Plan Review Details - Permit 00051149
| Plan Review Stops For Permit 00051149 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-05-30 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-05-30 |
Time |
16:47 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-05-30 |
Time |
16:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2000-05-30 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-05-30 |
Time |
11:37 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-05-30 |
Time |
11:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-05-30 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-05-30 |
Time |
06:19 |
Rev Time |
0.50 |
| Received By |
tlarge |
Date |
2000-05-30 |
Time |
06:19 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2000-05-31 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2000-05-31 |
Time |
19:17 |
Rev Time |
2.50 |
| Received By |
jgomez |
Date |
2000-05-31 |
Time |
19:17 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | APPROVED WITH PROVISO: | | | 1-SOIL TEST REPORT CALLS FOR A MINIMUM | | | 18" WIDE FOOTING. SHEET A1 CALLS FOR | | | F-2 TO BE 16" WIDE X 18" DEEP. REVISE | | | ORIGINAL DRAWING AS REQUIRED. ALSO, | | | SOIL TEST ENGINEER NEED TO SIGN, SEAL | | | AND DATE REPORT. SIGNATURE TO BE HAND | | | WRITTEN, NOT STAMPED. | | | 2-SHEET A.2.1: MEAN ROOF HEIGHT TO BE | | | 18'-0" PLUS OR MINUS. MEAN ROOF HEIGHT | | | IS TAKEN FROM GRADE, NOT FROM FINISH | | | FLOOR, TO THE AVERAGE POINT OF THE | | | HIGHEST ROOF. | | | 3-STORM PANELS: | | | -PROVIDE A COMPLETE INSTALLLATION SCHED | | | AS PER CITY SAMPLE. | | | -CLEARLY INDICATE MOUNTING CONDITIONS | | | AND ANCHOR TYPE AND SPACING TO BE USED | | | ACCORDING TO THE DESIGN PRESSURES | | | (CHECK MEAN ROOF HEIGHT), STORM PANEL | | | SPAN, EDGE DISTANCE AND STRUCTURE TO | | | BE ATTACHED TO. | | | 4-LETTER FROM ROYAL PALM ALUMINUM | | | MANAGER OF ENGINEERING CERTIFYING THE | | | ARCHITECTURAL SHAPED WINDOWS NEED TO | | | BE SIGNED, SEALED AND DATED BY THE | | | ENGINEER. IN ADDITION NEED TO WRITE | | | LICENSE NUMBER OF ENGINEER. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-05-23 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-05-23 |
Time |
11:29 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|