Plan Review Details - Permit 01060531
Plan Review Stops For Permit 01060531
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2001-06-22 Cont ID  
Sent By hpiskura Date 2001-06-22 Time 16:05 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2001-06-22 00:00:00PROVISO:PROVIDE CORRECTED PEER REVIEW
 FORM AND UPDATED FASTENER SCHEDULE.
  
 PROVIDE STAMP OR COVER LETTER OF EOR
 SHOP DRAWING REVIEW FOR DESIGN
 CONFORMANCE ON WINDOW WALL SYSTEM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2001-06-20 Cont ID  
Sent By hpiskura Date 2001-06-20 Time 16:12 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2001-06-20 00:00:00SHEET C1 YKK AMERICA CITES ASCE 7-93
 WITH AN 110 MPH WIND SPEED.THE 1997
 SBC AND THE PERMITTED PLANS CITE ASCE
 7-95 WITH 145 MPH.
  
 THE PERMITTED PLANS CALL OUT WIND
 PRESSURES OF + 67.1 AND - 67.6 FOR THE
 INTERIOR ZONES AND + 67.1 AND - 122.0
 FOR THE EDGE ZONES.
  
 A LETTER FORM THOMAS TWOMEY, PE DATED
 5/21/2001 STATES THAT HE REVIEWED YKK
 CALCULATIONS AND THAT THEY WILL MEET
 110 MPH.WHAT RELEVANCE IS THIS TO THIS
 PROJECT?
  
 THE MIAMI DADE NOTICE OF ACCEPTANCE
 #01-228.09 INCLUDED IS MISSING THE
 DRAWINGS NOTED UNDER SPECIFIC CONDITION
 2.1 AND 6.1.2 OF THAT REPORT.
  
 THE NOTICE ACCEPTANCE REPORT IS FOR
 SERIES YHC 300 OG,THE YKK AMERICA
 PLAN SHEET S1 SPEAKS TO YHS 50 ALSO.
 MISSILE IMPACT RESISTANCE TESTING IS
 REQUIRED FOR THAT SYSTEM TOO.
  
 ALL GLAZING MUST HAVE TEST REPORTS FOR
 MISSILE IMPACT.ONLY WINDLOAD
 COMPLIANCE MAY BE BY RATIONAL ANALYSIS
 AS PROVIDE FOR IN THE CITY'S HURRICANE
 MISSILE IMPACT POLICY.

Review Stop Z ZONING
Rev No 1 Status N Date 2001-06-22 Cont ID  
Sent By hpiskura Date 2001-06-22 Time 16:05 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***