| Plan Review Stops For Permit 01030582 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2002-12-12 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2002-12-12 |
Time |
07:21 |
Rev Time |
0.75 |
| Received By |
jwitmer |
Date |
2002-12-12 |
Time |
07:20 |
Sent To |
|
|
| Notes |
| 2002-12-12 00:00:00 | | | | BUILDING PLAN REVIEW | | | PERMIT: 01030582 | | | ADD: 4325 N HAVERHILL | | | CONT: UNITED ENG. CORP. | | | TEL: (561)###-#### | | | FL BLD CODE= 2001 FLORIDA BUILDING CODE | | | | | | SUBMITTAL 12-03-02DENIED | | | | | | AS THE PROVISO FOR ISSUANCE OF PERMIT | | | THE ENGINEERING FOR THE STRUCTURE SHALL | | | BE SIGNED & SEALED: | | | PLANS, SPECIFICATIONS,REPORTS OR | | | OTHER DOCUMENTS PREPARED BY THE DESIGN | | | PROFESSIONAL AND BEING FILED FOR PUBLIC | | | RECORD SHALL HAVE THE SIGNATURE AND | | | SEAL OF THE DESIGN PROFESSIONAL AFFIXED | | | TO THE DOCUMENT. | | | FL STATE STAT: 61G15-23.002 ENGINEERS | | | FL ATATE STAT: 61G16.003 ARCHITECTS | | | | | | 2) TWO (2) COPIES OF ALL SUBMITTAL ARE | | | REQUIRED, 1 FOR OFFICE RECORD, 1 FOR | | | THE FIELD SET OF PLANS. | | | BUILDING PLAN REVIEW | | | JIM WITMER |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2001-06-15 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-06-15 |
Time |
07:34 |
Rev Time |
1.50 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-06-15 00:00:00 | BUILDING PLAN REVIEW: | | | 4325 N HAVERHILL | | | CITY OF WEST PALM BEACH | | | RECLAIMED WATER PRODUCTION FACILITY | | | PERMIT # 01030582 | | | | | | BUILDING PROVISO: | | | 1)- THIS PROVISO HAS (2) ELEMENTS THAT | | | WILL HAVE TO BE SATISFIED TO RECEIVE | | | A CERTIFICATE OF OCCUPANCY. | | | A)- THAT THERE WILL BE A AUTOMATIC | | | FIRE SPRINKLER DEVISE,AN APPROVED FIRE | | | SUPRESSION SYSTEM, AT TTHE METHANAL | | | STORAGE FACILITY. | | | B)- THAT TTHE CONTRACTOR WILL PROVIDE | | | THE SIGNED & SEALED ENGINEERED DRAWINGS | | | FOR THE METAL BUILDING. | | | | | | BUILDING PLAAN REVIEW | | | JIM WITMER | | | (561) 659-8096 EX 8412 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2001-06-06 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-06-06 |
Time |
06:52 |
Rev Time |
6.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-06-06 00:00:00 | BUILDING PLAN REVIEW | | | PERMIT # 01030582 | | | 4325 N HAVERHILL RD | | | WASTE WATER TREATMENT PLANT | | | UNITED ENGINEERING CORP. | | | PHONE #(305)994-7360 | | | CAMP DRESSER & MC KEE | | | PHONE #(561)689-3336 | | | | | | 1)- SBC 308.1 HAZARDOUS OCCUPANCY | | | SUB-CLASSIFICATION : | | | H-2; METHANOL MSDS METYAL ALCOHOL | | | FLASH POINT: 12C | | | H-4; CAUSTIC MSDS CAUSTIC SODA/ | | | SODIUM HYDROXIDE | | | 2)- SBC TABLE 308.B LIMITS TO 60 GAL. | | | NOT SPRINKLERED FOR A CLASS 1A | | | FLAMMABLELIQUID (METHAL ALCOHOL) | | | FLAMMABLE & COMBUSTIBLE LIQUIDS IN OPEN | | | CONTAINERS OR | | | PRESSURIZED AT MORE THAN 15 PSIG. | | | SBCTABLE 308.D CORROSIVES UNPROTECTED | | | BY SPRINKLERS OR CABINET FOR SOLIDS | | | 5,000LBS. LIQUIDS 500 GAL. IS THIS TYPE | | | OF USAGE A SOLID OR LIQUID? | | | 3)- SBC INDOOR STORAGE AREAS, STORAAGE | | | BUILDINGS, AND AREAS OR ROOMS IN WHICH | | | HAZARDOUS MATERIALS ARE DISPENSED OR | | | USED SHALL BE PROTECTED BY AN AUTOMATIC | | | SPRINKLER SYSTEM. HIGHER AUTOMATIC | | | SPRINKLER DISCHARGE DENSITY MAY BE | | | REQUIRED | | | THAN REQUIRED THAN ARE SUPPLIED BY | | | ORDINARY HAZARD, GROUP 2 TO ADEQUUATELY | | | PRO- TECT MANY TYPES OF HAZARDOUS | | | MATERIALS. NFPA 13, 1-1 INDICATES THAT | | | THE PROTEC- | | | TION OF MANY OF THESE MATERIALS IS BE- | | | YOND THE SCOPE OF THE STANDARD. THERE- | | | FORE, OTHER NFPA STANDARDS OR TEST DATA | | | MAYBE SUBSTANTIATE SPRINKLER DESIGN | | | DETAILS. | | | 4)- SBC 407.2.1- STORAGE & DISPENSING | | | AREAS- THIS DIVISION SHALL APPLY TO THE | | | STORAGE AND DISPENSING OF HAZARDOUS MATE | | | RIALS IN EXCESS OF THE EXEMPT AMOUNTS | | | SPECIFIED IN TABLES 308.2A THROUGH | | | 308.2D. | | | 5)- SBC 407 2.3.4(3) SECONDARY CONTAIN- | | | MENT SHALL BE DESIGNED TO RETAIN THE | | | SPILL FROM THE LARGEST SINGLE CONTAINER | | | PLUS THE DESIGN FLOW RATE OF THE AUTOMA- | | | TIC FIRE EXTINGUISHING SYSTEM FOR THE | | | AREA OF THE ROOM OR AREA IN WHICH THE | | | STORAGE, WHICHEVER IS SMALLER. THE | | | CONTAINMENT CAPACITY SHALL BE CAPABLE OF | | | CONTAINING THE FLOW FOR A PERIOD OF 20 | | | MINUTES. | | | 6)- THE PRE-ENGINEERED METAL BUILDING | | | HOUSING THE CHEMICALS WILL NEED TO | | | SUPPLY SIGNED & SEALED ENGINEERED DRAW- | | | INGS BEFORE THE ISSUANCE OF THE PERMIT, | | | OR IT MAY BE BROUGHT IN UNDER SEPERATE | | | PERMIT WITH ADDITIONAL FEES. | | | | | | BUILDING PLAN REVIEW | | | JIM WITMER | | | (561) 659-8096 EX 8412 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2001-04-12 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-04-12 |
Time |
18:36 |
Rev Time |
4.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-04-12 00:00:00 | BUILDING PLAN REVIEW | | | PERMIT # 01030582 | | | 4325 N HAVERHILL RD | | | EAST CENTRAL REGIONAL | | | WASTE WATER TREATMENT PLANT | | | UNITED ENGINEERING CORP. | | | (305) 994-7360 | | | | | | 1)- SBC 704 SPECIAL HAZARD OCCUPANCIES | | | 407.1.1.1. STORAGE, DISPENSING, HANDLING | | | AND THE USE OF SOLID,LIQUID & GASEOUS | | | HAZARDOUS MATERIALS SHALL BE IN ACCORD- | | | ANCE WITH THIS SECTION & THE STANDARD | | | FIRE PREVENTION CODE. | | | | | | HAZARDOUS OCCUPANCY | | | H2: CLASS I,II,ORIII-A FLAMMABLES OR | | | COMBUSTIBLE LIQUIDS. | | | H4:HEALTH HAZARDS, CORROSIVES,IRRITANTS. | | | | | | 2)- SBC 407.1.3 REQUIRES AN AUTOMATIC | | | PROTECTION SYSTEM. | | | | | | 3)- SBC 407 2.3.4.(1-4) SHOW COMPLIANCE | | | WITH THESE SYSTEMS. | | | | | | 4)- SBC 104.2.2. ADDITIONAL INFORMATION | | | REQUIRED, PLEASE PROVIDE INFORMATION ON | | | THE STORAGE TANKS, THE SECONDARY CONTAIN | | | MENT SYSTEM, IS THERE A MEMBRANE APPLIED | | | TO THE CONTAINMENT AREA? IS THERE A | | | DRAIN? ETC? | | | | | | 5)- THE OPEN STRUCTURE ABOVE, WILL THERE | | | BE A CORROSIVE PROBLEM WITH THE CONTENTS | | | OF THE TANKS? SULFURIC ACID/ FERRIC SUL- | | | FATE? | | | | | | 6)- THE PRE-ENGINEERED METAL BUILDING | | | HOUSING THE CHEMICALS WILL NEED TO SUP- | | | PLY SIGNED & SEALED ENGINEERED DRAWINGS | | | BEFORE THE ISSUANCE OF THE PERMIT OR IT | | | MAY BE BROUGHT IN UNDER SEPERATE PERMIT | | | WITH ADDITIONAL FEES. | | | | | | BUILDING PLAN REVIEW | | | JIM WITMER | | | (561) 659-8096 EX 8412 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2001-04-03 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-04-03 |
Time |
11:59 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-04-02 |
Time |
22:48 |
Sent To |
|
|
| Notes |
| 2001-04-03 00:00:00 | **************** PROVISO ************** | | | | | | 1)NOTE: PLEASE SUBMIT PLANS SHOWING ALL | | | BRANCH CIRCUIT #`S AND CORRELATE WITH | | | PANEL SCHEDULES. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW BEFORE FINAL ELECTRICAL | | | INSPECTION IS CALLED IN. | | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2001-03-16 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2001-03-16 |
Time |
10:41 |
Rev Time |
3.00 |
| Received By |
mamini |
Date |
2001-03-16 |
Time |
10:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2001-06-13 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-06-13 |
Time |
10:53 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-06-13 |
Time |
10:53 |
Sent To |
|
|
| Notes |
| 2001-06-13 00:00:00 | ON JULY 13, 2001, WRITER AND JIM | | | WHITMER RECEIVED A LETTER FROM DAVID | | | HOLT, P.E. OF CAMP DRESSER & MCKEE. THE | | | LETTER ADVISED THAT A FIRE SPRINKLER | | | SYSTEM WILL BE INSTALLED TO PROTECT | | | THE METHANOL STORAGE TANK. THE FIRE | | | SPRINKLER SYSTEM IS TO MEET HIGH-HAZARD | | | REQUIREMENTS AND BE DESIGNED BY A | | | LICENSED FIRE PROTECTION ENGINEER. THE | | | FIRE SPRINKLER SYSTEM IS TO BE PERMITTED | | | INSTALLED AND INSPECTED PRIOR TO THE | | | METHANOL TANK BEING ERECTED AND FILLED. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
F |
Date |
2001-06-07 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-06-07 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-06-07 |
Time |
15:13 |
Sent To |
|
|
| Notes |
| 2001-06-07 00:00:00 | 1) THIS OFFICE HAS IDENTIFIED THE | | | BUILDING AS A HIGH-HAZARD OCCUPANCY | | | AND WILL REQUIRE SOME TYPE OF APPROVED | | | FIRE SUPPRESSION SYSTEM FOR THE | | | AREA CONTAINING THE METHANOL STORAGE. | | | 2) PLEASE PROVIDE APPROVALS FOR THE | | | STORAGE TANKS. | | | 3) PLEASE INDICATE THE TYPES OF PRESSURE | | | OF THE MATERIALS STORED IN THE TANKS. | | | 4) PLEASE INDICATE COMPLIANCE WITH CITY | | | CODE SECTION 11, WHICH REQUIRES AT LEAST | | | A 2" VENT PIPE FOR THE METHANOL STORAGE. | | | 5) PLEASE SHOW LOCATIONS OF ALL FIRE | | | HYDRANTS, FIRE EXTINGUISHING EQUIPMENT | | | AND FIRE PROTECTION FEATURES. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2001-03-28 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-03-28 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-03-28 |
Time |
15:13 |
Sent To |
|
|
| Notes |
| 2001-03-28 00:00:00 | 1) PLEASE PROVIDE MATERIAL SAFETY DATA | | | SHEETS FOR THE STORAGE OF METHANOL, | | | FERRIC SULFATE, AND CAUSTIC MATERIALS. | | | 2) PLEASE BE ADVISED THAT COMPLIANCE | | | WITH CITY ORDINACE 3206-99 HAZARDOUS | | | MATERIALS OF CHAPTER 11 WILL BE | | | REQUIRED. | | | 3) PLEASE PROVIDE INFORMATION ON THE | | | STORAGE TANKS BEING USED TO HOLD THE | | | METHANOL, FERRIC SULFATE AND THE CAUSTIC | | | MATERIALS. | | | 4) PLEASE INDICATE THE WARNING SIGNS AND | | | VERBAGE PLANNED FOR THE METHANOL, FERRIC | | | SULFATE AND CAUSTIC STORAGE AREAS. | | | 5) WHAT TYPES OF FIRE PROTECTION IS | | | PLANNED FOR THE METHANOL STORAGE AREA. | | | 6) WHAT PRECAUTIONS ARE PLANNED FOR | | | SPILLS, LEAKS, AND OTHER TYPES MISHAPS | | | IN THE STORAGE AREA. | | | 7) PLEASE DISPLAY COMPLIANCE WITH NFPA | | | 30, FOR THE METHANOL STORAGE. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2001-04-17 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-04-17 |
Time |
11:48 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2001-04-17 |
Time |
10:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2001-05-27 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2001-05-27 |
Time |
17:00 |
Rev Time |
1.00 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-05-27 00:00:00 | PLUMBING PLAN REVIEW RE-SUB | | | RECLAIMED WATER,TO REPLENISH WET LANDS. | | | AS PER CHRIS HELFRICH PEWPBPU DEPT. | | | END OF COMMENTS PAUL SCHMITZ | | | QUESTIONS 561-659-8096 X 8233 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2001-05-05 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2001-05-05 |
Time |
05:33 |
Rev Time |
2.50 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-05-05 00:00:00 | PLUMBING PLAN REVIEWDENIED | | | (1) INFORMATION ON THE USE OF POTABLE | | | WATER, IN THIS PROCESS, AND LOCATION OF | | | EACH OUTLET AND HOW IT IS PROTECTED. | | | END OF COMMENTSPAUL SCHMITZ | | | QUESTIONS561-659-8096 X 8233 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2001-07-19 |
|
|
Cont ID |
|
| Sent By |
lmartine |
Date |
2001-07-19 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|