| Plan Review Stops For Permit 01020455 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2001-02-22 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2001-02-22 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2001-02-21 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2001-02-21 |
Time |
13:21 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-02-21 00:00:00 | PLEASE PROVIDE A SKETCH OF THE BUILDING | | | INDICATING THE LOCATION AND SIZE OF | | | WINDOWS TO BE REPLACED.IF THE OPENING | | | SIZE IS TO BE MADE NEW, LARGER OR | | | SMALLER, INCLUDE A CONSTRUCTION DETAIL. | | | | | | WHAT SURFACE PREPARATION WILL BE DONE | | | FOR THE "SKIM STUCCO" ?WIRE LATH? | | | SANDBLASTING? ETCHING? BONDING AGENT? | | | | | | THE NORANDEX PRODUCT APPROVAL MUST HAVE | | | THE ORIGINAL SIGNATURE, DATE AND | | | EMBNOSSED SEAL OF THE ENGINEER. | | | | | | INDICATE WHICH WINDOWS WILL BE USED. | | | | | | THE METRO DADE ACCEPTANCE REPORT IS | | | MISSING SHEETS 8 THROUGH 9 CALLED OUT | | | IN THE REPORT.SEE PAGE 2 #6 OF THE | | | REPORT FOR PERMIT REQUIREMENTS. | | | E | | | IF 50% OR MORE OF THE WINDOWS ARE BEING | | | REPLACED THEN SHUTTERS OR HURRICANE | | | MISSILE IMPACT RESISTANT GLAZING IS | | | REQUIRED |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2001-02-22 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2001-02-22 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|