Plan Review Details - Permit 01011120
Plan Review Stops For Permit 01011120
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2001-03-08 Cont ID  
Sent By dpalmer Date 2001-03-08 Time 17:53 Rev Time 0.00
Received By dpalmer Date 2001-03-08 Time 17:53 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2001-02-28 Cont ID  
Sent By dpalmer Date 2001-02-28 Time 19:15 Rev Time 0.00
Received By dpalmer Date 2001-02-28 Time 19:15 Sent To  
Notes
2001-02-28 00:00:00**************** UNSAT ***************
  
 1)NOTE: PLEASE NOTE WHEN PLANS WERE
 FIRST SUBMITTED NO ELECTRICAL SERVICE
 CHANGE WAS SUBMITTED. PLEASE NOTE, NOW
 THERE IS MORE INFORMATION THAT IS
 NEEDED.
 NOTE: PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW EQUIPMENT BEING INSTALLED.
 MAINS/PANELS/BREAKERS MUST BE RATED FOR
 THE AVAILABLE FAULT CURRENT PER 110-9.
  
 2)NOTE: PLEASE SEE LOAD CALCULATION
 SUBMITTED. PLEASE NOTE TWO(2) SM APPL
 CIRCUITS ARE REQ`D.
  
 3)NOTE: PLEASE CLARIFY THE EQUIPMENT
 GROUNDING CONDUCTOR BETWEEN MAIN AND
 PANEL. PER 250-122
  
 4) NOTE: PLEASE SHOW GROUNDING
 ELECTRODEGOING TO BUILDING STEEL OF NEW
 BLDG TO BE BONDED. PER 250-50.
  
 5)NOTE: PLEASE NOTE THAT ALL ITEMS THAT
 WERE REDLINED ON FIRST REVIEW NEED TO BE
 DRAWN IN IN THE MANNER IN WHICH THE REST
 OF THE PLANS ARE DRAWN.104.2 ADMIN
 CODE.
  
 PLEASE SHOW LOCATION OF NEW EQUIPMENT IF
 KNOWN AT THIS TIME.
  
 PLEASE SUBMIT ALL THE ABOVE INFORMATION
 FOR REVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2001-01-29 Cont ID  
Sent By dpalmer Date 2001-01-29 Time 14:16 Rev Time 0.00
Received By dpalmer Date 2001-01-29 Time 13:05 Sent To  
Notes
2001-01-29 00:00:00****************** UNSAT ***************
  
  
  
  
 1) NOTE: SMOKE DETECTORS ARE REQUIRED
 INSIDE AND OUTSIDE ALL SLEEPING ROOMS.
 ALSO ON EACH LEVEL OF A MULTI-LEVEL
 DWELLING UNIT. ROOMS WITH BATHS AND OR
 CLOSETS ARE CONSIDERED SLEEPING ROOMS.
 PER NFPA-72 2-2.1.1.1.
  
 2) PLEASE NOTE EITHER MISSING EGRESS
 LIGHTING AND/OR CLARIFY EGRESS LIGHTING
 PER 210-70 OF THE NEC. DO THE FANS IN
 GUEST SUITE AND DEN HAVE LT KITS?
  
 3) NOTE: PLEASE SHOW ALL OUTLET SPACING
 TO MEET 2`,6`,12` RULE PER 210-52.
  
 4)NOTE: PLEASE SUBMIT LOAD CALCULATIONS
 AND SHOW SIZE OF EXISITNG ELECTRCIAL
 SERVICE. 215-5 AND 220-3-C-1.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT8372

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2001-02-24 Cont ID  
Sent By jleech Date 2001-02-24 Time 11:22 Rev Time 0.33
Received By jleech Date 2001-02-24 Time 11:22 Sent To  
Notes
2001-02-24 00:00:00PROVISO;
  
 1.SHOW R/A LOCATION. (SHOULD BE IN
 CENTER ROOM.) ALSO SHOW SIZE OF RETURN
  
 2.SHOW DUCT SIZE TO DROP IN ROOM THAT
 A/H IS IN.
  
 3.SHOW LOCATION OF C.U. C.U. SHOULD BE
 ON A SOLID CONCRETE SLAB MINIMUM OF 3"
  
  
 REVISED DRAWINGS REQUIRED BEFORE ROUGH
 A/C INSPECTION.
  
 A/C PLAN REVIEW BY;
 JOHN LEECH
 659-8096 EXT.8377

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2001-01-27 Cont ID  
Sent By jleech Date 2001-01-27 Time 07:06 Rev Time 0.00
Received By jleech Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2001-01-27 Cont ID  
Sent By jleech Date 2001-01-27 Time 07:06 Rev Time 0.00
Received By jleech Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2001-03-09 Cont ID  
Sent By fknapp Date 2001-03-09 Time 10:03 Rev Time 2.00
Received By fknapp Date 2001-03-09 Time 10:03 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2001-02-08 Cont ID  
Sent By fknapp Date 2001-02-08 Time 10:32 Rev Time 4.00
Received By fknapp Date 2001-02-08 Time 10:31 Sent To  
Notes
2001-02-08 00:00:00 
  
 *************BUILDING UNSAT*************
  
 SBC 104.2.2
  
 1) PROVIDE ENERGY CALCULATIONS THAT HAVE
 SIGNATURE OF OWNER/AGENT.
  
 2) PROVIDE STORM PANEL INFORMATION WITH
 INSTALLATION SCHEDULE AND KEY PLAN WITH
 SPECIFIC ANCHORS AND MOUNTING TO BE USED
 FOR ALL NON-IMPACT GLAZING.
  
 3) PROVIDE 2 CURRENT COMPLETE COPIES OF
 SBCCI OR METRO DADE PRODUCT APPROVALS
 FOR ROOF COVERING UNDER SEPARATE PERMIT.
  
 4) PROVIDE VENTILATION FOR FLAT ROOF PER
 1997 SBC 2309.7.2
  
 5) PROVIDE MECHANICAL DRAWINGS WITH
 MECHANICAL PERMIT APPLICATION.
  
 6) BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM
 BEACH CO.,THE PERMIT PLANS STAMPED BY
 THEM AND THE RECEIPT ATTACHED TO THE
 PERMIT APPLICATION.
  
 ANY QUESTIONS PLEASE CALL,
 FRANK KNAPP
 BUILDING PLAN REVIEW
 DEPARTMENT OF CONSTRUCTION SERVICES
 CITY OF WEST PALM BEACH
 (561) 659-8096 EXT. 8392

Review Stop Z ZONING
Rev No 1 Status P Date 2001-02-08 Cont ID  
Sent By sgraham Date 2001-02-08 Time 12:44 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***