| 2001-07-24 00:00:00 | *************BUILDING UNSAT************* |
| | |
| | 1) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 2) THE PLANS INDICATE A 50 GALLON WATER |
| | HEATER AND THE ENERGY CALCULATIONS LIST |
| | A 40 GALLON WATER HEATER. PLEASE |
| | CORRECT. |
| | |
| | 3) |
| | NOTE:IF OPTIONS ARE USED,THE CORRESPOND- |
| | ING PRODUCT APPROVALS MUST BE SUBMITTED. |
| | (DOUBLE FRENCH DOORS, FRENCH DOOR WITH |
| | SIDELITES) PROVIDE MANUFACTURERS SPECS |
| | AND LISTING INFORMATION IF OPTIONAL BBQ |
| | IS TO BE INSTALLED. |
| | |
| | 4) PROVIDE (2) PRODUCT APPROVALS, KEY |
| | PLANS AND INSTALLATION SCHEDULES |
| | INDICATING THE SPECIFIC TYPES OF ANCHORS |
| | TO BE USED FOR STORM PANELS OR APPLY |
| | UNDER A SEPARATE PERMIT. |
| | |
| | 5) STRUCTURE IS LOCATED IN AN AO FLOOD |
| | ZONE. AN ELEVATION CERTIFICATE WILL BE |
| | REQUIRED. |
| | |
| | 6) PLEASE INDICATE THE MEAN ROOF HEIGHT |
| | OF THE STRUCTURE. |
| | |
| | 7) PROVIDE A DESIGN COMPLIANCE FORM |
| | COMPLETED BY THE DESIGNER OF RECORD FOR |
| | THE STRUCTURE OR PROVIDE THE REQUIRED |
| | DESIGN PARAMETERS AND ASSUMPTIONS ON THE |
| | PLANS. |
| | |
| | 8) THE UPLIFT VALUES FROM THE TRUSS |
| | DRAWINGS EXCEED THE ANCHOR CAPACITIES |
| | LISTED ON THE PLANS FOR THE FOLLOWING |
| | TRUSSES: T7,T8,T10,T11,T12,T13,T14,T15, |
| | T21,T22,T24,T25,T28,T29,T30,T31. PLEASE |
| | REVIEW AND CORRECT. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |
| | |
| | |
| | TRUSSES |
| | UNSAT |
| | |
| | 1) THE BLOCK STAMP OF THE TRUSS ENGINEER |
| | IS REQUIRED ON THE TRUSS LAYOUT. |
| | |
| | 2) THE DETAIL DRAWINGS FOR BRACING, |
| | GABLES, OVERHANG, PIGGYBACK, ETC. ARE |
| | NOT SIGNED SEALED AND DATED BY THE |
| | ENGINEER. THESE DRAWINGS ALSO REFRENCE |
| | ASCE 7-93 AND 110 MPH WINDSPEED. THE 97 |
| | SBC REQUIRES THE DESIGN CRITERIA TO |
| | COMPLY WITH SECTION 1606 (110 MPH WIND- |
| | LOAD) OR ASCE 7-95 (145 MPH WINDLOAD). |
| | PLEASE CORRECT. |
| | |
| | 3) THE TRUSS LAYOUT LISTS ASCE 7-95 AND |
| | 140 MPH. THE WINDLOAD FOR W.P.B. IS |
| | 145 MPH BY LINEAR INTERPOLATION OF WIND |
| | SPEED CONTOUR LINES. PLEASE CORRECT. |
| | |
| | 4) TRUSS DRAWINGS TG33,T34 AND T35 ARE |
| | NOT SHOWN ON TRUSS LAYOUT. THE LAYOUT |
| | HAS TG31, T32 AND T33 AND NO CORRESPOND- |
| | ING DRAWINGS. PLEASE CLARIFY. PLEASE |
| | PROVIDE AN INDEX OF TRUSS DRAWINGS. |
| | |
| | |
| | NOTE: |
| | THESE COMMENTS APPLY TO THE FOLLOWING |
| | PERMIT NUMBERS: 01060846, 01060847, |
| | 01060848, 01060849. |