| Plan Review Stops For Permit 01020706 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2001-04-19 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2001-04-19 |
Time |
11:21 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2001-02-27 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2001-02-27 |
Time |
07:28 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-02-27 00:00:00 | 1)SHEET S3 SECTIONS 1/S3 AND AND 3/S3 | | | HAVE CONFLICTING INFORMATION AS TO THE | | | PRECAST SIZES.PLEASE CLARIFY.SEE | | | SBC 104.2. | | | | | | 2) HOW WILL THE ANCHOR BOLTS SHOWN ON S3 | | | TYPICAL COLUMN FOOTING BE PLACED IN | | | THEEXISTING SLAB? | | | | | | 3)CLEARLY NOTE THE CONCURRENT | | | EXTENSION OF THE FIRE SPRINKLER SYSTEM. | | | SEE SBC 903.2. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2001-04-23 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-04-23 |
Time |
18:43 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-04-23 |
Time |
18:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2001-03-01 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-03-01 |
Time |
18:13 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-03-01 |
Time |
18:13 |
Sent To |
|
|
| Notes |
| 2001-03-01 00:00:00 | *************** UNSAT **************** | | | | | | 1NOTE: PLEASE SUBMIT PLANS SHOWING ALL | | | BRANCH CIRCUIT #`S. ALL CIRCUIT ARE TO C | | | ORRELATE WITH SUBMITTED PANEL SCHEDULES. | | | | | | 2)NOTE: PLEASE SUBMIT AND SHOW LOAD | | | CALCULATIONS PER 220. PLEASE NOTE THAT | | | ALL CONTINUOUS LOADS ARE TO BE SHOWN AT | | | 125%. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS | | | PLEASE CALL | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2001-04-27 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-04-27 |
Time |
10:56 |
Rev Time |
0.00 |
| Received By |
pkrauss |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2001-04-16 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-04-16 |
Time |
12:49 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-04-16 |
Time |
12:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2001-02-23 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-02-23 |
Time |
15:50 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-02-23 |
Time |
15:49 |
Sent To |
|
|
| Notes |
| 2001-02-23 00:00:00 | 1) PARTIAL SITE PLAN DOES NOT IDENTIFY | | | EXISTING FIRE HYDRANT LOCATIONS. | | | 2) PLEASE PROVIDE SEATING DIAGRAM. | | | 3) PLEASE INDICATE IF FIRE SPRINKLERS | | | ARE PLANNED FOR THE LUNCHROOM. | | | 4) EXITS FROM THE LUNCHROOM ARE NOT | | | PROPERLY SEPARATED FROM ONE ANOTHER. | | | 5) PROVISIONS ARE TO BE MADE FOR AT | | | LEAST TWO HANDICAPPED PERSONS. | | | 6) PLEASE PROVIDE INTERIOR FINISH | | | INFORMATION FOR THE WALLS AND CEILINGS. | | | 7) ANY CHANGES IN ELEVATIONS LESS THAN | | | 21 INCHES SHALL BE BY RAMPS. | | | | | | CAPATIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2001-04-26 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-04-26 |
Time |
15:40 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2001-04-26 |
Time |
15:35 |
Sent To |
|
|
| Notes |
| 2001-04-26 00:00:00 | MECHANICAL PERMIT REQUIRED PRIOR TO ANY | | | MECHANICAL WORK BEING DONE. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2001-03-02 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-03-02 |
Time |
12:31 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2001-03-02 |
Time |
12:17 |
Sent To |
|
|
| Notes |
| 2001-03-02 00:00:00 | ******************DENIED**************** | | | | | | PROVIDE AIR BALANCE SCHEDULE AND OUTSIDE | | | AIR CALCULATIONS AS PER ASHRAE 62-89. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2001-04-26 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2001-04-26 |
Time |
18:45 |
Rev Time |
0.15 |
| Received By |
kstevens |
Date |
2001-04-26 |
Time |
18:44 |
Sent To |
|
|
| Notes |
| 2001-04-26 00:00:00 | PLAN REVIEW APPROVED 3-4-01 BY | | | PAUL SCHMITZ BUT NOT ENTERED INTO | | | COMPUTER. (KEN STEVENS) |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2001-02-22 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2001-02-22 |
Time |
09:02 |
Rev Time |
0.25 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|