*************** | | | | | | PLEASE PROVIDE A PLAN OF MECHANICAL | | | ROOM.SHOW COMPLIANCE WITH 1997 SMC | | | CHAPTER 11.PLAN SHALL INDICATE THE | | | FOLLOWING.PLANS SHALL BE SIGNED, DATED | | | AND SEALED BY ENGINEER. | | | | | | 1.LOCATION OF MECHINERY ROOM IN | | | RELATION TO THE BUILDING. | | | | | | 2.VENTILATION REQUIREMENTS FOR NORMAL | | | AS WELL AS AN EMERGENCY CONDITIONS. | | | SHOW CALCULATIONS FOR BOTH | | | SITUATIONS. (1997 SMC 1105.7.4 & | | | 1105.7.5) | | | | | | 3.INDICATE MAKE-UP AIR. | | | | | | 4.INDICATE LOCATION OF LEAK DETECTOR. | | | | | | 5.SHOW TERMINATION OF RELIEF DEVICES. | | | (NOTE, NOT LESS THAN 15' ABOVE THE | | | ADJOINING GROUND LEVEL AND NOT LESS | | | THAN 20' FROM ANY WINDOW, EXIT TO | | | ANY BUILDING, VENTILATION OPENING) | | | | | | 6.INDICATE LOCATION OF BREATHING | | | APPARATUS. | | | | | | 7.SUBMIT ENGINEERED PLANS FOR | | | STRUCTURAL STEEL REPLACEMENT FOR | | | COOLING TOWER.LOAD CALCULATIONS. | | | | | | 8.INDICATE HOW SENSORS AND VENTILATION | | | WILL BE TIED INTO EMERGENCY POWER. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 EXT. | | | 8388. |
|
|
|