| Plan Review Stops For Permit 01061001 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2001-08-02 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-08-02 |
Time |
14:24 |
Rev Time |
0.75 |
| Received By |
mcarsill |
Date |
2001-08-14 |
Time |
13:32 |
Sent To |
|
|
| Notes |
| 2001-08-02 00:00:00 | 1) PROPANE INSTALLATION TO COMPLY | | | WITH NFPA 58 AND RECOGNIZED STANDARDS. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
2001-07-03 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-07-03 |
Time |
14:10 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-07-03 |
Time |
14:10 |
Sent To |
|
|
| Notes |
| 2001-07-03 00:00:00 | 1) PLEASE CLARIFY HOW MANY POOL HEATERS | | | THERE ARE. ONLY TWO ARE SHOWN AND SEVEN | | | ARE MENTIONED. | | | 2) PLEASE PROVIDE INFORMATION REQUESTED | | | BY THE PLUMBING DIVISION SO THE PLANS | | | CAN BE APPROVED. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2001-06-21 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-06-21 |
Time |
13:38 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-06-21 |
Time |
13:38 |
Sent To |
|
|
| Notes |
| 2001-06-21 00:00:00 | 1) PLEASE PROVIDE INFORMATION ON THE | | | DEPTH OF THE BURIED UNDERGROUND PROPANE | | | TANKS WITH REGARDS TO FINISHED GRADE. | | | 2) PLEASE INDICATE SEPARATION DISTANCES | | | BETWEEN THE INDIVIDUAL PROPANE TANKS. | | | 3) PLEASE INDICATE SEPARATION DISTANCES | | | OF THE TANKS TO ALL BUILDINGS, PROPERTY | | | LINES, ETC. | | | 4) PLEASE PROVIDE INFORMATION ON ANY | | | REGULATORS OR OTHER APPURTENANT | | | EQUIPMENT. | | | 5) PLEASE PROVIDE MORE DETAILS ON | | | POOL HEATERS. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
5 |
Status |
P |
Date |
2002-01-09 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2002-01-09 |
Time |
16:01 |
Rev Time |
1.00 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2002-01-09 00:00:00 | ADD ONE POOL HTR, TOT OF EIGHT. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2001-08-14 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2001-08-14 |
Time |
13:33 |
Rev Time |
0.75 |
| Received By |
kstevens |
Date |
2001-08-14 |
Time |
13:33 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2001-08-03 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2001-08-03 |
Time |
11:29 |
Rev Time |
0.50 |
| Received By |
kstevens |
Date |
2001-08-03 |
Time |
11:29 |
Sent To |
|
|
| Notes |
| 2001-08-03 00:00:00 | DENIED | | | | | | 1) ITEM #1 OF PREVIOUS COMMENTS NOT ADD- | | | RESSED. SITE PLAN SHALL BE SIGNED AND | | | SEALED. SEE ATTACHED SHEETS. | | | | | | REVIEW KEN STEVENS | | | (561) 659-8096 EXT. 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2001-07-02 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2001-07-02 |
Time |
15:13 |
Rev Time |
0.75 |
| Received By |
kstevens |
Date |
2001-07-02 |
Time |
15:13 |
Sent To |
|
|
| Notes |
| 2001-07-02 00:00:00 | FAILED | | | | | | 1) SITE PLAN SHALL BE SIGNED AND SEALED | | | AS PER #7 OF PRIOR PLAN REVIEW NOTES. | | | | | | 2) ALL POOL HEATER LOCATIONS NOT SHOWN | | | ON RESUBMITTAL. SHOW ALL 7 POOL HEATERS | | | AND THEIR LOCATIONS. | | | | | | 3) DISTANCE TO MOST REMOTE HEATER NOT | | | SHOWN ON SUBMITTAL. PLEASE SHOW THIS | | | MEASUREMENT. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT. 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2001-06-21 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2001-06-21 |
Time |
15:31 |
Rev Time |
1.50 |
| Received By |
kstevens |
Date |
2001-06-21 |
Time |
15:30 |
Sent To |
|
|
| Notes |
| 2001-06-21 00:00:00 | REVIEW NOTES:FAILED | | | | | | REFERENCE NFPA-58 & SGC-97 | | | | | | 1) CONTAINERS TO BE MIN. OF 10' APART, | | | AND 10' FROM ANY BLDG. OR EXTERIOR | | | SOURCE OF IGNITION. | | | SECTS. 3-2.2.2 (F), AND TABLE 3-2.2.2 (D | | | | | | 2) UNDERGROUND CONTAINERS TO BE SECURELY | | | ANCHORED PER SEC. 3-2.2.7 (H) | | | | | | 3) PROVIDE PROTECTON AGAINST VEHICULAR | | | DAMAGE PER 3.2.4.8 (B) | | | | | | 4) AN ANODE BAG SHALL BE INSTALLED ON | | | EACH CONTAINER PER 3-2.4.8 (F) | | | | | | 5) SUBMIT MANUFACTURE SPEC. SHEET FOR | | | EACH POOL HEATER TO VERIFY COMPLIENCE | | | WITH STANDARDS OF NFPA 58 & SGC-97 | | | SEC 402. | | | | | | 6) SUBMIT MANUFACTURE SPEC. SHEET ON P.E | | | PIPE, AND SUBMIT A COPY OF THE SIZING | | | TABLE FROM SGC-97 PER SGC SEC. 302. | | | | | | 7) SUBMIT A SITE PLAN WITH WALK-WAYS, | | | DRIVE-WAYS, PARKING LOTS, STRUCTURES, | | | PROPERTY LINES, OR ANY STRUCTURES | | | THAT MAY AFFECT THE PLACING OF THE | | | CONTAINERS. THESE PLANS MUST BE SIGNED | | | AND SEALED BY AN ARCHITECH OR AN | | | ENGINEER. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT. 8377 |
|
|