| Plan Review Stops For Permit 00120912 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2002-01-16 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2002-01-16 |
Time |
17:51 |
Rev Time |
1.11 |
| Received By |
jwitmer |
Date |
2002-01-16 |
Time |
17:51 |
Sent To |
|
|
| Notes |
| 2002-01-16 00:00:00 | PLANS SHALL BE REVIEWED BY PALM BEACH | | | COUNTY FOR IMPACT FEES BEFORE ISSUANCE. | | | A CONTRACTOR SHALL BE REQUIRED TO APPLY | | | FOR PERMIT BEFORE ISSUANCE. | | | JIM WITMER |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2001-12-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-12-17 |
Time |
09:46 |
Rev Time |
2.50 |
| Received By |
jwitmer |
Date |
2001-12-17 |
Time |
09:46 |
Sent To |
|
|
| Notes |
| 2001-12-17 00:00:00 | BUILDING PLAN REVIEW | | | PERMIT # 00120912 | | | 116 21 ST ST | | | COLEMAN PARK | | | CONT: JMW CONSTRUCTION CORP | | | (561) 417-0077 | | | | | | 1)- SBC 1606.2.6.2 COMPONENTS & CLADDING | | | (2 COPIES) OF EITHER SBCCI OR DADE COUN- | | | TY PRODUCT APPROVALS REQUIRED FOR ALL | | | GLAZED OPENINGS.LARGE MISSLE IMPACT | | | RESISTANCE TESTING REQUIRED. | | | CITY SPEC: | | | 08112.1(102) SUBMITTALS, DOORS | | | 082212.2.2(D/E) SUBMITTALS, SLIDING | | | GLASS DOORS | | | 08800.3(102C) SUBMITTALS, WINDOWS | | | IF GLAZED OPENINGS ARE NOT BE PART OF | | | THIS PERMIT WE SHALL REQUIRE A LETTER | | | FROM THE CONTRACTOR REQUESTING THIS. | | | A SEPERATE PERMITE FOR GLAZED OPENINGS | | | THEN WOULD BE PROVISOED WITH SEPERATE | | | APPLICATION ,REQUIREMENTS & FEES. | | | | | | DETAIL 7A/7.0 INDICATES 3/4" PLYWOOD | | | ROOF SHEATHING, VS SHEET S-3 INDICATES | | | 5/8" PLYWOOD. CORRECT DISCREPANCY. | | | | | | CONTRACTOR IS TO HAVE THE COUNTY ASSESS | | | PLANS FOR COUNTY IMPACT FEES.PLANS ARE | | | TO BE STAMPED & A COPY OF FEE RECEIPT | | | SUBMITTED TO CITY. | | | | | | PAY STATE TRAINING FEES TO CITY @ .01/ | | | SQ FT.#38.00. | | | | | | BUILDING PLAN REVIEW | | | JIM WITMER | | | (561) 659-8096X8412 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2001-05-02 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-05-02 |
Time |
09:10 |
Rev Time |
1.25 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-05-02 00:00:00 | BUILDING PLAN REVIEW | | | PLAN CHECK III | | | COLEMAN PARK | | | 1116 21ST STREET | | | PERMIT # 00120912 | | | | | | 1)- SBC 104.2.2. A DETAIL WILL BE | | | REQUIRED FOR THE WINDOW BUCK ATTACHMENT. | | | DETAILING WHAT TYPE OF ANCHOR IS TO BE | | | USED AND THE SPACING. | | | | | | 2)- SBC 1606.2.6.2. COMPONENTS &CLADDING | | | PRODUCT APPROVAL REPORTS WILL BE RE- | | | QUIRED FOR ALL GLAZED OPENINGS INCLUDING | | | WINDOWS & DOORS. THESE PRODUCT APPROVAL | | | REPORTS CAN BE A PROVISO THAT THE CON- | | | TRACTOR BRING THE REPORTS IN BEFORE THE | | | FRAMING INSPECTION. THE CITY ACCEPTS | | | S.B.C.C.I. REPORTS AS WELL AS DADE COUN- | | | TY PRODUCT APPROVAL. IT MUST BE NOTED IF | | | THE GLAZED OPENINGS HAVEN'T PASSED LARGE | | | MISSLE IMPACT RESISTANCE TESTING THEN | | | STORM SHUTTERS WILL BE REQUIRED. A SEPER | | | ATE PERMIT WITH FEES WILL BE REQUIRED AS | | | CITY POLICY. | | | | | | 3)-SBC 1505.3.2/ 1505.4.1.2. ROOFING | | | MATERIALS WILL REQUIRE PRODUCT TESTING | | | FOR 110 MPH. | | | | | | 4)- DETAIL 7A/7.0 SHOWS 3/4 " PLYWOOD | | | ROOF SHEATHING VS. SHEET S-3 INDICATES | | | 5/8 " PLYWOOD. | | | | | | 5)- THE INTERIOR LOBBY SHOWS A GWB | | | CEILING ATTACHED TO METAL STUD FRAMING, | | | THERE IS NO DETAIL SHOWING SPACING OF | | | FRAMING OR SIZE OF FRAMING. | | | | | | BUILDING PLAN REVIEW. | | | JIM WITMER | | | (561) 659- 8096 EX 8412 |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2001-02-13 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-02-13 |
Time |
12:03 |
Rev Time |
1.50 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-02-13 00:00:00 | SAME CHECKLIST AS BEFORE, NOTHING HAS | | | CHANGED!!!! |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2001-01-08 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2001-01-08 |
Time |
08:40 |
Rev Time |
3.00 |
| Received By |
jwitmer |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | BUILDING REVIEW: | | | 1)- FL ACCESSIBILITY CODE 4.6.3 ACCESS | | | AISLE SHALL BE DIAGONALLY STRIPED. | | | 2)- FL ACCESSIBILITY CODE 4.6.6 ACCESS | | | AISLES SHALL BE 5'X20' LEVEL WITH A | | | SURFACE SLOPE NOT EXCEEDING 1:50 OR 2% | | | IN ANY DIRECTION. | | | 3)- FL STATE STATUTE 481 PLANS ARE TO | | | BESIGNED, SSEALED & DATED. | | | 4).SBC 1804.2 SOILS TEST REPORT | | | REQUIRED. | | | 5)- 400.3ABCD.1.(2) ENERGY CALCULATIONS | | | SIGNED BY THE PERSON PREPARING THE COM- | | | PLIANCE CALCULATION AS A TRUE & ACCURATE | | | AND DEMONSTRATES THAT THE BUILDING IS IN | | | COMPLIANCE. | | | 6)- SBC 104.2.2 WINDOW BUCK ATTACHMENT | | | ADDITIONAL INFORMATION REQUIRED, DETAIL. | | | 7)- SBC 1606.2.6.2 COMPONENTS & CLADDING | | | WILL REQUIRE PRODUCT APPROVAL REPORTS | | | FOR ALL WINDOWS,EXTERIOR DOORS & ROOFING | | | MATERIALS. | | | 8)- WF-16 NOT IN FOOTING SCHEDULE SEE | | | S-1 DRAWINGS. | | | 9)- W8X21- NOT IN FOOTING SCHEDULE. | | | 10)- SBC 103.7.1- ALTERNATE METHODS, IN- | | | ITIAL CHEMICAL SOIL TREATMENT IN SIDE | | | FOUNDATION WALLS (BLOCK CELLS) SHALL | | | OCCUR AFTER ALL EXCAVATION, BACK FILLING | | | & COMPACTION.NOTE 103.7.1.3 CELLS & CAV- | | | ITIES IN MASONARY WALLS SHALL BE CLEANED | | | OF ALL TRASH / DEBRIS, WOOD SCRAPS OR | | | OTHER EXTANEOUS CONTENT BEFORE TTERMITE | | | TREATMENT. | | | 11)- SBC 103.7.3.5- ADDITIONAL CHEMICAL | | | TREATMENT SHALL BE APPLIED UNDER ALL | | | EXTERIOR CONCRETE ON GRADE WITHIN 1 FT. | | | OF THE PRIMARY STRUCTURE WALLS. | | | 12)-SBC 104.2.2- 2'X2' MASONARY COLUMNS | | | ARE NOT ON THE COLUMN SCHEDULE, STEEL | | | SIZE? A7.05 SHOWS ALL CELLS FILLED? | | | 13)-104.2.2- S-2 MEZANINE ADD. INFO.REQ. | | | AT TB-2 THE #4@8" O.C. 8'-6" LONG' IS | | | THERE ANY BOTTOM STEEL? | | | 14)-STORAGE/ JAN. RM.- ON THE WEST SIDE | | | OF THE OPENING IS THERE BOTTOM STEEL | | | REQUIRED IN THE MEZANINE SLAB OR TEMPER- | | | ATURE BARS? | | | 15)- TRUSS PLAN LAYOUT W/ DESIGN LOAD | | | INFORMATION FOR SBC 1606.1 OR ASCE 7-95. | | | WIND LOAD CONSISTANT WITH THE DESIGNER | | | OF RECORD ASSUMPTIONS. | | | 16)- DISCREPANCY- HIGH ROOF FRAMING PLAN | | | SHOWS A DROPPED RAKE BEAM. THE PLANS | | | SHOW A 2"X6"@3'-0" VS. DETAIL#5 INDICATE | | | THAT 2"X8"@ 4'-0" O.C. WILL BE USED?ALSO | | | CHECK THE MAX SPAN TABLES FOR 5/8" | | | PLYWOOD. | | | 17)- DETAILS 7/A7.0 SHOWS 3/4" PLYWOOD | | | ROOF SHEATHING VS. SHEET S.3 INDICATES | | | 5/8" PLYWOOD. | | | 18)- THE INTERIOR OF THE LOBBY SHOWS A | | | GWB CEILING OVER METAL STUD FRAMING, | | | THERE IS NO DETAIL SHOWING HOW THECEIL | | | ING IS TO BE FASTENED TO THE 3X12 & 4X12 | | | | | | BUILDING PLAN REVIEW | | | JIM WITMER | | | (561) 659-8096 EX 8412 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2001-11-26 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-11-26 |
Time |
19:42 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-11-26 |
Time |
19:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2001-02-21 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-02-21 |
Time |
12:27 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-02-21 |
Time |
12:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2001-01-08 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-01-08 |
Time |
17:21 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-01-08 |
Time |
17:21 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ****************UNSAT ****************** | | | | | | 1)NOTE: PLEASE SEE SHEET E2-0, CIRCUIT | | | A-19. PLEASE SHOW AS GFI OR IDENTIFIY | | | ON PANEL SCHEDULE AS GFI PROTECTED PER | | | 210-8. | | | | | | 2)NOTE: PLEASE PROVIDE INFORMATION ON | | | AIC RATING OF MAIN DISCONNECT PER 110-9. | | | | | | 3)NOTE:PLEASE NOTE PER 250-50 COLD | | | WATER BOND TO GROUNDING ELECTRODE SYSTEM | | | | | | 4)NOTE: PLANS SIGNED AND SEALED | | | PER FAC. 61G15-23.002 AND 471.25 | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS | | | PLEASE CALL. | | | | | | DEWEY PLAMER | | | ELECTRICAL PLAN REVIEW | | | 659-8096 EXT 8372 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
2 |
Status |
P |
Date |
2001-11-29 |
|
|
Cont ID |
|
| Sent By |
mamini |
Date |
2001-11-29 |
Time |
10:50 |
Rev Time |
2.00 |
| Received By |
mamini |
Date |
2001-11-29 |
Time |
10:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2001-01-05 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2001-01-05 |
Time |
10:13 |
Rev Time |
1.00 |
| Received By |
mgonzale |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | APPROVED WITH PROVISOS. | | | PLANS HAVE BEEN MARKED UP THROUGH | | | PUBLIC UTILITIES AND PROJECT | | | MANAGER RICHARD BOHRER HAS RECEIVED ALL | | | COMMENTS AS OF 1-4-2001. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2001-11-29 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-11-29 |
Time |
13:15 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-11-29 |
Time |
13:15 |
Sent To |
|
|
| Notes |
| 2001-11-29 00:00:00 | 1) THE CHAIN-LINK FENCE AROUND THE | | | BACKFLOW DEVICE IS NOT TO OBSTRUCT OR | | | INTERFERE WITH ACCESS OR USE TO THE | | | FIRE DEPARTMENT CONNECTION. | | | 2) THE FIRE LINE BACKFLOW DEVICE IS | | | TO BE EQUIPPED WITH TAMPER SWITCHES, | | | AND A CHAIN AND LOCK. | | | 3) FIRE SPRINKLER HEADS 103 AND 104 MUST | | | BE AT LEAST SIX FEET APART TO PREVENT | | | COLD SOLDERING FROM TAKING PLACE. | | | 4) ANY ROOM WHICH HAS AN OCCUPANT LOAD | | | OF 50 OR MORE PERSONS, DOOR(S) MUST | | | SWING IN THE DIRECTION OF EXIT TRAVEL. | | | | | | MIKE CARSILLO, CAPTAIN | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2001-02-14 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2001-02-14 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2001-02-14 |
Time |
13:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2000-12-29 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2000-12-29 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2000-12-29 |
Time |
14:46 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | 1) BUILDING ADDRESS NOT SHOWN ON | | | ELEVATION DRAWINGS. BUILDING ADDRESS | | | REQUIRED PER CITY CODE REQUIREMENTS. | | | 2) THE REGULATORY AREA OF THE PLANS | | | INDICATES THAT THE BUILDING WILL NOT | | | BE FIRE SPRINKLER PROTECTED. NOTED IN | | | THE PLANS WAS PAGE SP1.1 WHICH INDICATED | | | FIRE SPRINKLER PROTECTION. PLEASE | | | CORRECT DISCREPANCY. IF FIRE SPRINKLER | | | ARE TO BE PROVIDED, THEN HYDRAULIC | | | CALCULATIONS ARE TO BE PROVIDED WITH | | | PLANS. | | | 3) PLEASE PROVIDE COMPLETE FIRE ALARM | | | SYSTEM SHOP DRAWINGS FOR FIRE ALARM | | | EQUIPMENT SHOWN ON DRAWINGS.CUT SHEETS | | | ON DEVICES PLANNED FOR USE ARE REQUIRED. | | | ADDITIONAL FIRE ALARM DEVICES APPEAR | | | TO BE NEEDED. | | | 4) PLEASE PROVIDE INTERIOR FINISH | | | CLASSIFICATIONS. | | | 5) PLEASE PROVIDE MORE DETAILS ON KILN. | | | 6) DESCRIBE PURPOSE OF MEZZANINE. | | | 7) PLEASE INDICATE CONSTRUCTION OF | | | COVERED WALKWAY. IF COMBUSTIBLE AND OVER | | | FOUR FEET WIDE, FIRE SPRINKLERS WILL | | | BE REQUIRED. | | | | | | PLANS REVIEWED BY CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2001-12-05 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-12-05 |
Time |
15:28 |
Rev Time |
0.35 |
| Received By |
pkrauss |
Date |
2001-12-05 |
Time |
15:28 |
Sent To |
|
|
| Notes |
| 2001-12-05 00:00:00 | | | | PROVISO: | | | | | | FAN SHUTDOWN BY DUCT SMOKE DETECTOR | | | WITH NOTIFICATION TO ALARM/STROBE IN | | | NORMALLY OCCUPIED AREAS (NFPA 90A | | | 4-4.4.3). | | | | | | EMERGENCY DRAIN PAN SHALL HAVE OVERFLOW | | | PROTECTION BY MEANS OF AN APPROVED FLOAT | | | SWITCH OR A DRAIN TO A CONSPICUOUS | | | POINT. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT 659-8096 | | | EXT. 8388. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2001-03-02 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2001-03-02 |
Time |
13:11 |
Rev Time |
0.45 |
| Received By |
pkrauss |
Date |
2001-03-02 |
Time |
13:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2001-01-09 |
|
|
Cont ID |
|
| Sent By |
ndenmark |
Date |
2001-01-09 |
Time |
11:38 |
Rev Time |
0.50 |
| Received By |
ndenmark |
Date |
2001-01-09 |
Time |
11:38 |
Sent To |
|
|
| Notes |
| 2001-01-09 00:00:00 | ************DENIED********************** | | | | | | PROVIDE SIGNED AND SEALED DRAWINGS FOR | | | REVIEW AND STAMPING. INFORMATIONON | | | MECHANICAL IS OTHERWISE CODE COMPLIANT. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
5 |
Status |
P |
Date |
2002-01-24 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-01-24 |
Time |
17:53 |
Rev Time |
1.00 |
| Received By |
kstevens |
Date |
2002-01-24 |
Time |
17:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
F |
Date |
2002-01-23 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2002-01-23 |
Time |
14:01 |
Rev Time |
0.75 |
| Received By |
kstevens |
Date |
2002-01-22 |
Time |
19:08 |
Sent To |
|
|
| Notes |
| 2002-01-23 00:00:00 | DENIED | | | REFERENCE: SPC-94-FACBC-97 | | | | | | ALL COMMENTS FROM REVIEW DATED 12/03/01 | | | NOT ADDRESSED. | | | | | | 1) SHT C-3, DRINKING FOUNTAIN DETAIL, | | | SHT L-5 DETAIL I. HI/LOW DRINKING FOUNT- | | | AIN REQUIRED FOR HDCP SEC 4.15 AND FOR | | | THOSE WHO HAVE TROUBLE BENDING OR STOOP- | | | ING SEC 4.1.3(10). | | | 2) SHT A8.0, DETAIL 3/A8.0. SINKS TO | | | COMPLY WITH FACBC SEC 4.24. PLEASE SHOW | | | DETAILS OF ALL SUBSECTIONS OF THIS SEC. | | | 3) SHTS P1.0 & P2.0, FUNNEL FLOOR DRAIN | | | NOT APPROVED. FLOOR SINK WITH TRAP PRIM- | | | ER REQUIRED FOR ALL INDIRECT WASTE. SPC | | | SEC 804.5 | | | 4) SHTS P1.0 & P2.0, PLUMBING FIXTURE | | | SECHEDULE, PAN DRAIN & P/T TO DISCHARGE | | | TO OUTDOORS. WATER HEATER DETAIL SHOWS D | | | RAIN TO FLOOR DRAIN. PLEASE CLAIRFY. | | | 5) SHT P2.0, HVAC CONDENSATE RISER, RE | | | LIEF VENT REQUIRED TO 6" ABOVE GRADE. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2001-12-03 |
|
|
Cont ID |
|
| Sent By |
kstevens |
Date |
2001-12-03 |
Time |
15:03 |
Rev Time |
1.50 |
| Received By |
kstevens |
Date |
2001-12-03 |
Time |
15:03 |
Sent To |
|
|
| Notes |
| 2001-12-03 00:00:00 | DENIED | | | REFERENCE: SPC-94-FACBC-97 | | | | | | 1) SHT C-3, DRINKING FOUNTAIN DETAIL, | | | SHT L-5 DETAIL I. HI/LOW DRINKING FOUNT- | | | AIN REQUIRED FOR HDCP SEC 4.15 AND FOR | | | THOSE WHO HAVE TROUBLE BENDING OR STOOP- | | | ING SEC 4.1.3(10). | | | 2) SHT A8.0, DETAIL 3/A8.0. SINKS TO | | | COMPLY WITH FACBC SEC 4.24. PLEASE SHOW | | | DETAILS FOR ALL SUBSECTIONS OF THIS SEC. | | | 3) SHTS P1.0 & P2.O, FUNNEL FLOOR DRAIN | | | NOT APPROVED. FLOOR SINK WITH TRAP PRIM- | | | ER REQUIRED FOR ALL INDIRECT WASTE. SPC | | | SEC 804.5 | | | 4) SHTS P1.0 & P2.0, PLUMBING FIXTURE | | | SCHEDULE, PAN DRAIN & P-T TO DISCHARGE | | | TO OUTDOORS. WATER HEATER DETAIL SHOWS | | | DRAIN TO FLOOR DRAIN. PLEASE CLAIRFY. | | | 5) SHT P2.O, HVAC CONDENSATE RISER, RE- | | | LIEF VENT REQUIRED TO 6" ABOVE GRADE. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2001-03-02 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-03-02 |
Time |
12:12 |
Rev Time |
1.00 |
| Received By |
jleech |
Date |
2001-03-02 |
Time |
12:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2001-01-09 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-01-09 |
Time |
09:57 |
Rev Time |
2.50 |
| Received By |
jleech |
Date |
2001-01-09 |
Time |
09:57 |
Sent To |
|
|
| Notes |
| 2001-01-09 00:00:00 | DENIED; | | | | | | 1.PAGE R-1 SHOW RAIN SENSOR LOCATION. | | | | | | 2.PAGE P2.0 WATER HEATER DETAIL. PAN | | | DRAIN TO BE 1" 94 SPC 507.8.2. | | | | | | 3.RELIEF LINE TO BE PIPED SEPARATELY TO | | | TERMINATION POINT SPC507.8.4. | | | | | | 4.SANITARY RISER DIAGRAM.FLOOR DRAINS IN | | | PUBLIC BATHROOMS MUST BE 3" SPC | | | 409.4.1.1. | | | | | | 5.AIR CHAMBERS TO CAMPLY WITH 607.8.2. | | | | | | 6.PLUMBING FIXTURE SCHEDULE SHOWS FLUSH | | | VALVES. WATER RISERSHOWS 1/2" WATER TO | | | W/C FLUSH VALVES ARE MIM.3/4". | | | | | | 7.TWO FIXTURES ON COLD WATER ONLY. | | | COUNTY AMENDMENTS.97EDITION. | | | | | | 8.SHOW SQUIRE FOOTAGE CALCULATIONS AND | | | FIXTURE REQUIRED FOR MIMIMUM | | | FACILITIES. COMPLY TO TABLE 407 OF | | | 94 PLUMBING CODE. | | | | | | 9.SIZE HORIZONTAL AND VERTICAL RAIN | | | LEADERS USING TABLE 1108.1 AND 1108.2 | | | | | | 10.SHOW CONDENSATE PIPING. SIZE AND | | | DESTINATION. | | | | | | PLUMBING PLAN REVIEW BY; | | | JOHN LEECH | | | 659-8096 EXT. 8377 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2001-12-05 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2001-12-05 |
Time |
15:02 |
Rev Time |
0.25 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|