Plan Review Details - Permit 01051077
| Plan Review Stops For Permit 01051077 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2001-06-12 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-06-12 |
Time |
13:32 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-06-12 |
Time |
13:32 |
Sent To |
|
|
| Notes |
| 2001-06-12 00:00:00 | ON JULY 12, 2001, WRITER CALLED LADONNA | | | HENDERSON OF RUBY BELL CORPORATION. IT | | | WAS INDICATED TO BOTH WRITER AND PATTY | | | KRAUSS THAT THE CEILING IS NOT RATED. | | | | | | 1) A CLEANOUT IS TO BE PROVIDED AT 12 | | | FEET. | | | 2) THE TECHNICAL DATA PROVIDED FOR THE | | | FLAMESHIELD BLANKET INDICATES THAT | | | PINNING IS REQUIRED. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2001-06-01 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-06-01 |
Time |
14:11 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-06-01 |
Time |
14:11 |
Sent To |
|
|
| Notes |
| 2001-06-01 00:00:00 | 1) NO DRAWINGS OF THE EXHAUST DUCT WHEN | | | IT LEAVES THE TOP OF THE HOOD. PLEASE | | | PROVIDE DUCT DRAWING. | | | 2) A FIRE DAMPER IS REQUIRED AT SUPPLY | | | AIR OPENING IF IT IS PRESENT UNDER THE | | | WELDED PORTION OF THE HOOD. | | | 3) SEPARATE PLANS AND PERMITS REQUIRED | | | FOR FIRE SUPPRESSION SYSTEM. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2001-06-12 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-06-12 |
Time |
13:52 |
Rev Time |
0.40 |
| Received By |
pkrauss |
Date |
2001-06-12 |
Time |
13:51 |
Sent To |
|
|
| Notes |
| 2001-06-12 00:00:00 | *******************PROVISO************** | | | | | | CALL FOR AN INSPECTION PRIOR TO CONCEALI | | | NG DUCTS OR WELDS WITH PAINT OR ANY OTHE | | | R MATERIAL.IF DUCT IS TO BE WRAPPED WI | | | TH A TWO LAYERED FIRE WRAP, CALL FOR AN | | | INSPECTION ON THE FIRST LAYER BEFORE THE | | | SECOND LAYER IS APPLIED. | | | | | | NOTE:MINIMUM SLOPE FOR GREASE HOOD | | | DUCT SYSTEMS IS 1 INCH PER FOOT | | | (1997 SMC 505.4), NOT 1/4 PER | | | FOOT AS DICTATED IN NFPA 96. | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT | | | PATTY KRAUSS AT 659-8096 EXT. 8388. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2001-06-01 |
|
|
Cont ID |
|
| Sent By |
ndenmark |
Date |
2001-06-01 |
Time |
15:00 |
Rev Time |
0.33 |
| Received By |
ndenmark |
Date |
2001-06-01 |
Time |
15:00 |
Sent To |
|
|
| Notes |
| 2001-06-01 00:00:00 | DENIED | | | PROVIDE INFORMATION ON DUCTS BOTH | | | EXHAUST AND MAKE UP AIR | | | IF MAKE UP AIR ENTERS HOOD UNDER MAIN | | | BODY OF HOOD A FIRE DAMPER WILL BE | | | REQUIRED PER NFPA 96. PROVIDE CLEAR | | | ENOUGH DRAWING TO INDICATE ANY | | | MATERIAL/PHYSICAL SEPARATION BETWEEN | | | HOOD AND MAKE UP AIR PLENUM TO INDICATE | | | FIRE DAMPER REQUIREMENT |
|
|
|