|
 |
 |
 |
 |
 |
Plan Review Details - Permit 00120608
| Plan Review Stops For Permit 00120608 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2000-12-28 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2000-12-28 |
Time |
09:20 |
Rev Time |
1.00 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PER WRS 12/28/00 LS |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2000-12-26 |
|
|
Cont ID |
|
| Sent By |
bstaples |
Date |
2000-12-26 |
Time |
10:28 |
Rev Time |
2.00 |
| Received By |
bstaples |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PHASE TWO (2) OF ROAD ONLY. | | | DEMOLITION, ELECTRICAL (STREET LIGHTS | | | ECT.) REQUIRE ADDITIONAL PERMITS. | | | ALL WORK IN PHASE 1 REQUIRES THAT A NEW | | | PERMIT BE APPLIED FOR AND ISSUED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
N |
Date |
2000-12-26 |
|
|
Cont ID |
|
| Sent By |
bstaples |
Date |
2000-12-26 |
Time |
10:33 |
Rev Time |
0.50 |
| Received By |
bstaples |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PLANS AND PERMITS MUST BE APPLIED FOR | | | AND ISSUED PRIOR TO START OF WORK. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2000-12-22 |
|
|
Cont ID |
|
| Sent By |
dlauderm |
Date |
2000-12-22 |
Time |
12:30 |
Rev Time |
0.00 |
| Received By |
dlauderm |
Date |
2000-12-22 |
Time |
12:34 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PASSED WITH PROVISOS: | | | PHASE ONE OF ROAD WILL NEED TO BE | | | RESUBMITTED AT A LOWER ROAD ELEVATION TO | | | HAVE A ONE FOOT DIFFERENCE BETWEEN | | | THE EXISTING BUILDINGS FLOOR ELEVATION | | | AND CROWN OF ROAD. | | | THE PHASE ONE WATER MAIN CAN NOT BE | | | INSTALLED UNTIL A FINAL ROAD ELEVATION | | | IS SET DUE TO THE REQUIRED COVER (36"). | | | CONSTRUCTION OF STORM AND SANITARY CAN | | | PROCEED IN PHASE ONE. | | | ROAD CONSTRUCTION CAN NOT BE BUILT (BOTH | | | PHASES) INCLUDING SIDEWALKS, CURBS AND | | | GUTTERS AND PAVED SECTIONS, UNTIL STREET | | | LIGHT PLAN HAS BEEN PERMITTED SO THE | | | UNDERGROUND WIRING CAN GO IN. | | | THE GREASE TRAP, STORMWATER LINES AND BA | | | RESTAURANT MUST BE PERMITTED SEPARATELY | | | UNDER THE CHINESE RESTAURANT'S ADDRESS. | | | THE SERVICES IN THE ROAD FOR THE CHINESE | | | RESTAURANT CAN BE CONSTRUCTED UNDER THIS | | | PERMIT. | | | CONSTRUCTION OF THE WATER AND SANITARY | | | SEWER SYSTEM CAN NOT START TILL THE | | | DEP/PBC HEALTH DEPARTMENT HAVE PERMITTED | | | THE PROJECT. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2000-12-21 |
|
|
Cont ID |
|
| Sent By |
mcarsill |
Date |
2000-12-21 |
Time |
09:28 |
Rev Time |
0.00 |
| Received By |
mcarsill |
Date |
2000-12-21 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | 1) FIRE HYDRANTS LOCATED ON EXECUTIVE | | | CENTER DRIVE EXTENSION SHALL NOT EXCEED | | | 500 FEET APART. | | | 2) THE EXECUTIVE CENTER DRIVE EXTENSION | | | IS TO BE A MINIMUM OF 20 FEET IN CLEAR | | | WIDTH. | | | | | | CAPTAIN MIKE CARSILLO | | | 659-8096,EXT.8497 | | | 835-2910 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2000-12-26 |
|
|
Cont ID |
|
| Sent By |
bstaples |
Date |
2000-12-26 |
Time |
10:36 |
Rev Time |
0.50 |
| Received By |
bstaples |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PLANS AND PERMITS MUST BE APPLIED FOR | | | AND ISSUED PRIOR TO START OF ANY WORK. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-12-26 |
|
|
Cont ID |
|
| Sent By |
bstaples |
Date |
2000-12-26 |
Time |
10:37 |
Rev Time |
0.50 |
| Received By |
bstaples |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | NO REVIEW REQUIRED FOR STREET | | | CONSTRUCTION AS PER SHIRLEY AND ANGELLA | | | 12/26/00. |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |