| Plan Review Stops For Permit 00080012 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2002-01-16 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-01-16 |
Time |
10:28 |
Rev Time |
0.50 |
| Received By |
btrobaug |
Date |
2002-01-16 |
Time |
09:53 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-08-01 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-08-01 |
Time |
19:09 |
Rev Time |
0.00 |
| Received By |
btrobaug |
Date |
2000-08-01 |
Time |
19:09 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | *************** PROVISO *************** | | | | | | 1)NOTE: PLEASE SUBMIT REVISED PANEL | | | SCHEDULE/LOAD CALCULATION. LIST THE REQ` | | | BATH(S) CIRCUIT PER 210-11-C-3 | | | | | | 2)NOTE: PLEASE NOTE ARTS: 210-52-C-1,2,3 | | | 4,5 OF NEC FOR KITCHEN REQ`MENTS OF | | | OUTLETS. | | | | | | 3)NOTE: PLEASE SHOW EXISTING SERVICE | | | SIZE. | | | | | | PLEASE SUBMIT ALL THE ABOVE INFORMATION | | | FOR REVIEW BEFORE ANY ROUGH ELECTRICAL | | | INSPECTION IS CALLED IN. IF THERE ARE | | | ANY QUESTIONS PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | CITY OF WEST PALM BEACH | | | 659-8096 EXT 8372 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2002-01-16 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2002-01-16 |
Time |
18:46 |
Rev Time |
0.33 |
| Received By |
pkrauss |
Date |
2002-01-16 |
Time |
18:46 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2001-03-08 |
|
|
Cont ID |
|
| Sent By |
btrobaug |
Date |
2002-01-16 |
Time |
10:29 |
Rev Time |
0.25 |
| Received By |
pkrauss |
Date |
2001-03-08 |
Time |
12:05 |
Sent To |
|
|
| Notes |
| 2001-03-08 00:00:00 | NOTE:NEW BATHROOM MUST COMPLY WITH | | | 1997 SMC 503.3.1, SHALL HAVE AN | | | OPERABLE WINDOW OR EXHAUST FAN. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2000-08-03 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-08-03 |
Time |
08:17 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-08-03 |
Time |
08:17 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | NO MECHANICAL PLANS SUBMITTED AT THIS | | | TIME FOR REVIEW, MECHANICAL CONTRACTOR | | | WILL APPLY FOR SEPERATE MECH. PERMIT. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2002-01-26 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2002-01-26 |
Time |
08:58 |
Rev Time |
1.00 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2002-01-26 00:00:00 | PROVISO: ON DWV ISOMETRIC, PER CODE. | | | SEPERATE PLANS & PERMIT FOR GAS. | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 7 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2001-10-31 |
|
|
Cont ID |
|
| Sent By |
pkrauss |
Date |
2002-01-22 |
Time |
12:21 |
Rev Time |
0.33 |
| Received By |
kstevens |
Date |
2001-10-31 |
Time |
09:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-08-02 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-08-02 |
Time |
09:13 |
Rev Time |
0.33 |
| Received By |
tlarge |
Date |
2000-08-02 |
Time |
09:13 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | SUBMIT SANITARY RISER PRIOR TO PLUMBING | | | INSPECTION. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
10 |
Status |
P |
Date |
2002-01-29 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2002-01-29 |
Time |
08:53 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
9 |
Status |
P |
Date |
2001-12-18 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-12-18 |
Time |
16:00 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
8 |
Status |
P |
Date |
2001-12-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-12-15 |
Time |
08:35 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-12-15 00:00:00 | OK WITH LETTER FROM ENGINEER.RM |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
7 |
Status |
F |
Date |
2001-12-12 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-12-12 |
Time |
09:25 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-12-12 00:00:00 | *************BUILDING UNSAT************* | | | | | | 1) PROVIDE ENGINEERING ANALYSIS OF WIND | | | AND GRAVITY LOADS FOR PROPOSED ROOF | | | OVERHANG EXTENSION. | | | | | | 2) INDICATE THE FRAMING CONNECTOR THAT | | | WILL BE USED TO ATTACH THE LOOKOUT | | | RAFTERS TO THE DOUBLE 2"X 12" JOIST/ | | | RAFTER. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)659-8096 EXT.8202 |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
6 |
Status |
P |
Date |
2001-12-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-12-03 |
Time |
12:36 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-12-03 00:00:00 | PROVISO | | | 1) EXTERIOR DOOR INSTALLATION MUST | | | COMPLY WITH REQUIREMENTS OF PRODUCT | | | APPROVAL. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
5 |
Status |
P |
Date |
2001-12-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-12-03 |
Time |
12:36 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
4 |
Status |
P |
Date |
2001-11-06 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-11-06 |
Time |
17:25 |
Rev Time |
1.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-11-13 00:00:00 | REVISION OK |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2001-11-03 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2001-11-03 |
Time |
09:21 |
Rev Time |
2.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-11-03 00:00:00 | *************BUILDING UNSAT************* | | | | | | 1) THE GLAZING IN THE RELOCATED BATHROOM | | | WINDOW IS REQUIRED TO BE SAFETY GLASS | | | PER 97 SBC SEC.2405.2.1 (3), WHEN | | | LOCATED WITHIN A 24-INCH RADIUS OF A | | | DOOR IN THE CLOSED POSITION. PLEASE | | | INDICATE ON PLANS. | | | | | | 2) PROVIDE MANUFACTURERS SPECIFICATIONS | | | FOR GLASS BLOCK (2 COPIES). PROVIDE (2) | | | DRAWINGS INDICATING STRUCTURAL DETAILS | | | OF GLASS BLOCK WALL INSTALLATIONS WHICH | | | SHOW STRUCTURAL SUPPORTS, JOINT | | | REINFORCEMENT, ETC. THE GLASS BLOCK | | | SHALL HAVE A MINIMUM THICKNESS OF 3" AT | | | THE MORTAR JOINT AND ALL THE MORTAR- | | | BEARING SURFACES SHALL BE TREATED FOR | | | MORTAR BONDING. 97SBC SEC.2112. WHEN | | | INSTALLED IN HAZARDOUS LOCATIONS GLASS | | | BLOCK IS REQUIRED TO HAVE A UNIFORM FACE | | | THICKNESS OF 0.25 INCH PER 97SBC SECTION | | | 2405.2.2 (5). PLEASE INDICATE SPECIFIC | | | TYPE OF GLASS BLOCK THAT IS TO BE | | | INSTALLED. | | | | | | ROBERT MCDOUGAL | | | BLDG. PLAN REVIEW | | | (561)659-8096 EXT.8202 |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2001-03-08 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2001-03-08 |
Time |
12:54 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2001-03-08 |
Time |
12:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2000-09-13 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-09-13 |
Time |
12:13 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2000-09-13 |
Time |
12:09 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | | | | *************BUILDING UNSAT************* | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE 2 COMPLETE CURRENT COPIES OF | | | SBCCI OR METRO DADE PRODUCT APPROVALS | | | FOR: | | | A)ALL NEW EXTERIOR DOORS AND WINDOWS | | | B)ROOF COVERING UNDER SEPARATE | | | C)STORM PANELS INFORMATION WITH | | | INSTALLATION SCHEDULE AND KEY PLAN | | | WITH SPECIFIC ANCHORS TO BE USED | | | | | | 2)PROVIDE SOIL REPORT | | | | | | 3)PROVIDE RAISE SEAL OF ENGINEER ON | | | SHEETS THAT ENGINEERS NAME IS ON | | | | | | 4)PROVIDE REVISED PLANS TO COMPLY WITH | | | 1997 SBC TABLE 600 FOR OPENINGS ON NORTH | | | WALL OF BUILDING | | | | | | 5)PROVIDE ENERGY CALCULATIONS | | | | | | 6)PROVIDE DESIGN CERTIFICATION FOR | | | BUILDING CODE COMPLIANCE | | | | | | 7)PROVIDE WINDOW AND DOOR BUCK | | | CONNECTION DETAILS FOR WINDLOAD | | | RESISTANCE 1997 SBC 1606 | | | | | | 8)PROVIDE FLOOD ZONE ELEVATION | | | CERTIFICATE WITH FINISH FLOOR ELEVATION | | | OF ADDITION MIN 7.5' OR GREATER | | | | | | 9)BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED, IMPACT FEES MUST BE PAID TO PALM | | | BEACH CO., THE PERMIT PLANS STAMPED BY | | | THEM AND THE RECEIPT ATTACHED TO THE | | | PERMIT APPLICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-08-15 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-08-15 |
Time |
09:12 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|