Plan Review Details - Permit 00061369
Plan Review Stops For Permit 00061369
Review Stop B BUILDING (STRUCTURAL)
Rev No 8 Status P Date 2001-01-30 Cont ID  
Sent By hpiskura Date 2001-01-30 Time 13:58 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2001-01-30 00:00:00REVIEWED FOR THREE COMMENTS ON PREVIOUS
 LIST ONLY.

Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status F Date 2000-12-29 Cont ID  
Sent By bstaples Date 2000-12-29 Time 09:27 Rev Time 2.00
Received By bstaples Date   Time   Sent To  
Notes
2001-01-08 00:00:00REVISIONS SUBMITTED 12/13/00
 DENIED FOR THE FOLLOWING REASONS
  
 1. ENERGY SHEETS NOT SIGNED BY OWNER
 AGENT 2ND REQUEST
 2. SHEET A2.1 HANDRAILS MUST COMPLY WITH
 FLORIDA ACCESSABILITY CODE SEE FIGURE 19
 1997 EDITION. 2ND REQUEST
 3. SHEET A4.2 NOTE #5 INDICATES A 1 HOUR
 FIRE SEPERATION WHERE A 2 HOUR IS
 REQUIRED. 2ND REQUEST

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2000-12-14 Cont ID  
Sent By bstaples Date 2000-12-14 Time 12:53 Rev Time 2.00
Received By bstaples Date   Time   Sent To  
Notes
2001-01-08 00:00:00REVIEW OF REVISION DATED 12/14/00
 1. FLORIDA ENERGY SHEETS NOT SIGNED BY
 OWNER/AGENT
 2. HAND RAILS AT STAIRS TO NOT MEET
 FLORIDA ACCESSABILITY CODE SEE PAGE 99
 HAND RAIL EXTENSIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2000-09-20 Cont ID  
Sent By drunnels Date 2000-09-20 Time 14:37 Rev Time 0.00
Received By dpalmer Date 2000-09-28 Time 15:15 Sent To  
Notes
2001-01-08 00:00:00REVISION SUBMITED 9/14/00 APPROVED
 BZ#172235

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2000-09-08 Cont ID  
Sent By drunnels Date 2000-09-08 Time 11:58 Rev Time 1.00
Received By drunnels Date 2000-09-08 Time 11:58 Sent To  
Notes
2001-01-08 00:00:00*************** PROVISO ***************
 SUBMIT FLORIDA ENERGY SHEETS

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2000-09-06 Cont ID  
Sent By drunnels Date 2000-09-06 Time 10:55 Rev Time 1.00
Received By drunnels Date 2000-09-06 Time 10:55 Sent To  
Notes
2001-01-08 00:00:001.PROVIDE FLORIDA ENERGY SHEETS SIGNED
 AND SEALED AS REQUIRED.
 2.PROVIDE DETAILS SHOWING HOW 2 HOUR
 TENANT SEPERATION IS ACHIVED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2000-08-22 Cont ID  
Sent By drunnels Date 2000-08-22 Time 07:51 Rev Time 1.00
Received By drunnels Date 2000-08-22 Time 07:51 Sent To  
Notes
2001-01-08 00:00:001.PROVIDE FLORIDA ENERGY SHEETS SIGNED
 AND SEALED AS REQUIRED.
 2. PROVIDE DESIGN INFORMATION ON IRWIN
 5000 TELESCOPING PLATFORM- SHEET A2.3
 3. PROVIDE DETAILS SHOWING HOW 2 HOUR
 TENANT SEPERATION IS ACHIVED.
 4. PROVIDE HEALTH DEPARTMENT APPROVAL
 FOR WARMING KITCHEN.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2000-08-01 Cont ID  
Sent By drunnels Date 2000-08-01 Time 07:49 Rev Time 1.00
Received By drunnels Date   Time   Sent To  
Notes
2001-01-08 00:00:00 
  
  
 1. PROVIDE FLORIDE ENERGY SHEETS SIGNED
 AND SEALED AS NOTED
 2. PROVIDE PRODUCT APPROVAL FOR DOORS &
 STOREFRONTS FOR EXTERIOR GLAZING PER
 METRO DADE COUNTY OR 1997 SBC SSTD
 12-97
 3. 1998 FLORIDA HANDICAP CODE
 A) PROVIDE ACCESSIBLE TO ALL LEVELS
 B) PROJECTION ROOM ON SHEET A2.1 TO
 BE ACCESSIBLE
 4. PROVIDE DESIGN INFORMATION ON JRWIN
 5000 TELESCOPING PLATFORM ON
 SHEET A2.3
 5. SHEET A4.0 & A4.2 SHOWS FLY GALLEY
 PROVIDE CODE COMPLIANCE INFORMATION
 FOR STAGE PER 1997 SBC CHAPTER 4
 SECTION 403
 6. SHEET A4.2 ROOF ACCESS STAIR
 GUARDRAIL TO MEET 1997 SBC CHAPTER 10
 SECTION 1020.3 HANDRAILS & GUARDRAILS
 7. SHEET A6.1 NOTE: REPAIR ALL EXISTING
 TRUSSES; PROVIDE DETAILS.
 8. SHOW HOW 2HOUR TENANT SEPERATION
 IS ACHIVED.
 9. SHEET A8.0 DETAIL 2 ELEVATOR SHAFT
 SHOW THAT WALL MEETS MIN 2 HR RATING
 10.PROVIDE HEALTH DEPARTMENT APPROVAL
 FOR WARMING KITCHEN.

Review Stop E ELECTRICAL
Rev No 7 Status P Date 2001-02-05 Cont ID  
Sent By dpalmer Date 2001-02-05 Time 10:43 Rev Time 0.00
Received By dpalmer Date 2001-02-05 Time 10:43 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 6 Status F Date 2001-01-11 Cont ID  
Sent By dpalmer Date 2001-01-11 Time 18:42 Rev Time 0.00
Received By dpalmer Date 2001-01-11 Time 18:42 Sent To  
Notes
2001-01-11 00:00:00*****************UNSAT ****************
  
 1)NOTE: PLEASE SEE E-7 PLEASE NOTE
 MISSING OUTLET FOR EQUIPMENT PER
 MECHANICAL CODE 309.2 AND NEC 210-63.
  
 2)NOTE: PLEASE SEE E-8 PLEASE PLACE NOTE
 ON PLANS FOR CEILING TO REMAIN OPEN TO
 MEET NEC 450-13 (A,B). FOR TRANSFORMER
 INSTALLATION.
  
 3)NOTE: PLEASE SEE E-10PANEL"2 AC.
 PLEASE CORRELATE LOAD/WIRE SIZE/BRKR
 AND CONDUIT TO MEET NEC.
  
  
 PLEASE REVISE THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW.
 561--659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 5 Status P Date 2000-12-14 Cont ID  
Sent By dpalmer Date 2000-12-14 Time 20:49 Rev Time 0.00
Received By dpalmer Date 2000-12-14 Time 20:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status F Date 2000-09-28 Cont ID  
Sent By dpalmer Date 2000-09-28 Time 15:17 Rev Time 0.00
Received By dpalmer Date 2000-09-28 Time 15:17 Sent To  
Notes
2001-01-08 00:00:00***************** UNSAT ***************
  
 1)NOTE: PLEASE SEE REVISION FORM FILLED
 OUT BY CONTRACTOR. IT SAYS REVISIONS\\
 ARE CLOUDED????? ALSO PLANS DO NOT
 INDICATE ANY REVISIONSMADE TO EXISTING
 PLANS??
  
 PLEASE HAVE PLANS INDICATE REVISED SHEET
 -S AND CLOUD AREAS REVISED.
 IT LOOKS LIKE THE LOAD CALCULATIONS WERE
 RE-DONE,, IF SO PLEASE CLOUD THESE ALSO.
 ONLY SUBMIT E-SHEETS THAT REVISIONS
 WERE MADE.
  
 PLEASE SUBMIT FOR REVIEW. IF THERE ARE
 ANY QUESTIONS PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 659-8096 EXT 8372

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2000-09-01 Cont ID  
Sent By dpalmer Date 2000-09-01 Time 15:13 Rev Time 0.00
Received By dpalmer Date 2000-09-01 Time 15:13 Sent To  
Notes
2001-01-08 00:00:00SAME PROVISO SHEETS

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2000-08-15 Cont ID  
Sent By dpalmer Date 2000-08-15 Time 16:07 Rev Time 0.00
Received By dpalmer Date 2000-08-15 Time 16:07 Sent To  
Notes
2001-01-08 00:00:00NO E-SHEETS FOR REVIEW.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-09-01 Cont ID  
Sent By dpalmer Date 2000-07-19 Time 19:57 Rev Time 0.00
Received By dpalmer Date 2000-07-19 Time 19:57 Sent To  
Notes
2001-01-08 00:00:00************** PROVISO ***************
  
 1)NOTE: PLEASE SUBMIT LOAD CALCULATIONS
 WITH ALL CONTINUOUS LOADS SHOWN AT 125%
 (LIGHTING) ETC. PER 220 OF THE NEC.
  
 PLEASE SUBMIT THE ABOVE INFORMAITON FOR
 REVIEW BEFORE ANY ROUGH ELECTRICAL
 INSPECTION IS CALLED IN. IF THERE ARE
 ANY QUESITONS PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2000-07-20 Cont ID  
Sent By mgonzale Date 2000-07-20 Time 14:31 Rev Time 0.25
Received By mgonzale Date   Time   Sent To  
Notes
2001-01-08 00:00:00DOESN'T NEED ENGINEERING REVIEW

Review Stop FIRE FIRE DEPARTMENT
Rev No 6 Status P Date 2000-12-29 Cont ID  
Sent By mcarsill Date 2000-12-29 Time 12:25 Rev Time 0.00
Received By mcarsill Date 2000-12-29 Time 12:25 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 5 Status P Date 2000-12-12 Cont ID  
Sent By mcarsill Date 2000-12-12 Time 08:59 Rev Time 0.00
Received By mcarsill Date 2000-12-12 Time 08:59 Sent To  
Notes
2001-01-08 00:00:001) OCCUPANT LOAD TO BE DETERMINED BY
 THIS OFFICE.
 2) PLEASE EXPLAIN TWO STEPS SHOWN ON
 SECOND FLOOR LIFE SAFETY PLAN.
 3) WHAT FIRE RATING DOES THE HUFCOR
 PATHFINDER DOOR PROVIDE.
 4) ALL STORAGE ROOMS TO BE ONE HOUR FIRE
 RATED.
  
 APPROVED PROVISO:
  
 CAPTAIN MIKE CARSILLO
 659-8096,EXT.8497
 835-2910

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2000-09-19 Cont ID  
Sent By mcarsill Date 2000-09-19 Time 08:16 Rev Time 0.00
Received By mcarsill Date 2000-09-19 Time 08:16 Sent To  
Notes
2001-01-08 00:00:001) OCCUPANT LOAD TO BE DETERMINED BY
 THIS OFFICE.
 2) PLEASE PROVIDE FLAMESPREAD DATA ON
 BLUEBOARD AND SONASPRAY FINISH FOR
 CEILING.
 3) STANDPIPE LOCATIONS STILL NOT SHOWN
 ON PLANS.
 4) ALL DOORS SUBJECT TO AN OCCUPANCY
 OF 100 OR MORE PERSONS SHALL BE
 PROVIDED WITH APPROVED PANIC HARDWARE.
 FIRE DOORS SHALL BE EQUIPPED WITH
 APPROVED FIRE EXIT PANIC HARDWARE.
 5) PROVIDE FLAMESPREAD DATA ON
 PROJECTION SCREEN.
 6) PROVIDE MORE DETAILS ON TELESCOPING
 BLEACHER.
 7) PLEASE IDENTIFY REQUIRED AISLES ON
 PAGES FFS.2 AND FFS.3. TABLES AND
 CHAIRS CANNOT BLOCK EXIT ACCESS TO
 EXITS.
 8) GAS INSTALLATION TO COMPLY WITH
 NFPA 54.
 9) DRY-CHEMICAL FIRE SUPPRESSION SYSTEM
 NOT ALLOWED. ONLY WET-CHEMICAL FIRE
 SUPPRESSION SYSTEMS PERMITTED.
 APPROVED PROVISO:

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2000-08-31 Cont ID  
Sent By mcarsill Date 2000-08-31 Time 10:40 Rev Time 0.00
Received By mcarsill Date 2000-08-31 Time 10:40 Sent To  
Notes
2001-01-08 00:00:001) PROVIDE DETAILS ON WATER CURTAIN AND
 DRAFT STOP PLANNED FOR FLOOR OPENING
 BETWEEN SECOND AND THIRD FLOOR. THESE
 DETAILS SHOULD SHOW FIRE SPRINKLER AND
 DRAFT STOPPING TOGETHER.
 2) STANDPIPE SYSTEM STILL NOT SHOWN.
 PLEASE SHOW STANDPIPE SYSTEM CONNECTIONS
 FOR BUILDING.
 3) PROVIDE COMPLETE FIRE ALARM SYSTEM
 SHOP DRAWINGS FOR THE FIRE ALARM
 EQUIPMENT SHOWN FOR EXHIBITION HALL.
 PLEASE BE ADVISED THAT FRED GRINER OF
 CITY PLACE AGREED TO PROVIDE VOICE
 EVACUATION FOR THE FIRE ALARM SYSTEM
 WHEN THE EXHIBITION HALL WAS FITTED
 UP. PLEASE INDICATE THIS ON FUTURE
 PLANS. CUT SHEETS NEEDED ON ALL DEVICES
 PLANNED FOR USE.
 4) WATER CURTAIN FOR NORTHEAST STAIRWAY
 NOT SHOWN.
 5) GAS INSTALLATION TO COMPLY WITH
 NFPA 54.
 APPROVED PROVISO:

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2000-08-15 Cont ID  
Sent By mcarsill Date 2000-08-15 Time 13:27 Rev Time 0.00
Received By mcarsill Date   Time   Sent To  
Notes
2001-01-08 00:00:001) TRAVEL DISTANCE NOTE ON PLANS IS
 STILL INCORRECT. TRAVEL DISTANCE NOTE
 SHOULD READ 200 FEET INSTEAD OF 250
 FEET.
 2) NEW WOOD GUARDRAIL TO COMPLY WITH
 NFPA 101, LIFE SAFETY CODE REQUIREMENTS,
 1985 EDITION.
 3) TWO STEPS SHOWN ON PAGE A4.2 IS NOT
 PROPER. A MINIMUM OF THREE STEPS SHALL
 BE PROVIDED AT 7" EACH OR A RAMP IS
 REQUIRED.
 4) WATER CURTAIN WITH FIRE SPRINKLER
 HEADS NO FARTHER THAN 6 FEET APART ARE
 REQUIRED AT NORTHEAST STAIR.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2000-08-01 Cont ID  
Sent By mcarsill Date 2000-08-01 Time 09:47 Rev Time 0.00
Received By mcarsill Date   Time   Sent To  
Notes
2001-01-08 00:00:001) TRAVEL DISTANCES TO EXITS IN NEW
 ASSEMBLY OCCUPANCIES SHALL NOT EXCEED
 200 FEET.
 2) ALL EXIT DOORS SUBJECT TO AN
 OCCUPANCY LOAD OF 100 OR MORE PERSONS
 ARE TO BE EQUIPPED WITH APPROVED PANIC
 HARDWARE. IF THESE DOORS ARE FIRE RATED
 THEN THEY ARE TO BE EQUIPPED WITH
 APPROVED FIRE EXIT PANIC HARDWARE.
 3) EXHIBITION HALL TO PROVIDE PROVISIONS
 FOR AT LEAST TWO HANDICAPPED PERSONS.
 4) INTERIOR FINISH SHALL BE CLASS A OR
 B.
 5) NO SEATING ARRANGEMENT SHOWN ON
 DRAWINGS.
 6) ALL STORAGE ROOMS SHALL BE SEPARATED
 FROM OTHER PARTS OF THE BUILDING BY
 AT LEAST ONE HOUR AND FIRE SPRINKLERS.
 7) STANDPIPE LOCATIONS NOT SHOWN FOR
 EXHIBITION HALL.
 8) NORTH ENTRY STAIR TO BE SLIP
 RESISTANT.
 9)

Review Stop M MECHANICAL (A/C)
Rev No 6 Status P Date 2000-12-15 Cont ID  
Sent By ndenmark Date 2000-12-15 Time 08:52 Rev Time 0.50
Received By ndenmark Date 2000-12-15 Time 08:51 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2000-09-19 Cont ID  
Sent By ndenmark Date 2000-09-19 Time 12:04 Rev Time 1.00
Received By ndenmark Date 2000-09-19 Time 12:04 Sent To  
Notes
2001-01-08 00:00:00PROVISO:
 FIRE DAMPERS PREVIOUSLY REQUESTED TO BE
 SHOWN ARE NOT ON PLAN. PROVIDE REVISION
 SHOWING LOCATION OF FIRE DAMPERS AT
 RATED WALL PRIOR TO FIRST INSPECTION

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2000-09-08 Cont ID  
Sent By ndenmark Date 2000-09-08 Time 10:58 Rev Time 1.00
Received By ndenmark Date 2000-09-08 Time 10:58 Sent To  
Notes
2001-01-08 00:00:00PROVISO:
 NEW SHEET SHOWING LOCATION OF FIRE DAMP-
 ERS IN 2 HR RATED WALLS TO BE SUBMITTED
 PRIOR TO FIRST INSPECTION FOR APPROVAL
  
 AIR BALANCE SCHEDULE SHOWING COMPLIANCE
 WITH 501.2 1997 SMC TO BE SUBMITTED
 PRIOR TO FIRST INSPECTION FOR REVIEW
 NANCY DENMARK 9/8/00 (561) 659-8096X8221

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2000-08-30 Cont ID  
Sent By ndenmark Date 2000-08-30 Time 15:42 Rev Time 1.00
Received By ndenmark Date 2000-08-30 Time 15:42 Sent To  
Notes
2001-01-08 00:00:00***********DENIED***********************
  
 1. PROVIDE AIR BALANCE SCHEDULE SHOWING
 COMPLIANCE W/ 1997 SMC 501.2
 2. DUCTS PENETRATING RATED WALLS TO HAVE
 FIRE DAMPERS PER 1997 SMC 610.1.2
 PROVIDE LOCATION AND DETAILS OF FIRE
 DAMPERS PER 610.6 (2 HR WALLS, SEE LS
 PLAN

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2000-08-30 Cont ID  
Sent By cthirben Date 2000-08-16 Time 06:52 Rev Time 0.00
Received By bstaples Date 2000-08-16 Time 06:51 Sent To  
Notes
2001-01-08 00:00:00DENIED:
 NO MECHANICAL PLANS SUBMITTED FOR REVIEW

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2000-06-27 Cont ID  
Sent By cthirben Date 2000-06-27 Time 15:09 Rev Time 0.00
Received By cthirben Date 2000-06-27 Time 10:14 Sent To  
Notes
2001-01-08 00:00:00DENIED: ********************************
  
 1. PROVIDE AIR BALANCE SCHEDULE TO SHOW
 COMPLIANCE WITH 1997 SMC 501.2
 2. ENERGY EFFIECIENCY RATING 0F AHU TO
 BE PROVIDED
 3. PROVIDE IN THE JANITOR'S CLOSET AN
 EXHAUST FAN PER 1997 SMC 503.2
 4. DUCT MATERIAL SCHEDULE REQUIRED
  
 NOTES: SEPERATE PERMIT FOR HOODS, GAS,
 FIER-SUPPRESSION SYSTEM, WALK-IN
 COOLERS/FREEZERS.

Review Stop P PLUMBING
Rev No 6 Status F Date 2000-12-17 Cont ID  
Sent By pschmitz Date 2000-12-17 Time 08:20 Rev Time 2.00
Received By pschmitz Date   Time   Sent To  
Notes
2001-01-08 00:00:00PLUMBING PLAN REVIEW OF COMMENTS
 DATED 09-19-00 NOT APPROVED,PAUL SCHMITZ
 (1) SHT P-4,P-2 WTR HTR IS LOCATED ON
 FLOOR T/P, P/D TERMINATE TO FLOOR SINK
 IN JANITORS CLOSET #208.
 (3) SHT P-8 SHOWS AAV VENTS IN ATTIC
 SPC 94 SEC 904.1.3 MIN.OF ONE 3"VTR.
 (5) SHT P-2 SHOW DETAIL OF CONDENSATE
 OVER FLOW AS BUILT. (NO GOOSENECK)
 (7) SHT P-3 SHOWS THE REQ WHEEL CHAIR
 TURNING SPACE IN RM # 216,219 INFRINGING
 IN WATER CLOSET SPACE. FACBC 4.2.3
 (9) SAME AS NOTE (1) WTR HTR TO BE
 READLY ACCESSIBLE. SHOW AS BUILT.
 END OF COMMENTS 561-659-8096 X 8233

Review Stop P PLUMBING
Rev No 5 Status F Date 2000-09-19 Cont ID  
Sent By tlarge Date 2000-09-19 Time 18:28 Rev Time 2.50
Received By tlarge Date 2000-09-19 Time 17:16 Sent To  
Notes
2001-01-08 00:00:001)WATER HEATERS SHALL BEREADILY
 ACCESSIBLE.SPC SEC.501.7.
  
 2)THE MIN.SIZE GAS LINE TO ITEMS P-14,
 P-16,P-17 SHALL BE 1 1/4" PER SGC TABLE
 305.4(A).
  
 3)THE SANITARY SYSTEM REQUIRES ONE MAIN
 VENT STACK OR STACK VENT THROUGH THE
 ROOF (MIN.3")SPC 904.3.1.
  
 4)DESIGN OF DRAINAGE SYSTEM FOR GREASY
 WASTE SYSTEM SHALL COMPLY W/SPC SEC.921
 FOR HORIZONTAL COMBINATION WASTE AND
 VENT SYSTEM.
  
 5)AN OVERFLOW IS REQD.ON THE CONDENSATE
 SYSTEM PRIOR TO THE CONNECTION WITH THE
 STORM DRAINAGE SYSTEM OR CONNECTION
 SHALL BE INDIRECT.SPC SEC.804.3,806.
  
 6)SHT.A2.2-APPEARS TO SHOW FLOOR DRAINS
 LOCATED IN THE MECHANICAL ROOM.LOCATION
 OF FLOOR DRAINS SHALL COMPLY W/SPC SEC.
 409.4.4.1.
  
 7)SHT.A2.3-SHOW THE REQD.WHEELCHAIR
 TURNING SPACE IN THE TOILET ROOMS #216,
 219.COMPLY W/FACBC SEC.4.2.3.THE TURNING
 SPACE THAT IS CURRENTLY SHOWN HAS THE
 WATER CLOSET INFRINGING COMPLETELY INTO
 THE SPACE.
  
 8)CLARIFY THE AREA WHERE THE GAS PIPING
 PENETRATES THE EXTERIOR WALL INTO THE
 BUILDING.WHAT IS THE USE OF THIS SPACE?
  
 9)ADDENDUM TO COMMENT #1-SUPPLY A SHIP'S
 LADDER AND PLATFORM OR RELOCATE WATER
 HEATER TO FLOOR.
  
 CALL 561-659-8096,EXT.8377 IF YOU HAVE
 QUESTIONS.
 TIMOTHY LARGE
 PLUMBING PLANS EXAMINER.

Review Stop P PLUMBING
Rev No 4 Status P Date 2000-09-08 Cont ID  
Sent By tlarge Date 2000-09-08 Time 11:12 Rev Time 0.65
Received By tlarge Date 2000-09-08 Time 11:12 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2000-08-31 Cont ID  
Sent By tlarge Date 2000-08-31 Time 12:52 Rev Time 2.00
Received By tlarge Date 2000-08-31 Time 12:51 Sent To  
Notes
2001-01-08 00:00:001)THE LAYOUT OF THE RESTROOMS ON THE
 LIFE SAFETY PLANS DOESN'T CORRELATE WITH
 THE OTHER SHEETS.COUNTYWIDE AMENDMENTS
 TO SPC SEC.104.2.1.
  
 2)WATER HEATERS SHALL BE READILY ACCESS-
 IBLE PER SPC SEC.501.7.SUPPLY FIXED
 LADDER AND PLATFORM OR RELOCATE WATER
 HEATER TO FLOOR.
  
 3)A UNION SHALL BE INSTALLED DOWNSTREAM
 OF THE MANUAL SHUTOFF VALVE BY THE
 SOLENOID VALVE ON THE GAS SYSTEM PER
 NFPA 54 SEC.5.5.4.(S.O.V.IS SHOWN AS
 SOLENOID VALVE.CLARIFY.)
  
 4)THE MIN.SIZE GAS LINE TO ITEMS P-14,
 P-16,P-17 SHALL BE 1 1/4" PER SGC TABLE
 305.4(A).
  
 5)THE SANITARY SYSTEM REQUIRES ONE MAIN
 VENT STACK OR STACK VENT THROUGH THE
 ROOF(MIN.3").SPC 904.3.1.
  
 6)DESIGN OF DRAINAGE SYSTEM FOR GREASY
 WASTE SHALL COMPLY W/SPC SEC.921 FOR
 HORIZONTAL COMBINATION WASTE AND VENT
 SYSTEM.
  
 7)AN OVERFLOW IS REQD.ON THE CONDENSATE
 SYSTEM PRIOR TO THE CONNECTION WITH
 THE STORM DRAINAGE SYSTEM OR CONNECTION
 SHALL BE INDIRECT.SPC 804.3,806.
  
 CALL 561-569-8096,EXT.8377 IF YOU HAVE
 ANY QUESTIONS.
 TIMOTHY LARGE
 PLUMBING PLANS EXAMINER.

Review Stop P PLUMBING
Rev No 2 Status F Date 2000-08-19 Cont ID  
Sent By tlarge Date 2000-08-19 Time 12:32 Rev Time 1.75
Received By tlarge Date 2000-08-19 Time 11:22 Sent To  
Notes
2001-01-08 00:00:001)TOILET ROOM INSIDE THE RESTROOM IS
 A COMPONENT OF THE RESTROOM AND THE
 WIDTH OF THE TOILET ROOM SHALL BE MIN.
 83"(IF LAV.IS LOCATED ADJACENT TO W.C.)
 SEE FACBC SEC.4.17.3.
  
 2)SHOW REQUIRED WHEELCHAIR TURNING SPACE
 IN RESTROOMS 203,205,219,216.PER FACBC
 SEC.4.2.3.
  
 3)WAINSCOTING TO 4' IS REQD.IN ALL THE
 TOILET ROOMS PER SBC SEC.1204.2.
  
 4)DISHWASHER SHALL DISCHARGE TO SANITARY
 PER CITY ORDINANCE.
  
 5)DOORS CANNOT SWING INTO CLEAR FLOOR
 SPACE OF FIXTURES.FACBC SEC.4.17.5,4.22.
  
 6)SUBMIT COMPLETE GAS DRAWING FOR RE-
 VIEW.COMPLY W/ATTACHED REQS.
  
 7)SANITARY SYSTEM REQUIRES ONE MAIN
 VENT THRU ROOF FOR USE WITH AUTOMATIC
 AIR ADMITTANCE VALVES PER MANUF.
 INSTALLATION INSTRUCTIONS.
  
 8)CONDENSATE DISPOSAL SHALL COMPLY W/
 SMC SEC.304.8.3.
  
 9)RECEPTORS RECEIVING INDIRECT WASTES
 SHALL BE FLOOR SINKS PER SPC SEC.807.1.
  
 10)DESIGN OF DRAIN SYSTEM FOR FLOOR
 SINKS/FLOOR DRAINS SHALL COMPLY W/SPC
 SEC.921.
  
 11)SHT.P-9-DRINKING FOUNTAINS ARE NOT
 SHOWN ON SANITARY RISER.
  
 12)WATER HEATER IN JANITOR CLOSET SHALL
 BE READILY ACCESSIBLE PER SPC 501.7.
  
 CALL 561-659-8096,EXT.8377 IF YOU HAVE
 ANY QUESTIONS.
 TIMOTHY LARGE
 PLUMBING PLANS EXAMINER.

Review Stop P PLUMBING
Rev No 1 Status F Date 2000-07-19 Cont ID  
Sent By pschmitz Date 2000-07-19 Time 06:43 Rev Time 2.50
Received By pschmitz Date   Time   Sent To  
Notes
2001-01-08 00:00:00PLUMBING PLAN REVIEW
 (1) SHT P-A2.3 REST RM #202,206 DOORS TO
 SWING OUT. FACBC 4.23.2
 (2) SHT P-4 JANITORS CLOSET WTR. HTR TO
 BE READLY ACCESSIBLE SPS 94 SEC 501.7
 (3) SHT P-4 KITCHEN #223 CONTACT
 DEPT OF HOTEL BUSINESS REGULATION FOR
 THEIR PLAN REVIEW 954-958-5520.
 (4) SHT P-7 DISHWASHER TO SANITARY SEWER
 LOCAL ORDINANCE REGIONAL SEWER PLANT.
 (5) SHT P-7 GAS PIPING ISOMETRIC REQ.
 SHOW TOTAL DEVELOPED LGTH,TOTAL BTU'S
 BTU'S OF EA APPLIANCE,TYPE OF MATERIAL,
 PSI ON SYSTEM.SGC 94 SEC 104.2
 (6) SHT P-8,9 AIR ADMITANCE VALVES,
 ONE VTR ON EACH SANITARY & GREASE WASTE
 LATERIAL TO BUILDING SEWER.
 END OF COMMENTS