|
 |
 |
 |
 |
 |
Plan Review Details - Permit 00060760
| Plan Review Stops For Permit 00060760 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-06-21 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-06-21 |
Time |
21:01 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-06-21 |
Time |
21:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2000-07-10 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-07-10 |
Time |
12:10 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-07-10 |
Time |
12:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2000-06-17 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-06-17 |
Time |
14:13 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-06-17 |
Time |
14:12 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | DENIED********************************** | | | NO MECHANICAL PLANS SUBMITTED FOR REVIEW |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-06-17 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-06-17 |
Time |
07:41 |
Rev Time |
0.33 |
| Received By |
tlarge |
Date |
2000-06-17 |
Time |
07:41 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2000-11-13 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2000-11-13 |
Time |
11:34 |
Rev Time |
0.33 |
| Received By |
jgomez |
Date |
2000-11-13 |
Time |
11:34 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | TRUSS DRAWINGS REVIEW. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2000-10-03 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2000-10-03 |
Time |
17:44 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2000-10-03 |
Time |
17:43 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | TRUSS DRAWINGS CHECKLIST: | | | 1-CONNECTORS SPECIFIED FOR TRUSS H6 | | | DON'T RESIST THE LOADS CALCULATED BY | | | TRUSS ENGINEER. REVISE CONNECTORS AS | | | REQUIRED. | | | 2-ALL GENERAL TRUSS DETAILS TO BE SEALED | | | SIGNED AND DATED AS PER CHAPTER 471 OF | | | FLORIDA STATUTES. | | | 3-TRUSS DRAWING T2 NEEDS TO BE SIGNED, | | | SEALED AND DATED. | | | IN ADDITION, CLARIFY WHY THE LOADS | | | CALCULATED ARE DONE BY HAND AND NOT | | | RUN BY THE COMPUTER. ENGINEER TO | | | CERTIFY THIS CHANGE. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2000-06-27 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2000-06-27 |
Time |
10:01 |
Rev Time |
4.00 |
| Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ***************PROVISO****************** | | | | | | 1)PROVIDE 2 CURRENT COPIES OF METRO-DADE | | | OR SBCCI PRODUCT APPROVALS FOR EXTERIOR | | | FRENCH DOOR AT REAR OF DWELLING. | | | | | | 2)PRODUCT APPROVAL FORM SUBMITTED FOR | | | SLIDING GLASS DOORS DO NOT INDICATE THAT | | | A UNIFORM STATIC AIR PRESSURE TEST | | | (ASTM E330-90) WAS CONDUCTED ON THEM.SEE | | | 97 SBC SEC 1706. PLEASE PROVIDE WINDLOAD | | | TEST INFORMATION. | | | | | | 3)PROVIDE FLOOD ELEVATION CERTIFICATE. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-06-16 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-06-16 |
Time |
10:26 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |