Plan Review Details - Permit 00101441
Plan Review Stops For Permit 00101441
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2001-01-30 Cont ID  
Sent By jwitmer Date 2001-01-30 Time 16:37 Rev Time 1.25
Received By jwitmer Date   Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2000-12-27 Cont ID  
Sent By jwitmer Date 2000-12-27 Time 09:53 Rev Time 3.00
Received By jwitmer Date   Time   Sent To  
Notes
2001-01-08 00:00:00BUILDING PLAN REVIEW:
 1): WEST PALM BEACH ADMINISTRATIVE CODE
 104.2.2 LOT 59 MODEL C, THE PLANS DETAIL
 A 2 STORY STRUCTURE WHILE THE SURVEY
 INDICATES A SINGLE STORY STRUCTURE,
 PLEASE CORRECT THE DISCREPANCY.
 2): 104.2.2 LOT 61 MODEL A,THE PLANS
 CALL FOR A SINGLE STORY WHILE THE SURVEY
 INDICATES A 2 STORY STRUCTURE, PLEASE
 CORRECT THE DISCREPANCY.
 THE BOUNDRY SURVEY ALSO HAS DISCREPAN-
 CIES WITH THE LOT 59 & 60.
 3): NOTE: THESE TOWNHOUSES ARE LOCATED
 IN A "AO" FLOOD ZONE, A FLOOD ZONE
 CERTIFICATE WILL BE REQUIRED BEFORE CO.
 4): LOT 59 MODEL "C" TABLE 600, REAR
 ELEVATIONS ALLOWABLE OPENINGS 56.00 S F
 ACTUALL OPENINGS SIZES 104.81 SQ. FT.
 SIDE ELEVATION ALLOWABLE OPENINGS 31.48'
 ACTUAL OPENINGS 72.00'.
 5); LOT 60 MODEL A-3 TABLE 600, REAR
 ELEVATION ALLOWABLE OPENINGS 56 SQ FT
 ACTUAL OPENING SIZE 115.08'.
 6): LOT 61 MODEL A-1 TABLE 600 REAR
 ELEVATION ALLOWABLE OPENINGS 56'-0"
 ACTUAL OPENING SIZE 115.08'
 7): LOT 62 MODEL A TABLE 600 REAR
 ELEVATION ALLOWABLE OPENINGS 56 SQ FT
 ACTUAL OPENING SIZE 115.08'.
 8): SOILS TEST REPORT NEEDS TO HAVE
 ENGINEERS SEAL SIGNED & DATED.
 9): GARAGE DOOR DESIGN PRESSURES LOW
 10):SEASON SHIELD 7000 SERIES HORIZONTAL
 SLIDING SERIES, PRODUCT APPROVAL REPORT
 EXPIRED 11/30/00.
 11):PRODUCT APPROVAL (NATIONAL CERTIFIED
 TESTING LABORATORIES) TESTING REPORTS
 DO NOT SHOW THAT THEY HAVE SBCCI
 APPROVAL OR DADE COUNTY APPROVAL.
 THEY HAVE AN APPROVED LAB. THE WINDOW
 MANUFACTURER WOULD NEED TO SUBMIT THE
 TEST RESULTS TO SBCCI FOR APPROVAL.THE
 OTHER METHOD OF APPROVAL IS WHEN
 PROFESSIONALLY DESIGNED & CERTIFIED TO
 MEET THE DESIGN LOADS & TEST CRITERIA,
 MAY BE APPROVED IN ACCORDANCE WITH 103.7
 ALTERNATE MATERIALS & METHODS, AND WILL
 NOT BE REQUIRED TO HAVE AN EVALUATION
 REPORT. THE ENGINEEROF THE WINDOW WOULD
 CERTIFY THAT THE WINDOW MEETS THE TEST-
 ING REQUIRMENTS FOR WIND LOADS. SITE
 SPECIFIC, THE ENGINEER IS TO SIGN & SEAL
 THE (PRODUCT APPROVAL FORM) IN THE
 CERTIFICATION BLOCK # 9. THE ARCHETECT
 OF RECORD REVIEWS THAT THE DESIGN LOADS
 CERTIFIED BY THE ENGINEER WILL WORK ON
 THIS SITE SPECIFIC CASE, SIGNS & SEALS
 IN BLOCK #10. ATTACHED IS A COPY OF THE
 PRODUCT APPROVAL SUBMITTAL WINDOW FORM.
 12):STORM SHUTTERS REQUIRE A KEY PLAN
 OR DIAGRAM THAT CORRELATES WITH THE
 INSTALATION SCHEDULE.
 13): MODDEL A-3 FIREPLACE SPECS & UL
 LISTING.
 14): DRAFTING 2305.2 S.B.C. SPECIFY
 MATERIALS & LOCATION.
 15): NOTE: BEFORE ERECTION OF TRUSSES
 HAVE TRUSS DRAWINGS REVIEWED BY ARCH. OF
 RECORD AND SIGNED/REVIEWED. THE TRUSS
 ENGINEER TO HAVE SIGNED / SEALED THE
 TRUSS DRAWINGS & LAYOUT.THERE IS TO BE
 ONLY ONE MEAN ROOF HEIGTH FOR THE ENTIRE
 BUIDING AS PER 1606.
 16):SPECIFY GLASS IN HAZORDOUS AREAS,
 SAFETY GLASS EG KITCHEN WINDOWS.
  
 BUILDING PLAN REVIEW
 JIM WITMER
 (561)659-8096 EX 8412
  
 PLEASE RETURN THE REVIEWED PAGES AFTER
 THE CORRECTIONS ARE COMPLETED, THIS WILL
 EXPEDITE THE REVIEW PROCESS, THANK YOU!

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2001-01-30 Cont ID  
Sent By dpalmer Date 2001-01-30 Time 17:08 Rev Time 0.00
Received By dpalmer Date 2001-01-30 Time 17:08 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2001-01-03 Cont ID  
Sent By dpalmer Date 2001-01-03 Time 16:39 Rev Time 0.00
Received By dpalmer Date 2001-01-03 Time 16:39 Sent To  
Notes
2001-01-08 00:00:00PLEASE SEE 00101433

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2000-12-28 Cont ID  
Sent By mcarsill Date 2000-12-28 Time 10:32 Rev Time 0.00
Received By mcarsill Date 2000-12-28 Time 10:32 Sent To  
Notes
2001-01-08 00:00:001) BUILDING ADDRESS REQUIRED FOR FIRE
 AND PARAMEDICAL RESPONSE.
 2) WET FIRE HYDRANTS ARE TO BE
 PRESENT PRIOR, DURING AND AFTER
 CONSTRUCTION.
  
 CAPTAIN MIKE CARSILLO
 659-8026,EXT.8497
 835-2910

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2001-01-03 Cont ID  
Sent By jleech Date 2001-01-03 Time 16:57 Rev Time 0.25
Received By jleech Date 2001-01-03 Time 16:57 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-01-03 Cont ID  
Sent By jleech Date 2001-01-03 Time 16:57 Rev Time 0.25
Received By jleech Date 2001-01-03 Time 16:57 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2001-01-31 Cont ID  
Sent By jwitmer Date 2001-01-31 Time 09:05 Rev Time 0.00
Received By jwitmer Date   Time   Sent To  
Notes
2001-01-31 00:00:00APPROVED S GRAHAM 1/11 (00101433)