Plan Review Details - Permit 00071327
Plan Review Stops For Permit 00071327
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2002-02-21 Cont ID  
Sent By dpalmer Date 2002-02-21 Time 14:27 Rev Time 0.00
Received By dpalmer Date 2002-02-21 Time 14:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2001-09-17 Cont ID  
Sent By dpalmer Date 2001-09-17 Time 18:51 Rev Time 0.00
Received By dpalmer Date 2001-09-17 Time 18:51 Sent To  
Notes
2001-09-17 00:00:00************** UNSAT ******************
  
 1)NOTE: PLEASE NOTE THAT NOTES FROM
 ORIGINAL PLAN REVIEW WERE NOT ADDRESSED
 FROM 9/25/00.
  
 PLEASE SEE ORIGINAL NOTES, AND SUBMIT
 FOR REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-09-25 Cont ID  
Sent By dpalmer Date 2000-09-25 Time 16:47 Rev Time 0.00
Received By dpalmer Date 2000-09-25 Time 16:47 Sent To  
Notes
2001-01-08 00:00:00***************** PROVISO **************
  
 1)NOTE: PLEASE PROVIDE AIC RATINGS
 OF ALL NEW EQUIPMENT BEING INSTALLED.
 MAINS/PANELS/BREAKERS. MUST BE RATED FOR
 THE AVAILABLE FAULT CURRENT PER 110-9
 215-5.
  
 2)NOTE: PLEASE SUBMIT COMPLETED PANEL
 SCHEDULE. 215-5
  
 3)NOTE: PLEASE NOTE 210-11-C-3 FOR THE
 REQ`D BATH(S) CIRCUIT(S). PLEASE LIST ON
 PANEL SCHEDULE.
  
  
 PLEASE SUBMIT ALL THE ABOVE INFORMATION
 FOR REVIEW BEFORE FINAL ELECTRICAL
 INSPECTION IS CALLED IN. IF THERE ARE
 ANY QUESTIONS PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-09-20 Cont ID  
Sent By jleech Date 2000-09-20 Time 16:44 Rev Time 0.33
Received By jleech Date 2000-09-20 Time 16:44 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-09-23 Cont ID  
Sent By pschmitz Date 2000-09-23 Time 09:57 Rev Time 0.75
Received By pschmitz Date   Time   Sent To  
Notes
2001-01-08 00:00:00PROVISO: SEE SHT P-1.
 SEPERATE PERMIT FOR PLBG.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2000-10-20 Cont ID  
Sent By fknapp Date 2000-10-20 Time 15:41 Rev Time 2.00
Received By fknapp Date 2000-10-20 Time 11:44 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-10-10 Cont ID  
Sent By fknapp Date 2000-10-10 Time 13:25 Rev Time 4.00
Received By fknapp Date 2000-10-05 Time 11:40 Sent To  
Notes
2001-01-08 00:00:00 
  
  
 ***********BUILDING UNSAT***************
  
 SBC 104.2.2
  
 1)PROVIDE 2 CURRENT COMPLETE COPIES OF
 METRO DADE OR SBCCI PRODUCT APPROVALS
 FOR:
 ALL NEW EXTERIOR DOORS AND WINDOWS
 GLASS BLOCK
 ROOF COVERING
 STORM PANEL WITH INSTALLATION
 SCHEDULE AND KEY PLAN WITH SPECIFIC
 ANCHORS TO BE USED
  
 2)PROVIDE DESIGN COMPLIANCE FORM FOR
 BUILDING CODE CONSTRUCTION
  
 3)PROVIDE ENERGY CALCULATIONS WITH
 MANUEL J FORM
  
 4)DESIGN DATA NOTE #9 ON SHEET S-5
 SHOULD REFERENCE SBC 1997
  
 5)BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED,IMPACT FEES MUST BE PAID TO PALM
 BEACH CO.,THE PERMIT PLANS STAMPED BY
 THEM AND THE RECEIPT ATTACHED TO THE
 PERMIT APPLICATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-09-19 Cont ID  
Sent By gjoyce Date 2000-08-03 Time 09:49 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***