| Plan Review Stops For Permit 00080409 |
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2001-04-14 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-04-14 |
Time |
08:10 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2001-04-14 |
Time |
08:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2001-02-12 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-02-12 |
Time |
08:54 |
Rev Time |
1.00 |
| Received By |
jleech |
Date |
2001-02-12 |
Time |
08:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2001-01-03 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2001-01-03 |
Time |
07:42 |
Rev Time |
0.50 |
| Received By |
jleech |
Date |
2001-01-03 |
Time |
07:42 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | DENIED; | | | | | | 1.NEED MANUFACTORS SPECIFICATIONS FOR | | | GAS LIGHTS. | | | | | | 2.SHOW LONGEST RUN IN FEET. | | | | | | 3.LINE ONE HAS 16 LIGHTS NOT 14. | | | | | | 4.USE TABLE 305.4E TO SIZE PE PIPE. | | | | | | 5.FUTURE LOAD MUST BE LISTED FOR LINE | | | TWO SO PIPE SIZING WILL BE CORRECT | | | WHEN FUTURE APPL. ARE ADDED. | | | | | | 6.SIZE PIPE AT METER. | | | | | | 7.GALVANIZED PIPE TO BE USED ABOVE | | | GROUND. | | | | | | 8.IF GAS PIPE RUNS IN CONCRETE COLUMN | | | GAS PIPE MUST BE SLEAVED. | | | | | | GAS PLAN REVIEW BY; | | | JOHN LEECH | | | 659-8096 EXT. 8377 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-08-08 |
|
|