| Plan Review Stops For Permit 00071468 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2001-02-05 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2001-02-05 |
Time |
17:07 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2001-02-05 |
Time |
17:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2000-12-11 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-12-11 |
Time |
16:28 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-12-11 |
Time |
16:28 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ****************** UNSAT *************** | | | | | | 1)NOTE: PLEASE SUBMIT THE AIC RATING | | | FOR ALL EQUIPMENT AS ASKED FOR ON THE | | | PREVIOUS REVIEW. MAIN/ PANEL/ BRKRS ARE | | | ALL TO BE RATED FOR THE AVAILABLE FAULT | | | CURRENT. | | | | | | 2)NOTE: PER F.A.C. ALL CHANGES ON PLANS | | | ARE TO BE SIGNED AND DATED BY THE ENGIN- | | | -EER OF RECORD. | | | | | | 3)NOTE: PLEASE NOTE THAT UNDER THE F.A.C | | | 61G15-23.002 PLANS MUST CONTAIN THE | | | TITLE BLOCK OF ENGINEER OF RECORD. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION | | | FORREVIEW. IF THERE ARE ANY QUESTIONS | | | PLEASE CALL. | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW | | | 659-8096 EXT 8372 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2000-08-31 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-08-31 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-08-31 |
Time |
14:30 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | *************** UNSAT **************** | | | | | | 1)NOTE: | | | | | | | | | | | | 2)NOTE: PLEASE SUBMIT AIC RATING OF | | | EQUIPMENT MAINS. MAINS/PANELS ARE TO BE | | | RATED FOR THE AVAILBLE FAULT CURRENT. | | | PER 110-9/215-5 | | | | | | 3)NOTE: GFI OUTLET REQ`D FOR A/C CU. | | | | | | 4)NOTE: PLEASE ADD SD PER NFPA-72 2-2.1. | | | 1.1. | | | | | | 5)NOTE: PLEASE ADD BATH CIRCUIT PER | | | 210-11-C-3../215-5 | | | | | | PLEASE SUBMIT ALL THE INFORMATION FOR | | | REVIEW. IF THERE ARE ANY QUESTIONS | | | PLEASE CALL. | | | | | | | | | DEWEY PALMER | | | ELECTRICAL PLAN REVIEW. | | | 659-8096 EXT 8372 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2000-12-12 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2000-12-12 |
Time |
19:01 |
Rev Time |
0.33 |
| Received By |
jleech |
Date |
2000-12-12 |
Time |
19:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
N |
Date |
2000-08-30 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2000-08-30 |
Time |
17:04 |
Rev Time |
0.25 |
| Received By |
jleech |
Date |
2000-08-30 |
Time |
17:04 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | A/C DRAWING NOT WITH DRAWINGS. | | | A/C CONTRACTOR TO SUBMIT PLANS WITH | | | APPLICATION. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-08-02 |
|
|
Cont ID |
|
| Sent By |
pschmitz |
Date |
2000-08-02 |
Time |
15:12 |
Rev Time |
0.50 |
| Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2001-02-07 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2001-02-07 |
Time |
11:22 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2001-02-07 |
Time |
11:22 |
Sent To |
|
|
| Notes |
| 2001-02-07 00:00:00 | | | | | | | ************BUILDING PROVISO************ | | | | | | SBC 104.2.2 | | | | | | 1) PROVIDE STORM PANEL INFORMATION WITH | | | INSTALLATION SCHEDULE AND KEY PLAN WITH | | | SPECIFIC ANCHORS AND MOUNTING TO BE USED | | | FOR ALL NON-IMPACT GLAZING. | | | | | | 2) PROVIDE 2 CURRENT COMPLETE COPIES OF | | | SBCCI OR METRO DADE PRODUCT APPROVALS | | | FOR ALL NEW WINDOWS. | | | | | | PLEASE SUBMIT PRIOR TO INSTALLATION. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2000-12-14 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-12-14 |
Time |
12:48 |
Rev Time |
2.00 |
| Received By |
fknapp |
Date |
2000-12-14 |
Time |
12:48 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | SEE ORIGINAL NOTES |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2000-09-12 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-09-12 |
Time |
14:31 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2000-09-12 |
Time |
14:31 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | | | | ************BUILDING UNSAT************** | | | | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE 2 CURRENT COMPLETE COPIES OF | | | SBCCI OR METRO DADE PRODUCT APPROVALS | | | FOR: | | | ALL EXTERIOR DOORS AND WINDOWS | | | ROOF COVERING | | | STORM PANEL WITH INSTALLATION | | | SCHEDULE AND KEY PLAN WITH SPECIFIC | | | ANCHORS TO BE USED | | | | | | 2)PROVIDE ELEVATIONS THAT SHOW EXISTING | | | OPENINGS TO CALCULATE SBC TBL 600 | | | | | | 3)PROVIDE 2 CURRENT SURVEYS | | | | | | 4)PROVIDE ENERGY CALCULATIONS FOR | | | ADDITIONS OVER 600 SQUARE FEET | | | | | | 5)PROVIDE WINDOW AND DOOR BUCK | | | CONNECTION DETAILS FOR WINDLOAD | | | RESISTANCE 1997 SBC 1606 | | | | | | 6)PROVIDE MECHANICAL PLANS WITH | | | MECHANICAL PERMIT APPLICATION | | | | | | 7)PROVIDE DETAILS OF CONNECTION OF NEW | | | CBS WALLS TO EXISTING WALLS | | | | | | 8)BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED,IMPACT FEES MUST BE PAID TO PALM | | | BEACH CO., THE PERMIT PLANS STAMPED BY | | | THEM AND THE RECEIPT ATTACHED TO THE | | | PERMIT APPLICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-08-10 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-08-10 |
Time |
08:32 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|