Plan Review Details - Permit 01051384
Plan Review Stops For Permit 01051384
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2001-07-26 Cont ID  
Sent By lmartine Date 2001-07-26 Time 15:10 Rev Time 0.00
Received By lmartine Date   Time   Sent To  
Notes
2001-07-26 00:00:00APPROVED BY BOB GERWEY 7/26/01LM

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2001-07-26 Cont ID  
Sent By rmcdouga Date 2001-07-26 Time 08:35 Rev Time 1.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-07-26 00:00:00DENIED
  
 1) BATH GFCIS TO BE ON A SEPERATE 20 AMP
 CIRCUIT.
  
 2) GFCI OUTLET REQUIRED AT FRONT OF
 HOUSE.
  
 3) GFCI OUTLET REQUIRED ADJACENT TO
 POWDER ROOM LAVATORY.
  
 REVIEWED BY BOB GERWE.
 659-8096 EXT.8391

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2001-06-06 Cont ID  
Sent By dpalmer Date 2001-06-06 Time 22:53 Rev Time 0.00
Received By dpalmer Date 2001-06-06 Time 22:53 Sent To  
Notes
2001-06-06 00:00:00***************** UNSAT *************
  
 1)NOTE: PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW EQUIPMENT BEING INSTALLED.
 MAINS/PANELS/BREAKERS MUST BE RATED FOR
 THE AVAILABLE FAULT CURRENT PER 110-9.
 PLEASE NOTE AIC RATING IS SHOWN FOR
 PANEL, BUT NOT FOR MAIN DISCONNECT.
 PER 110-9/215-5
  
 2) PLEASE NOTE MISSING OUTLET(S) REQ`D
 BY 210-52E OF THE NEC.
 FRONT RECEPT.
  
 3) PLEASE NOTE MISSING OUTLET FOR A/C
 EQUIPMENT PER 210-63 OF NEC AND 309.1
 MECHANICAL CODE.
  
 4) PLEASE CLARIFY EQUIPMENT GROUNDING
 METHOD BETWEEN FIRST MEANS OF DISCONNECT
 AND PANEL(S). EQUIPMENT GROUNDING
 CONDUCTORS ARE TO BE SIZED BY 250-122.
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2001-06-06 Cont ID  
Sent By hmoser Date 2001-06-06 Time 18:09 Rev Time 0.33
Received By hmoser Date 2001-06-06 Time 18:09 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2001-08-30 Cont ID  
Sent By jleech Date 2001-08-30 Time 17:31 Rev Time 0.33
Received By jleech Date 2001-08-30 Time 17:31 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-06-02 Cont ID  
Sent By kstevens Date 2001-06-02 Time 09:58 Rev Time 0.33
Received By kstevens Date 2001-06-02 Time 09:58 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2001-11-19 Cont ID  
Sent By jgomez Date 2001-11-19 Time 17:50 Rev Time 1.00
Received By jgomez Date 2001-11-19 Time 17:50 Sent To  
Notes
2001-11-19 00:00:00PRODUCT APPROVALS REVIEW.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2001-07-20 Cont ID  
Sent By jgomez Date 2001-07-20 Time 18:46 Rev Time 2.00
Received By jgomez Date 2001-07-20 Time 18:46 Sent To  
Notes
2001-07-20 00:00:00APPROVED WITH PROVISO:
 1-PROVIDE COMPLETE INFORMATION FOR STORM
 PANELS UNDER A SEPARATE PERMIT.
 2-PROVIDE SURVEY WITH ORIGINAL SEAL,
 SIGNATURE AND DATE.
 3-PROVIDE PRODUCT APPROVAL FOR:
 A)ONE HOUR FIRE RATED GLASS BLOCK WITH
 CLEAR DRAWINGS.
 B)SLIDING GLASS DOORS WITH TRANSOM ABOVE
 SINGLE ASSEMBLY AS SHOWN ON PLANS.
 C)WINDOW MULLIONS.
 D)FIXED WINDOWS THAT INCLUDE SIZES AS
 SHOWN ON ARCHITECT'S PLANS.
 E)PGT ENGINEER TO SIGN, SEAL AND DATE
 LETTER FOR SHAPED FIXED WINDOWS AS
 REQUIRED BY CHAPTER 471 FL. STATUTES.
 F)ENTRY DOORS WITH LEGIBLE DRAWINGS.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2001-07-03 Cont ID  
Sent By jgomez Date 2001-07-02 Time 19:42 Rev Time 3.00
Received By jgomez Date 2001-07-02 Time 19:42 Sent To  
Notes
2001-07-03 00:00:00CHECKLIST:
 1-PLEASE FILE NOTICE OF COMMENCEMENT.
 2-PLEASE PAY IMPACT FEES TO PALM BCH CO.
 3-UPDATE SHEET C-1. SEE COMMENTS.
 4-SHEET A-1 IS MISSING SPECIFICATIONS
 FOR CONCRETE SLAB.
 5-PROVIDE ATTIC ACCESS. SECTION 2309.6
 SBC 1997.
 6-REVISE THE DESIGN CERTIFICATION FOR
 BUILDING CODE COMPLIANCE FORM. THE
 MEAN ROOF HEIGHT IS INCORRECT (18'-6"
 +/- ). REVISE VELOCITY PRESSURE
 ACCORDINGLY. TABLE 1606.2A SBC 1997.
 7-SOIL TEST REPORT TO HAVE ORIGINAL SEAL
 SIGNATURE AND DATE. CHAPTER 471 FL. ST
 8-PROVIDE PRODUCT APPROVAL FOR:
 A)GLASS BLOCK DRAWINGS ARE NOT LEGIBLE.
 B)SLIDING GLASS DOOR WITH TRANSOM ABOVE
 SINGLE ASSEMBLY AS SHOWN ON PLANS.
 C)WINDOW MULLIONS.
 D)FIXED WINDOWS WITH SIZES AS SHOWN ON
 ARCHITECT'S PLANS.
 E)PGT ENGINEER TO SIGN, SEAL AND DATE
 LETTER FOR SHAPED FIXED WINDOWS AS
 REQUIRED BY CHAPTER 471 FL STATUTES.
 F)ENTRY DOORS DRAWINGS ARE NOT LEGIBLE.
 9-STORM PANELS:
 -CLEARLY INDICATE ON APPROVED DRAWINGS
 THE SPECIFIC MOUNTING CONDITIONS AND
 ANCHOR TO BE USED ACCORDING TO THE
 MEAN ROOF HEIGHT, DESIGN PRESSURES,
 EDGE DISTANCE, PANEL SPAN, CONNECTION
 TYPE AND STRUCTURE TO BE ATTACHED TO
 (NOTE: THIS STRUCTURE IS MASONRY, NOT
 CONCRETE).
 -REVISE INSTALLATION SCHEDULE ANCHOR
 SPACING TO REFLECT CONDITIONS ABOVE.
 10-PROVIDE SURVEY WITH ORIGINAL SEAL,
 SIGNATURE AND DATE.

Review Stop Z ZONING
Rev No 1 Status P Date 2001-06-04 Cont ID  
Sent By sgraham Date 2001-06-04 Time 07:25 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved