| 2001-01-08 00:00:00 | ***************PROVISO****************** |
| | |
| | 1)ARCHITECT TO PROVIDE REVISED SHEET A-5 |
| | ROOF FRAMING PLAN WITH INDENTIFYING TAG |
| | MARKS WHICH CORRESPOND WITH TRUSS ANCHOR |
| | SCHEDULE ON SHEET A-4. CLEARLY SPECIFY |
| | THE CONNECTORS THAT ARE TO BE USED ON |
| | EACH SPECIFIC TRUSS OR GROUPS OF TRUSSES |
| | DRAWINGS MUST BE SUBMITTED AND APPROVED |
| | PRIOR TO POURING OF TIE BEAM. |
| | |
| | 2)PROVIDE ENGINEERED UPLIFT CALCULATIONS |
| | OR SPECIFY PRODUCT CODE AND MANUFACTURER |
| | FOR CONNECTORS DETAILED ON SHEET A-6 #S |
| | 12,13,14 & 15 PRIOR TO TIE BEAM POUR. |
| | |
| | 3)PROVIDE PRODUCT APPROVALS, KEY PLAN & |
| | INSTALLATION SCHEDULE FOR STORM PANELS |
| | UNDER A SEPARATE PERMIT. |
| | |
| | 4)PROVIDE ENGINEERING FOR BUTT GLASS |
| | ASSEMBLY PRIOR TO INSTALLATION. |
| | |
| | 5)PROVIDE 2 CURRENT COPIES OF METRO-DADE |
| | OR SBCCI PRODUCT APPROVALS FOR DOUBLE |
| | FRONT ENRTY DOORS WITH TRANSOM, FRENCH |
| | DOOR AT MASTER B.R. AND FLUSH METAL |
| | SWINGING DOOR AT GARAGE. |
| | |
| | 6)PRODUCT APPROVAL SUBMITTAL FORM FOR |
| | NORANDEX WINDOWS,MULLIONS,AND SLIDING |
| | GLASS DOORS MUST HAVE WET SIGNATURE,DATE |
| | AND IMPRESSION SEAL OF ENGINEER CERTIFY- |
| | ING THE PRODUCTS TO BE ACCEPTABLE. |