Plan Review Details - Permit 00100051
Plan Review Stops For Permit 00100051
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2001-02-09 Cont ID  
Sent By hpiskura Date 2001-02-09 Time 07:14 Rev Time 0.00
Received By hpiskura Date 2001-02-05 Time 11:26 Sent To  
Notes
2001-02-09 00:00:00SECOND PAID PLAN REVIEW.
 1.THE CODE ANALYSIS ON SHEET G1.01 IS
 INCORRECT.TYPE II CONSTRUCTION BY ITS
 DEFINITION IS PROTECTED.SEE SBC 604.
 2.THE STATED FIRE RATINGS ARE INCORRECT.
 SEE SBC TABLE 600. THE STATED HEIGHT
 AND AREA ARE INCORRECT.SEE SBC TABLE
 500.
 3. THE GLASS DOOR BETWEEN THE LOBBY AND
 THE GARAGE IS REQUIRED TO BE FIRE RATED.
 A ROLLING SHUTTER SYSTEM IS NOT AN
 ACCEPTABLE SUBSTITUTE FOR A MEANS OF
 EGRESS.SEE SBC 1012.4 #5 AND SBC
 1012.1.
 4. SHEET A27.6DESIGNATE THE SPECIFIC
 SIZING OF THE ELEVATOR SHAFT VENT.SEE
 SBC 3003.6 AND SBC 3001.1.
 5.SPECIFIC CONSTRUCTION DETIALS ARE
 NECESSARY FOR THE SUSPENDED STUCCO
 CEILING AND THE SUSPENDED FRAMING SHOWN
 ON SHEETS A6.01 AND A6.22 RESPECTIVELY.
 SEE SBC 104.2.1.
 6.THE STATEMENT ON SHEET A75.1
 "GLAZING SYSTEM TO MEET LOCAL CODE" IS
 NOT AN ACCEPTABLE SUBSTITUTE FOR
 SPECIFIC DESIGN INFORMATION.SEE THE
 ATTACHED POLICY AND PROCEDURE STATEMENT.
 7.THE STRUCTURAL SHEET S1.01 SHOWS
 OPENINGS ON THE SOUTH ELEVATION THAT
 ARE NOT ON THE ARCHITECTURAL PLANS.
 THE #2 STAIRS HAVE NOT BEEN REVISED ON
 THE STRUCTURAL PLANS.
 8.SHEET S7.01 DESIGN PARAMETERS CITE A
 BUILDING LESS THAN 60' IN HEIGHT.THIS
 BUILDING IS MORE TAHN 60' IN HEIGHT.
 PLEASE REVISE THE DESIGN CRITERIA
 ACCORDING AND DEMOMSTRATE THE CHANGES.
 9.SHEET A1.01.WHAT IS THE MEANING OF
 THE STATEMENT "DELUGE ENTRY SYSTEM
 W/SPRINKLER HEAD ON EACH SIDE @ 4'
 O.C."?
 10.THE ATRIUM.HOW DOES THE 5600 CFM
 FAN PROVIDE AN EXHAUST CAPACITY OF
 40,000 CFM AS REQUIRED BY SBC 414.4?
 WHERE DOES THE MAKEUP AIR COME FROM?
 HOW IS THE OTHER SPACE VENTING
 REQUIREMENT OF SBC 412.5 ACCOMPLISHED?
 11.SHEET AC1.O1.PLEASE PROVIDE
 DIMENSIONS ON THE SITE PLAN TO LOCATE
 THE BUILDING ON THE PROPERTY.
 12.SHEET A5.01.THE NOTE SAYS "OPEN
 AREA CALCULATED BASED ON SBC 411.3.2."
 WHICH METHOD WAS USED?! OR 2?THE
 NOTES "51% OPEN" IMPLIES METHOD 1 WHICH
 REQUIRES OPEN AREA FOR THE FULL LENGTH
 OF THE SIDE.THE PORTION BETWEEN GRID
 LINES C AND E ON THE REAR ELEVATION AND
 3 AND 4 ON THE RIGHT ELEVATION DO NOT
 APPEAR TO COMPLY WITH THIS.PLEASE
 PROVIDE INFORMATION SHOWING HOW THIS
 AREA OF THE CODE WILL BE COMPLIED WITH.
 SEE ALSO THE NOTES ON THE FIRST REVIEW
 COMMENTS RE IMPACT FEES, THRESHOLD
 BUILDING, ZONING, ETC.
  
 HAROLD PISKURA
 (561) 659-8096 X 8219

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2000-11-08 Cont ID  
Sent By hpiskura Date 2000-11-08 Time 10:53 Rev Time 0.00
Received By hpiskura Date 2000-11-03 Time 14:42 Sent To  
Notes
2001-01-08 00:00:00LETTER W/ APPLICATION

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2001-02-14 Cont ID  
Sent By dpalmer Date 2001-02-14 Time 19:12 Rev Time 0.00
Received By dpalmer Date 2001-02-14 Time 19:12 Sent To  
Notes
2001-02-14 00:00:00******************UNSAT ***************
  
 1)NOTE: PLEASE SUBMIT A LARGE SCALE
 DETAIL FOR FIRE PUMP/ AND EQUIPMENT
 LOCATION.
 2)NOTE: PLEASE SUBMIT LOAD CALCULATIONS
 PER 220 AND 215.
  
 3)NOTE: PLEASE NOTE INLINE DISCONNECTS
 REQ`D FROM GENERATOR TO ATS`S.
 225-31/225-32 AND 230-72 FOR GROUPING
 OF DISC.
  
 4)NOTE: PLEASE SHOW SIZE OF CONDUCTORS
 AND CONDUITS FROM ATS`S/DISC TO GEN.
  
 5)NOTE:PLEASE SHOW GROUNDING ELECTRODE
 SYSTE. PLANS SAY TO SEE DETAIL?
  
 6)NOTE: PLEASE PROVIDE CLARIFICATION FOR
 695-4-B-1. AND OCP FOR SIZING OF FIRE
 PUMP. AT 125%
  
 7)NOTE: PLEASE PROVIDE PANEL SCHEDULES
 SHOWN ON RISER DIAGRAMS IN BOTHSETS OF
 PLANS.
  
 JUST NOTE THAT SHUNT TRIPS ARE
 NOT RATED FOR MEANS OF DISCONNECTS PER
 230-76 AND 230-79
  
  
 PLEASE SUBMIT CLARIFICATION ON THE ABOVE
 INFORMATION FOR REVEIW. IF THERE ARE
 ANY QUESTIONS PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-11-02 Cont ID  
Sent By dpalmer Date 2000-11-02 Time 10:05 Rev Time 0.00
Received By dpalmer Date 2000-11-02 Time 10:05 Sent To  
Notes
2001-01-08 00:00:00**************** UNSAT *****************
  
 1)NOTE: PLAN REVIEW WAS SUBMITTED FOR
 A 3 STORY OFFICE/MEDICAL BLDG AND GARAGE
 BUT PLANS ONLY REFLECT GARAGE?????
  
 2)NOTE: PLEASE SUBMIT LOAD CALCULATIONS
 , GROUNDING ELECTRODE SYSTEM. ETC.
 215-5
  
 3)NOTE: PLEASE CLARIFY LOADS SHOWN ON
 PANEL SCHEDULES. ONE SHOWS CKT KW THE
 OTHER PHASE KW .?
  
 PLEASE SUBMIT THE ABOVE INFORMATION
 FOR REVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2000-11-02 Cont ID  
Sent By mgonzale Date 2000-11-02 Time 15:43 Rev Time 0.50
Received By mgonzale Date   Time   Sent To  
Notes
2001-01-08 00:00:00PLANS DO NOT INCLUDED CIVIL DRAWINGS

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2001-02-07 Cont ID  
Sent By mcarsill Date 2001-02-07 Time 13:57 Rev Time 0.00
Received By mcarsill Date 2001-02-07 Time 13:56 Sent To  
Notes
2001-02-07 00:00:001) CODE ANALYSIS BOX ON PAGE G1.01
 INDICATES A ONE HOUR FIRE SEPARATION
 BETWEEN THE OFFICE BUILDING AND PARKING
 STRUCTURE. PLAN REVIEW COMMENTS
 INDICATES A TWO HOUR FIRE SEPARATION.
 PLEASE CORRELATE INFORMATION.
 2) PLEASE INDICATE LOCATION OF FIRE
 DEPARTMENT CONNECTIONS. THESE DEVICES
 ARE TO BE LOCATED NO FARTHER 150 FEET
 FROM FIRE HYDRANTS.
 3) ONLY TWO EXITING FIRE HYDRANTS COULD
 BE LOCATED ON THE SURVEY. ADDITIONAL
 FIRE HYDRANTS APPEAR TO BE NEEDED. ALSO
 BE ADVISED THAT THE UTILITIES DEPARTMENT
 ARE TO REVIEW THE FIRE SPRINKLER PLANS
 AND UNDERGROUND UTILITIES PLANNED FOR
 THE SITE.
 4) PLEASE PROVIDE PRODUCT APPROVALS FOR
 TWO HOUR CONCEALED ROLL-UP SHUTTER AT
 DOOR ON PAGE A1.01.
 5) SEPARATE PERMIT REQUIRED FOR MEDICAL
 GAS SYSTEMS PLANNED FOR THE BUILDING.
 6) PLEASE EXPLAIN DELUGE FIRE SPRINKLER
 SYSTEM PLANNED FOR THE ENTRY SYSTEM ON
 PAGE A1.01.
 7) PLEASE PROVIDE MORE DETAILS ON
 GENERATOR.
 8) CABLE GUARDS TO COMPLY WITH LIFE
 SAFETY CODE REQUIREMENTS.
 9) THE ATRIUM TO COMPLY WITH NFPA 101,
 THE LIFE SAFETY CODE, 1985 EDITION,
 SECTION 6-2.2.3.5. PLEASE SHOW
 COMPLIANCE WITH ALL SECTIONS OF THIS
 CODE. PLEASE PROVIDE TETSING CRITERIA
 AND EXPECTED PERFORMANCE FOR THE
 ATRIUM.
  
 CAPTAIN MIKE CARSILLO
 659-8096,EXT.8497
 835-2910

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2000-10-06 Cont ID  
Sent By mcarsill Date 2000-10-06 Time 13:29 Rev Time 0.00
Received By mcarsill Date 2000-10-06 Time 13:29 Sent To  
Notes
2001-01-08 00:00:001) NO FIRE HYDRANTS SHOWN ON SITE PLAN.
 PLEASE INDICATE FIRE HYDRANT LOCATIONS
 ON SITE PLAN.
 2) BUILDING ADDRESS NOT SHOWN ON
 ELEVATION DRAWINGS. BUILDING ADDRESS
 TO BE INSTALLED IN ACCORDANCE WITH CITY
 CODE REQUIREMENTS.
 3) AN APPLICATION FOR A KNOX-BOX CAN
 BE RECEIVED FROM THE FIRE RESCUE
 DEPARTMENT.
 4) ELEVATORS TO COMPLY WITH ANSI A.17.1
 AND THE UNIFORM FIRE SAFETY RULES AND
 STANDARDS 4A-47. ELEVATORS ARE TO HAVE
 BOTH PHASE ONE AND PHASE TWO RECALL
 FUNCTIONS.
 5) NO FIRE SPRINKLER SYSTEM DRAWINGS
 OR HYDRAULIC CALCULATIONS PROVIDED FOR
 OFFICE BUILDING.
 6) NO OCCUPANT LOAD CALCULATIONS
 PROVIDED FOR LEASE SPACES.
 7) ADDITIONAL EXIT SIGNAGE IS NEEDED TO
 DIRECT PERSONS TO EXIT DOOR LOCATIONS.
 8) MECHANICAL ROOM DOORS (301) WHEN
 OPENED BLOCK EXIT DOOR.
 9) STAIRS TO COMPLY WITH NEW STAIRS,
 NFPA 101, THE LIFE SAFETY CODE, 1985
 EDITION.
 10) HANDRAILS AND GUARDS TO COMPLY WITH
 NFPA 101, THE LIFE SAFETY CODE, 1985
 EDITION.
 11) PLEASE INDICATE FIRE PROTECTION
 DETAILS FOR TOWER BETWEEN PARKING GARAGE
 AND OFFICE TOWER.
 12) PLEASE PROVIDE INTERIOR FINISH
 INFORMATION FOR EXITS AND OTHER AREAS OF
 THE OFFICE BUILDING.
  
 PARKING GARAGE
 1) NO FIRE SPRINKLER DRAWINGS OR
 HYDRAULIC CALCULATIONS PROVIDED WITH
 PLANS.
 2) NO FIRE STANDPIPE SYSTEM DRAWINGS
 INCLUDED WITH PLANS.
 3) PARKING GARAGE TO COMPLY WITH NFPA
 88, THE STANDARD FOR PARKING STRUCTURES
 AND NFPA 101, THE LIFE SAFETY CODE,
 1985 EDITION, SECTION 29.8, PARKING
 GARAGES.
 4) THE FIRE SPRINKLER AND FIRE ALARM
 SYSTEMS IN BOTH BUILDINGS ARE TO BE
 MONITORED BY A LICENSED UL LISTED
 CENTRAL STATION APPROVED BY THE FIRE
 RESCUE DEPARTMENT.
 5) PLEASE PROVIDE MORE DETAILS ON STEEL
 CABLE GUARDRAIL SYSTEM.
 6) CLEARLY IDENTIFY THE REQUIRED TWO
 MEANS OF EGRESS FROM EVERY LEVEL OF
 THE PARKING GARAGE.
 7) PROVIDE OCCUPANT LOAD CALCULATIONS
 FOR THE PARKING GARAGE.
 8) PLEASE PROVIDE INTERIOR FINISH
 INFORMATION FOR THE PARKING GARAGE.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2001-02-07 Cont ID  
Sent By ndenmark Date 2001-02-07 Time 12:50 Rev Time 2.00
Received By ndenmark Date 2001-02-07 Time 12:47 Sent To  
Notes
2001-02-07 00:00:00************DENIED**********************
 1. PLAN SHOWS 3 STORY ATRIUM. SHOW
 COMPLIANCE WITH 1997 SBC 414.4.2 "IN
 ATRIUMS 55FT OR LESS IN HEIGHT WITH A
 VOLUME OF 600,000 CU. FT. OR LESS, A
 SMOKE EXHAUST SYSTEM SHALL BE LOCATED
 AT THE CEILING OF THE ATRIUM. SUCH
 SYSTEMS SHALL EXHAUST 40,000 CFM.
 414.4.3 REQUIRES SUPPLY AIR INLETS
 PROVIDING 75% OF THE EXHAUST. THE
 INLETS MAY BE LOCATED AT THE LOWEST
 LEVEL OF THE ATRIUM.
 2. 414.8 REQUIRES SMOKE CONTROL IN ANY
 OCCUPIED SPACE THAT DOES NOT DIRECTLY
 OPEN INTO THE ATRIUM SHALL BE DESIGNED
 TO PROVIDE NATURAL OR MECHANICAL
 VENTILATION IN ACCORDANCE WITH SMC
 412.5. SHOW COMPLIANCE WITH THIS
 SECTION.
 3. PROVIDE SEQUENCE OF OPERATION FOR
 ATRRIUM SMOKE CONTROL SYSTEM.
 4. ALL SECTIONS OF 1997 SBC 414 THAT
 APPLY TO THIS BUILDING NEED TO HAVE
 COMPLIANCE INDICATED ON THE PLAN FOR
 REVIEW PURPOSES.
 5. PROVIDE DETAIL ON EXHAUST SYSTEM FOR
 THE ATRIUM (EF#5) INCLUDING SHAFT
 PROTECTION AND CFM TO COMPLY WITH NOTE
 1 ABOVE. NOTE PLAN SHOWS FIRE DAMPER AT
 OUTLET .ON M-1.03. IF CODE REQUIRES A
 FIRE DAMPER IN THIS LOCATION IT SHALL
 BE ABLE TO BE OVERRIDDEN FROM A FIRE
 PANEL TO ALLOW THE SMOKE CONTROL SYSTEM
 TO FUNCTION AS REQUIRED BY THE BUILDING
 CODE. PLEASE INDICATE COMPLIANCE WITH
 THIS IN THE SEQUENCE OF OPERATION.
 6. PROVIDE DETAIL FOR MECHANICAL ROOMS
 SHOWING MAUFACTURES REQUIRED CLEARANCE
 AREAS FOR COIL PULL, SERVICE ACCESS,
 ETC. 1997 SMC 304.2 REQUIRES
 ACCESSIBILITY OF ALL EQUIPMENT WITH
 RESPECT TO BUILDING CONSTRUCTION. THE
 NATIONAL ELECTRIC CODE HAS MINIMUM
 REQUIREMENTS WHICH WILL HAVE TO BE
 COMPLIED TO FOR THIS EQUIPMENT. CLEARLY
 SHOW THESE DEDICATED AREAS IN THE
 DETAIL.
 7. PROVIDE INFORMATION ON CONDENSATE
 DRAIN SYSTEM FOR AIR HANDLER EQUIPMENT
 AND OVERFLOW PER 1997 SMC 304.8
 8. PROVIDE INFORMATION FOR VENTILATION
 IN THE MECHANICAL AND MEDICAL GAS
 STORAGEROOMS ON THE FIRST LEVEL PARKING
 GARAGE.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2000-11-01 Cont ID  
Sent By ndenmark Date 2000-10-31 Time 12:02 Rev Time 5.00
Received By ndenmark Date 2000-10-31 Time 12:02 Sent To  
Notes
2001-01-08 00:00:00***********DENIED***********************
 1.MECHANICAL DRAWINGS ARE REQUIRED TO BE
 SIGNED AND SEALED BY THE ENGINEER OF
 RECORD. SUBMIT SIGNED ANS SEALED PLANS.
  
 2.SHAFTLOCATED BETWEEN ELEVATOR LOBBY
 AND STAIRS HAS SEVERAL DUCTS EXITING.
 ALL DUCTS PENETRATING SHAFT SHALL BE
  
 3.1997 SMC 610.1.2 REQUIRES FIRE DAMPERS
 TO BE LOCATED WHERE DUCTS PENETRATE ALL
 RATED WALLS AND PARTITIONS.
 SMC 610.6 REQUIRES LOCATION AND INSTALL-
 ATION DETAILS TO BE SHOWN AND PROPERLY
 IDENTIFIED ON BUILDINGS BY THE DESIGNER.
  
 4. MECH DUCTS ARE SHOWN RUNNING THROUGH
 ELECTRIC ROOM. NEC DOES NOT PERMIT
  
 5. IDENTIFY AHU CORE AS SHOWN ON M2.01
 LOCATION.
 6. LOCAL AMENDMENTS REQUIRE A MINIMUM OF
 18" CLEARANCE BETWEEN ROOF SURFACE AND
 BOTTOM OF SUPPORT STRUCTURE OF EQUIPMENT
 STAND.
  
 7. PROVIDE ELEVATION SHOWING SHAFT AND
 DUCT DETAIL INCLUDING LOCATION OF FIRE
 DAMPERS.
  
 8. PROVIDE OUTSIDE AIR SCHEDULE PER
 ASHRAE 62-89
  
 9. PROVIDE AIR BALANCE SCHEDULE SHOWING
 COMPLIANCE WITH 1997 SMC 501.2

Review Stop P PLUMBING
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2001-02-26 Cont ID  
Sent By jleech Date 2001-02-26 Time 13:53 Rev Time 6.00
Received By jleech Date 2001-02-26 Time 13:53 Sent To  
Notes
2001-02-26 00:00:00DENIED;
  
 1.BATHROOM FACILITIES ARE REQUIRED ON
 EACH FLOOR OF SHELL. 94 SPC SEC. 402
 (PUBLIC USE) AND 407.1.4.
 2.AHCA SHOULD BE INVALVED. THIS IS A
 MEDICAL BUILDING.
 3.P3.01 WASTE AND VENT RISER. MAIN VENT
 NOT TIED BACK INTO SANITARY DRAINAGE
 SYSTEM.
 4.FLOOR SINK REQUIRED FOR W/H ON 3RD FL.
 NOT SHOWN ON SANITARY RISER DIAGRAM.
 5.P3.01 FLOOR DRAINS REQUIRED IN 3RD FL.
 BATHROOMS.
 6.FLOOR DRAINS IN BATHROOMS MUST HAVE
 TRAP PRIMERS. TRAP PRIMERS ARE LISTED
 IN PROJECT MANUAL BUT NOT SHOWN ON
 PLANS.
 7.A2.01 2-M.TLC304 AND 303.DOOR SWING
 INFRINGES ON LAVITORYS CLEAR FLOOR
 SPACE. DOORS SHOULD SWING OUT. M AND K
 ALSO INFRINGES ON LAVITORY CLF. FACBC
 4.19.3 AND 4.17.5.
 8.FLUSH VALVES SHALL BE MOUNTED ON THE
 WIDE SIDE OF THE TOILET AREA. FACBC
 4.16.5
 9.P0.01 DELETE GAS CONNECTION DETAIL IF
 NO FUEL GAS WILL BE USED.
 10.P0.01 WATER HEATER DETAIL, CHANGE
 FLOOR DRAIN NOTATIONTO FLOOR SINK.
 11.IF NO MEDICAL GAS WILL BE INSTALLED
 IN SHELL ADD A NOTE TO THAT AFFECT.
 12.P3.01 SHOW LOCATION AND SIZE OF AIR-
 CHAMBER IN ACCORDANCE WITH SPC 607.8.
 2.
 13.FOR ROOF DRAIN CALCULATIONS FOLLOW 94
 SPC CHAPTER 11.ROOF AREA INCLUDES THE
 ROOF AND 1/2 OF THE PARAPET WALL,
 ALSO ROOF OVER MECHANICAL ROOM.PER.
 FIG.1108.4 RAIN IN THIS AREA IS BAST
 ON 4.5 INCHS OF RAIN PER HOUR.
 14.SHOW CHILL WATER SUPPLY LINE ON WATER
 RISER AND LOCATION IN MECH. ROOM.
 15.PARKING GARAGE. SHOW SQ. FT. AREA FOR
 EACH FLOOR DRAIN. SHOW ACCUMULATION
 OF AREA AS PIPES GO FROM 6TH FLOOR TO
 UNDERGROUND. A RISER DIAGRAM WOULD BE
 A GOOD WAY TO ACCOMPLISH THIS.
 16.NO WATER SHOWN IN GARAGE AREA. IS
 THIS TRUE?
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 659-8096 EXT.8377

Review Stop P PLUMBING
Rev No 1 Status F Date 2000-10-16 Cont ID  
Sent By tlarge Date 2000-10-16 Time 09:00 Rev Time 6.00
Received By tlarge Date 2000-10-15 Time 11:57 Sent To  
Notes
2001-01-08 00:00:001)SUBMIT COPY OF AHCA APPROVAL.SPC SEC.
 101.4.7.
  
 2)JOB SPEC.15430-PART 3.2-CALCULATED AIR
 CHAMBERS(IF USED)SHALL COMPLY W/STANDARD
 PDI-WH201
  
 3)JOB SPEC.15440-PART 1.1-PLUMBING
 FIXTURES SHALL BE WATER CONSERVATION
 TYPE PER SPC 406.
  
 4)SUBMIT OCCUPANT LOAD PER TABLE 407 OF
 THE SPC.SEE SPC SEC.407.1.3.FOR ALLOWED
 DEDUCTIBLE AREAS.COMPLY W/SPC TABLE 407
 FOR MIN.FIXTURE REQS.
  
 5)LAVATORIESARE REQD.INTHE
 HANDICAP STALLS PER FACBC SEC.4.17.3.
 SIZE OF STALL AND REQD.CLEAR FLOOR SPACE
 OF FIXTURES SHALL COMPLY W/FACBC SECS.
 4.17,FIG.30,4.19 AND FIG.32.
  
 6)SUBMIT SANITARY AND WATER ISOMETRICS
 FOR ALL PLUMBING WORK FOR THE SHELL
 BUILDING AND THE GARAGE.COUNTYWIDE
 AMENDMENTS TO SPC SEC.104.2.1.
  
 7)SUBMIT COMPLETE STORM RISER DIAGRAM
 FOR REVIEW.INCLUDE REQS.FOR SECONDARY
 DRAINAGE.COMPLY W/SPC SECS.1108.1 THRU
 1108.4,1109 AND APPENDIX "A".
  
 8)SUBMIT ROOF PLAN SHOWING ROOF DRAINS
 AND SHOW SQUARE FOOTAGE DRAINED BY EACH
 ROOF DRAIN.COMPLY W/SPC TABLES 1108.1,
 1108.2.INCLUDE 1/2 AREA OF PARAPET WALL.
  
 9)ALL TOILET ROOMS SHALL BE EQUIPPED W/
 FLOOR DRAINS PER SPC SEC.409.4.1.1.
  
 10)SUBMIT COMPLETE GAS DRAWING FOR
 REVIEW.COMPLY W/ATTACHED REQS.
  
 11)P&T DRAIN FROM WATER HEATER SHALL
 DRAIN TO FLOOR SINK.SPC SEC.807.1.3.
  
 12)VACUUM RELIEF LINE SHALL BE INSTALLED
 PER MANUF.RECOMMENDATIONS AND ANSI
 Z21.22.
  
 13)EWH SHALL BE READILY ACCESSIBLE PER
 SPC SEC.501.7.SUPPLY SHIP'S LADDER AND
 PLATFORM OR RELOCATE HEATER TO FLOOR.
  
 14)HEATER SHALL BE EQUIPPED W/PAN AND
 DRAIN PER COUNTYWIDE AMENDMENTS TO SPC
 SEC.507.8.1.
  
 15)SUBMIT COMPLETE SIGNED AND SEALED
 PLANS FOR THE MEDICAL GAS SYSTEM.
 COUNTYWIDE AMENDMENTS TO SPC SEC.104.2.3
  
 CALL 561-659-8096,EXT.8377 IF YOU HAVE
 QUESTIONS.
 TIMOTHY LARGE
 PLUMBING PLANS EXAMINER

Review Stop Z ZONING
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved