Plan Review Details - Permit 00071468
Plan Review Stops For Permit 00071468
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2001-02-05 Cont ID  
Sent By dpalmer Date 2001-02-05 Time 17:07 Rev Time 0.00
Received By dpalmer Date 2001-02-05 Time 17:07 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2000-12-11 Cont ID  
Sent By dpalmer Date 2000-12-11 Time 16:28 Rev Time 0.00
Received By dpalmer Date 2000-12-11 Time 16:28 Sent To  
Notes
2001-01-08 00:00:00****************** UNSAT ***************
  
 1)NOTE: PLEASE SUBMIT THE AIC RATING
 FOR ALL EQUIPMENT AS ASKED FOR ON THE
 PREVIOUS REVIEW. MAIN/ PANEL/ BRKRS ARE
 ALL TO BE RATED FOR THE AVAILABLE FAULT
 CURRENT.
  
 2)NOTE: PER F.A.C. ALL CHANGES ON PLANS
 ARE TO BE SIGNED AND DATED BY THE ENGIN-
 -EER OF RECORD.
  
 3)NOTE: PLEASE NOTE THAT UNDER THE F.A.C
 61G15-23.002 PLANS MUST CONTAIN THE
 TITLE BLOCK OF ENGINEER OF RECORD.
  
 PLEASE SUBMIT THE ABOVE INFORMATION
 FORREVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-08-31 Cont ID  
Sent By dpalmer Date 2000-08-31 Time 14:30 Rev Time 0.00
Received By dpalmer Date 2000-08-31 Time 14:30 Sent To  
Notes
2001-01-08 00:00:00*************** UNSAT ****************
  
 1)NOTE:
  
  
  
 2)NOTE: PLEASE SUBMIT AIC RATING OF
 EQUIPMENT MAINS. MAINS/PANELS ARE TO BE
 RATED FOR THE AVAILBLE FAULT CURRENT.
 PER 110-9/215-5
  
 3)NOTE: GFI OUTLET REQ`D FOR A/C CU.
  
 4)NOTE: PLEASE ADD SD PER NFPA-72 2-2.1.
 1.1.
  
 5)NOTE: PLEASE ADD BATH CIRCUIT PER
 210-11-C-3../215-5
  
 PLEASE SUBMIT ALL THE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW.
 659-8096 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-12-12 Cont ID  
Sent By jleech Date 2000-12-12 Time 19:01 Rev Time 0.33
Received By jleech Date 2000-12-12 Time 19:01 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2000-08-30 Cont ID  
Sent By jleech Date 2000-08-30 Time 17:04 Rev Time 0.25
Received By jleech Date 2000-08-30 Time 17:04 Sent To  
Notes
2001-01-08 00:00:00A/C DRAWING NOT WITH DRAWINGS.
 A/C CONTRACTOR TO SUBMIT PLANS WITH
 APPLICATION.

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-08-02 Cont ID  
Sent By pschmitz Date 2000-08-02 Time 15:12 Rev Time 0.50
Received By pschmitz Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2001-02-07 Cont ID  
Sent By fknapp Date 2001-02-07 Time 11:22 Rev Time 4.00
Received By fknapp Date 2001-02-07 Time 11:22 Sent To  
Notes
2001-02-07 00:00:00 
  
 ************BUILDING PROVISO************
  
 SBC 104.2.2
  
 1) PROVIDE STORM PANEL INFORMATION WITH
 INSTALLATION SCHEDULE AND KEY PLAN WITH
 SPECIFIC ANCHORS AND MOUNTING TO BE USED
 FOR ALL NON-IMPACT GLAZING.
  
 2) PROVIDE 2 CURRENT COMPLETE COPIES OF
 SBCCI OR METRO DADE PRODUCT APPROVALS
 FOR ALL NEW WINDOWS.
  
 PLEASE SUBMIT PRIOR TO INSTALLATION.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2000-12-14 Cont ID  
Sent By fknapp Date 2000-12-14 Time 12:48 Rev Time 2.00
Received By fknapp Date 2000-12-14 Time 12:48 Sent To  
Notes
2001-01-08 00:00:00SEE ORIGINAL NOTES

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-09-12 Cont ID  
Sent By fknapp Date 2000-09-12 Time 14:31 Rev Time 4.00
Received By fknapp Date 2000-09-12 Time 14:31 Sent To  
Notes
2001-01-08 00:00:00 
  
 ************BUILDING UNSAT**************
  
  
 SBC 104.2.2
  
 1)PROVIDE 2 CURRENT COMPLETE COPIES OF
 SBCCI OR METRO DADE PRODUCT APPROVALS
 FOR:
 ALL EXTERIOR DOORS AND WINDOWS
 ROOF COVERING
 STORM PANEL WITH INSTALLATION
 SCHEDULE AND KEY PLAN WITH SPECIFIC
 ANCHORS TO BE USED
  
 2)PROVIDE ELEVATIONS THAT SHOW EXISTING
 OPENINGS TO CALCULATE SBC TBL 600
  
 3)PROVIDE 2 CURRENT SURVEYS
  
 4)PROVIDE ENERGY CALCULATIONS FOR
 ADDITIONS OVER 600 SQUARE FEET
  
 5)PROVIDE WINDOW AND DOOR BUCK
 CONNECTION DETAILS FOR WINDLOAD
 RESISTANCE 1997 SBC 1606
  
 6)PROVIDE MECHANICAL PLANS WITH
 MECHANICAL PERMIT APPLICATION
  
 7)PROVIDE DETAILS OF CONNECTION OF NEW
 CBS WALLS TO EXISTING WALLS
  
 8)BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED,IMPACT FEES MUST BE PAID TO PALM
 BEACH CO., THE PERMIT PLANS STAMPED BY
 THEM AND THE RECEIPT ATTACHED TO THE
 PERMIT APPLICATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-08-10 Cont ID  
Sent By gjoyce Date 2000-08-10 Time 08:32 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***