| Plan Review Stops For Permit 01010021 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2001-06-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-06-26 |
Time |
12:47 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
2001-06-06 |
Time |
12:44 |
Sent To |
|
|
| Notes |
| 2001-06-26 00:00:00 | REVISION |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2001-02-28 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-02-28 |
Time |
11:10 |
Rev Time |
2.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2001-02-07 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-02-07 |
Time |
16:27 |
Rev Time |
2.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-02-07 00:00:00 | THE SAME THREE COMMENTS AS THE FIRST | | | REVIEW: | | | 1)- SHEET A1 MAKES REFRENCE TO THE | | | SOUTH FL BUILDING CODE IN SEVERAL PLACES | | | THE CITY USES THE 1997 STANDARD BUILDING | | | CODE. PLEASE REVISE AS NECESSARY. | | | 2)- THE PLANS DONOT CLEARLY NOTE THE | | | REQUIRED USE OF FIRE RETARDANT TREATED | | | WOOD BLOCKING IN PARTITIONS. SEE SBC | | | 609.1.2. SEE SHEETS A-9. | | | 3)- SHOW THE METHOD OF FIRE PROTECTION | | | FOR THE NEW STEEL BEAMS, (2HR), AS | | | REQUIREDBY SBC TABLE 600 FOR TYPE II | | | CONSTRUCTION. | | | | | | BUILDING PLAN REVIEW | | | JIM WITMER | | | (561) 659-8096 EX 8412 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2001-01-10 |
|
|
Cont ID |
|
| Sent By |
hpiskura |
Date |
2001-01-10 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
hpiskura |
Date |
2001-01-10 |
Time |
08:56 |
Sent To |
|
|
| Notes |
| 2001-01-10 00:00:00 | 1 SHEET A1 MAKES REFERENCE TO THE SOUTH | | | FL BUILDING CODE IN SEVERAL PLACES.THE | | | CITY USES THE 1997 STANDARD BUILDING | | | CODE.PLEASE REVISE AS NECESSARY. | | | | | | 2THE PLANS DO NOT CLEARLY NOTE THE | | | REQUIRED USE OF FIRE RETARDANT TREATED | | | WOOD BL0CKING IN PARTITIONS.SEE SBC | | | 609.2. | | | | | | 3SHOW THE METHOD OF FIRE PROTECTION | | | FOR THE NEW STEEL BEAMS, (2HR), AS | | | REQUIRED BY SBC TABLE 600 FOR TYPE II | | | CONSTRUCTION. | | | | | | HAROLD PISKURA |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2001-04-05 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-04-05 |
Time |
20:39 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-04-05 |
Time |
20:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2001-03-06 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-03-06 |
Time |
18:26 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-03-06 |
Time |
18:26 |
Sent To |
|
|
| Notes |
| 2001-03-06 00:00:00 | ********* PROVISO / REVISION *********** | | | | | | 1)NOTE: PLEASE SEE NOTES FROM FIRST AND | | | SECOND REVIEW. PLEASE NOTE AIC RATING | | | FOR NEW 200A DISCONNECT FROM BUS DUCT | | | DOES NOT SHOW AIC RATING????? | | | PLEASE REVISE ELECTRICAL SHEET AND | | | SUBMIT FOR REVIEW BEFORE ANY ELECTRICAL | | | INSPECTIONS IS CALLED IN!!!! | | | | | | THIS IS A REVISION AND A FEE WILL BE DUE | | | IF THERE ARE ANY QUESTIONS, PLEASE CALL | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2001-02-14 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-02-14 |
Time |
19:42 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-02-14 |
Time |
19:42 |
Sent To |
|
|
| Notes |
| 2001-02-14 00:00:00 | ****************** UNSAT *************** | | | | | | 1)NOTE: SAME NOTES FROM FIRST REVIEW | | | WERE NOT ADDRESSED.PANEL AIC RATINGS ARE | | | SHOWN BUT NOT FOR DISCONNECT FEEDING | | | PANEL "HE2" PLANS ARE COMING BACK FOR | | | BLDG COMMENTS. PLEASE SUBMIT. | | | | | | | | | PLEASE SUBMIT FOR REVIEW IF THERE ARE | | | ANY QUESTIONS PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2001-01-17 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-01-17 |
Time |
21:16 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-01-17 |
Time |
21:16 |
Sent To |
|
|
| Notes |
| 2001-01-17 00:00:00 | **************** UNSAT ***************** | | | | | | 1)NOTE: PLEASE SUBMIT AIC RATINGS FOR | | | ALL NEW EQUIPMENT BEING INSTALLED. | | | MAINS/PANELS/BREAKERS MUST BE RATED FOR | | | THE AVAILABLE FAULT CURRNET PER 110-9. | | | PLEASE NOTE AIC RATING FOR MAIN? | | | PLEASE PROVIDE CLARIFICATION ON MAIN | | | DISCONNECT. 200/220A. 220A? IS NOT A | | | STANDARD SIZE UNDER 240-6. TYPE O | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS PLEAS | | | E CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW. | | | 659-8096 EXT 8372 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2001-02-02 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2001-02-02 |
Time |
08:10 |
Rev Time |
0.00 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2001-02-14 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-02-14 |
Time |
14:49 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-02-14 |
Time |
14:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2001-01-11 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-01-11 |
Time |
10:06 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-01-11 |
Time |
10:06 |
Sent To |
|
|
| Notes |
| 2001-01-11 00:00:00 | 1) NO FIRE SPRINKLER DRAWINGS PROVIDED | | | WITH PLANS. | | | 2) NO INTERIOR FINISH CLASSIFICATION | | | INFORMATION PROVIDED WITH PLANS. | | | 3) ADDITIONAL EMERGENCY LIGHTING APPEARS | | | TO BE NEEDED IN CORRIDORS OF SPACE. | | | 4) THE FIRE ALARM NOTES SECTION | | | INDICATES CLASS B, STYLE C CIRCUITS. | | | ONLY CLASS A, STYLE D CIRCUITS ALLOWED. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2001-06-19 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-06-19 |
Time |
12:28 |
Rev Time |
0.30 |
| Received By |
pkrauss |
Date |
2001-06-19 |
Time |
12:14 |
Sent To |
|
|
| Notes |
| 2001-06-19 00:00:00 | AS BUILT DRAWINGS. 6/19/01 | | | MECHANICAL PERMIT 01031276 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2001-03-29 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-03-29 |
Time |
12:16 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2001-03-29 |
Time |
11:55 |
Sent To |
|
|
| Notes |
| 2001-03-29 00:00:00 | DRAWING M0-1 VAV BOX SCHEDULE NEEDS TO | | | REFLECT NEW VAV ADDED IN ROOM 220 ON | | | DRAWING M2-1. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2001-02-02 |
|
|
Cont ID |
|
| Sent By |
ndenmark |
Date |
2001-02-02 |
Time |
07:44 |
Rev Time |
0.35 |
| Received By |
ndenmark |
Date |
2001-02-02 |
Time |
07:44 |
Sent To |
|
|
| Notes |
| 2001-02-02 00:00:00 | PROVISO: | | | 1. FIELD VERIFY RATING OF WALL AT COMMON | | | AREA BATHROOMS. FIRE DAMPER WILL BE | | | REQUIRED IF WALL IS RATED. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2001-04-14 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-04-14 |
Time |
11:06 |
Rev Time |
0.33 |
| Received By |
jleech |
Date |
2001-04-14 |
Time |
11:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2001-01-21 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2001-01-21 |
Time |
08:37 |
Rev Time |
1.25 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-21 00:00:00 | PROVISO,SHT.P-1 AIR CHAMBERS COMPLY W/ S | | | PC 94 SEC 607.8.3 | | | BREAK RM SINK COMPLY W/FACBC 4.25 KNEE | | | CLEARANCE CLEAR FLR SPACE.PES |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
|
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
2001-02-02 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2001-02-02 |
Time |
08:10 |
Rev Time |
0.00 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|