Plan Review Details - Permit 00091535
| Plan Review Stops For Permit 00091535 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2001-03-08 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-03-08 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-03-08 |
Time |
16:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-10-17 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-10-17 |
Time |
17:13 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-10-17 |
Time |
17:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2001-03-07 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-03-07 |
Time |
19:36 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-03-07 00:00:00 | NO A/C PLANS. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2000-10-14 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2000-10-14 |
Time |
12:33 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2000-10-14 |
Time |
12:32 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | NO A/C PLAN. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2001-03-07 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-03-07 |
Time |
19:37 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2001-03-07 |
Time |
19:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-10-10 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-10-10 |
Time |
19:38 |
Rev Time |
0.75 |
| Received By |
tlarge |
Date |
2000-10-10 |
Time |
19:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2001-03-23 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2001-03-23 |
Time |
08:47 |
Rev Time |
1.00 |
| Received By |
fknapp |
Date |
2001-03-23 |
Time |
08:46 |
Sent To |
|
|
| Notes |
| 2001-03-23 00:00:00 | | | | | | | REVISE PLANS NEED TO GO TO PBCO FOR | | | IMPACT REVIEW. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2000-11-20 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-11-20 |
Time |
10:46 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2000-11-20 |
Time |
10:46 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | *************BUILDING PROVISO*********** | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE 2 CURRENT COMPLETE COPIES OF | | | SBCCI OR METRO DADE PRODUCT APPROVALS | | | FOR: | | | ALL EXTERIOR DOORS BEING USED. | | | FRONT ENTRY DOOR SYSTEM | | | CABANA DOOR AND GARAGE ENTRY DOOR | | | OVERHEAD GARAGE DOORS | | | | | | ARCH TRANSOMS | | | | | | STORM PANEL INFORMATION FOR ALL NON | | | IMPACT GLASS UNDER SEPARATE PERMIT | | | | | | ROOF COVERING UNDER SEPARATE PERMIT | | | | | | PLEASE PROVIDE PRIOR TO INSTALLATION. | | | | | | 2)PROVIDE FLOOD ZONE ELEVATION | | | CERTIFICATE THAT SHOWS ELEVATION OF | | | LOWEST FLOOR 6" HIGHER THAN BASE FLOOD | | | ELEVATION. | | | | | | 3)PROVIDE MECHANICAL DRAWINGS WITH | | | MECHANICAL PERMIT APPLICATION. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2000-11-09 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-11-09 |
Time |
14:54 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2000-11-09 |
Time |
14:54 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | | | | **************BUILDING UNSAT************ | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE**2**CURRENT COMPLETE COPIES OF | | | SBCCI OR METRO DADE PRODUCT APPROVALS | | | FOR: | | | ALL EXTERIOR DOORS AND WINDOWS | | | MULLIONS | | | TRANSOMS | | | ROOF COVERING UNDER SEPARATE PERMIT | | | STORM PANELS FOR ALL NON IMPACT GLASS | | | | | | 2)PROVIDE COMPLETE ENERGY CALCULATIONS | | | WITH MANUEL J FORM AND OWNER/AGENT | | | SIGNATURE. | | | | | | 3)PROVIDE NOTES THAT REFERENCE 1997 SBC | | | SFBC NOT APPLICABLE ON PAGE T-1 | | | | | | 4)PROVIDE PNEUMATIC FASTENER LEGEND ON | | | A-6 THAT DOES NOT REFERENCE SFBC. | | | | | | 5)PROVIDE DETAILS FOR NEW FRONT DOORS. | | | | | | 6)PROVIDE FLOOD ZONE ELEVATION | | | CERTIFICATE. | | | | | | 7)PROVIDE SOIL REPORT. | | | | | | 8)PROVIDE DETAIL OF FRAMING SUPPORTING | | | AHU IN ATTIC. | | | | | | 9)PROVIDE RAISE SEAL AND SIGNATURE OF | | | ENGINEER ON BOTH COPIES OF 2 FLOOR | | | FRAMING PLAN. | | | | | | 10)PROVIDE DETAIL OF ATTIC VENTING WITH | | | CALCULATIONS THAT COMPLIES WITH SBC | | | 2309.7 | | | | | | 11)WALL SECTION ON PAGE D-1 SHOWS 4' | | | OF CONCRETE FOR FOOTING? REVISE | | | | | | 12)BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED, IMPACT FEES MUST BE PAID TO PALM | | | BEACH CO.,THE PERMIT PLANS STAMPED BY | | | THEM AND THE RECEIPT ATTACHED TO THE | | | PERMIT APPLICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-10-05 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-10-05 |
Time |
10:21 |
Rev Time |
0.15 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |