| Plan Review Stops For Permit 00110100 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2001-02-07 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-02-07 |
Time |
19:46 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-02-07 |
Time |
19:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2001-01-17 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-01-17 |
Time |
19:01 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-01-17 |
Time |
18:55 |
Sent To |
|
|
| Notes |
| 2001-01-17 00:00:00 | ****************** UNSAT ************** | | | | | | 1)NOTE: SAME NOTES AS FIRST REVIEW. NO | | | NEW ELECTRICAL PLANS WERE SUBMITTED. | | | WHEN NEW PLANS ARE SUBMITTED, PLEASE | | | TAKE OLD SHEETS OUT AND MAKE NEW SETS. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION AND | | | REVISED ELECTRICAL. IF THERE ARE ANY | | | QUESTIONS, PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW. | | | 659-8096 EXT 8372 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2000-11-20 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-11-20 |
Time |
19:19 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-11-20 |
Time |
19:19 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ***************** UNSAT *************** | | | | | | 1)NOTE: PLEASE SUBMIT AIC RATINGS FOR | | | ALL EQUIPMENT BEING INSTALLED. MAINS/ | | | PANEL ARE TO BE RATED FOR THE AVAIL- | | | ABLE FAULT CURRENT PER 110-9. | | | | | | 2)NOTE: PLEASE CORRELATE PANEL SCHEDULES | | | AND RISER. ONE SHOWS PANELS AS MLO AND | | | THE OTHER AS MCB. | | | | | | 3)NOTE: PLEASE INCLUDE BLDG STEEL AS | | | PART OF GROUNDING ELECTRODE SYSTEM | | | PER 250-50 | | | | | | 4)NOTE: PLEASE INCLUDE THE REQ`D DEDICAT | | | -ED BATH(S) CIRCUIT(S) PER 210-11-C-3 | | | #12 AND 20A. | | | | | | PLEASE SUBMIT ALL THE ABOVE INFORMATION | | | FOR REVIEW. IF THERE ARE ANY QUESTIONS | | | PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 561-659-8096 EXT 8372 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2000-11-14 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2000-12-01 |
Time |
09:51 |
Rev Time |
1.00 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PER JHL 11/14/00 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-11-14 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2000-12-01 |
Time |
09:52 |
Rev Time |
1.00 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | PER JHL 11/14/00 |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2001-02-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-02-26 |
Time |
14:54 |
Rev Time |
2.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-02-26 00:00:00 | PROVISO | | | | | | 1) PROVIDE KEY PLAN AND INSTALLATION | | | SCHEDULE,INDICATING SPECIFIC ANCHORS TO | | | BE USED,PRIOR TO INSTALLATION. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2001-01-24 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-01-24 |
Time |
10:07 |
Rev Time |
3.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-24 00:00:00 | DENIED | | | 1) IMPACT FEES MUST BE PAID TO PALM | | | BEACH COUNTY, PLANS STAMPED BY THEM AND | | | COPY OF RECEIPT SUBMITTED TO CITY OF | | | WEST PALM BEACH BUILDING DEPARTMENT, | | | BEFORE A BUILDING PERMIT CAN BE ISSUED. | | | | | | 2) PLEASE PROVIDE ADDITIONAL COPIES OF | | | DRAWINGS FOR BUTT GLASS,FIXED GLASS AND | | | STORM PANELS. THESE COPIES NEED NOT BE | | | SIGNED AND SEALED,ONLY ONE SET OF EACH | | | SUBMITTAL IS REQUIRED TO BE SIGNED AND | | | SEALED.HOWEVER, (2) COMPLETE SETS ARE | | | REQUIRED. ONE SET FOR PUBLIC RECORD AND | | | ONE FOR THE FIELD. | | | | | | 3) PROVIDE (2) CURRENT COPIES OF SBCCI | | | REPORT # 9808 FOR STORM PANELS. THE | | | PRODUCT APPROVALS THAT WERE SUBMITTED | | | ARE DRAFTS. | | | | | | 4) PROVIDE INFORMATION REQUIRED FOR | | | ELECTRICAL PERMIT. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2000-12-04 |
|
|
Cont ID |
|
| Sent By |
lsmith |
Date |
2000-12-01 |
Time |
09:53 |
Rev Time |
4.00 |
| Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | FAILED: FOR FOLLOWING | | | 1. NEED SIGNED & SEALED DESIGN | | | CERTIFICATION | | | 2. NEED PRODUCT APPROVALS FOR FOLLOWING: | | | A.ROOF MATERIALS | | | B.MULLIONS | | | C.ALL FIXED GLASS | | | D.FRONT DOOR | | | E.SHUTTERS | | | 3. INSTALLATION SCHEDULE & KEY PLAN FOR | | | SHUTTERS, IMPACT GLASS LOCATIONS. | | | 4. ENGINEERING FOR ALL BUTT GLASS OPEN- | | | INGS. | | | 5. PAY PBC IMPACT FEES SUBMIT PD REC. | | | ANY QUESTIONS PLEASE CALL LEA SMITH | | | 659-8096 EXT 8394 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-11-07 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2000-11-07 |
Time |
16:31 |
Rev Time |
0.25 |
| Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|