Plan Review Details - Permit 01070544
Plan Review Stops For Permit 01070544
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2002-01-15 Cont ID  
Sent By lmartine Date 2002-01-15 Time 17:43 Rev Time 1.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2001-12-04 Cont ID  
Sent By lmartine Date 2001-12-04 Time 15:53 Rev Time 2.00
Received By lmartine Date   Time   Sent To  
Notes
2001-12-04 00:00:00 
 LETTER WAS SUBMITTED BY OWNER ASKING
 FOR INTERPRETATION ON CITY CODE
 12-22.B.1 FLOOD PREVENTION REQUIREMENTS.
 AFTER REVIEW MR. STAPLES AND I
 DETERMINED THAT BY DEFINITION OF NEW
 CONSTRUCTION AND NOT SUBSTANTIAL
 IMPROVEMENTS,THE FINISH FLOOR AT THE
 NEW GARAGE SHALL BE AT 7.5' MINIMUM,
 PER CITY AND FEMA REGULATIONS.
  
  
 L. MARTINEZ
 659-8096
 #8456

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2001-09-14 Cont ID  
Sent By lmartine Date 2001-09-14 Time 14:25 Rev Time 1.00
Received By lmartine Date   Time   Sent To  
Notes
2001-09-14 00:00:00 
 BUILDING COMMENTS
 -----------------
  
 PROPERTY IS LOCATED IN FLOOD ZONE-A5-,
 REQUIRING THE MINIMUM FLOOR ELEVATION TO
 BE 7.5, PLANS AS SUBMITTED ARE NOT IN
 COMPLIANCE.
  
 REVIEWED BY:
 LUIS MARTINEZ
 659-8096
 #8456

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2001-07-30 Cont ID  
Sent By dpalmer Date 2001-07-30 Time 10:14 Rev Time 0.00
Received By dpalmer Date 2001-07-30 Time 10:14 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2001-07-20 Cont ID  
Sent By lsmith Date 2001-07-20 Time 14:53 Rev Time 0.00
Received By lsmith Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2001-07-25 Cont ID  
Sent By lsmith Date 2001-07-25 Time 09:38 Rev Time 0.00
Received By lsmith Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2001-08-09 Cont ID  
Sent By lsmith Date 2001-08-09 Time 08:46 Rev Time 1.50
Received By lsmith Date   Time   Sent To  
Notes
2001-08-09 00:00:00************BUILDING PROVISO************
  
 SBC 104.2.2
  
 1. PROVIDE SOIL TEST PER SEC. 1804.2.2
 OF CITY AMENDMENTS TO 1997 SBC.
  
 2BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED, IMPACT FEES MUST BE PAID TO
 PALMBEACH CO.,THE PERMIT PLANS STAMPED
 BY
 THEM AND THE RECEIPT ATTACHED TO THE
 PERMIT APPLICATION.
  
 3. SUBMIT 2 COPIES OF TRUSS DRAWINGS
 SIGNED & SEALED AND APPROVED BY
 ARCHITECT

Review Stop Z ZONING
Rev No 1 Status P Date 2001-07-17 Cont ID  
Sent By sgraham Date 2001-07-17 Time 07:03 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***