Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2001-05-17 Cont ID  
Sent By hpiskura Date 2001-05-17 Time 07:52 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2001-05-17 00:00:00SHEET AS1 UNDER NOTES DESIGN LOADS.
 THIS FACILITY SHOULD BE A CATEGORY IV
 AND NOT THE CATEGORY CATEGORY II
 DECLARED.IT IS AN ESSENTIAL PUBLIC
 UTILITY.
  
 THERE ARE NO SPECIFICATIONS FOR THE
 METAL BUILDING ON THE PLANS NOR SPEC
 BOOKS INCLUDED FOR REVIEW.
  
 THE GLAZING MUST MEET THE CITY'S HURRIC
 ANE MISSILE IMPACT RESISTANCE POLICY.
  
 SECTION AS2 SHEET AS 7 "SECURE PER PLANK
 MANUFACTURER'S RECOMMENDATIONS" IS NOT
 AN ACCEPTABLE SUBSTITUTE FOR SPECIFC
 DESIGN INFORMATION.
  
 TEST RPORTS AND DATA FOR THE WINDOWS,
 DOORS AND ROOF COVERING SHOULD BE
 PROVIDED WITH THE PERMIT APPLICATION.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2001-05-15 Cont ID  
Sent By dpalmer Date 2001-05-15 Time 18:57 Rev Time 0.00
Received By dpalmer Date 2001-05-15 Time 18:57 Sent To  
Notes
2001-05-15 00:00:00***************** UNSAT *************
  
 1)NOTE: PLEASE NOTE THAT ALL BRANCH
 CIRCUIT #`S NEED TO BE SHOWN ON PLANS.
 PLEASE SEE E-4
  
 2)NOTE: PLEASE NOTE THAT PLANS MUST BE
 SIGNED AND SEALED BY THE ENGINEER OF
 RECORD PER F.S. F.A.C 471.025
  
 PLEASE SUBMIT THE ABOVE FOR REVIEW.
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2001-12-14 Cont ID  
Sent By mamini Date 2001-12-14 Time 14:09 Rev Time 2.00
Received By mamini Date 2001-12-14 Time 14:09 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2001-05-15 Cont ID  
Sent By mamini Date 2001-05-15 Time 08:32 Rev Time 4.00
Received By mamini Date 2001-05-15 Time 08:29 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2001-05-15 Cont ID  
Sent By mcarsill Date 2001-05-15 Time 14:59 Rev Time 0.00
Received By mcarsill Date 2001-05-15 Time 14:59 Sent To  
Notes
2001-05-15 00:00:001) PLANS NOT SIGNED AND SEALED.
 2) PLEASE INDICATE WHAT THE SOLID
 DEWATERING BUILDING WILL BE USED FOR.
 WHAT PROCESSES ARE INVOLVED. ARE THERE
 ANY INHERENT DANGERS PRESENT. WHAT
 CHEMICAL PROCESSES ARE USED.
  
 CAPTAIN MIKE CARSILLO
 659-8096,EXT.8497
 835-2910

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2001-05-24 Cont ID  
Sent By pkrauss Date 2001-05-24 Time 09:05 Rev Time 0.45
Received By pkrauss Date 2001-05-24 Time 08:57 Sent To  
Notes
2001-05-24 00:00:00*******************DENIED***************
  
  
 PLEASE PROVIDE THE FOLLOWING INFORMATION
 FOR REVIEW.
  
  
 1.OUTSIDE AIR CALCULATIONS AS PER
 ASHRAE 62-89.
  
 2.AIR BALANCE SCHEDULE AS PER 1997
 SMC 501.2.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT
 PATTY KRAUSS AT 659-8096 EXT. 8388.

Review Stop P PLUMBING
Rev No 1 Status F Date 2001-05-25 Cont ID  
Sent By pschmitz Date 2001-05-25 Time 14:31 Rev Time 2.00
Received By pschmitz Date   Time   Sent To  
Notes
2001-05-25 00:00:00PLUMBING PLAN REVIEWDENIED
 (1) SHT AS-5 H/C REST RM IS NOT IN
 COPLIANCE W/FACBC-97,SEC 4.16.2
 WATERCLOSETS NOT IN A STALL,SEE FIG28
 ATTACHED.
 (2) SINKS COMPLY W/FACBC-97 SEC 4.24
 CLEAR FLR SPACE, SEE FIG 32 ATTACHED.
 (3) SPC-94 FLOOR DRAINS SEC 409.4 REQ.
 WITH TRAP PRIMER.
 END OF COMMENTSPAUL SCHMITZ
 QUESTIONS 561-659-8096 X 8233

Review Stop Z ZONING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved