Plan Review Details - Permit 00050960
Plan Review Stops For Permit 00050960
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2000-12-15 Cont ID  
Sent By jwitmer Date 2000-12-15 Time 18:46 Rev Time 3.00
Received By jwitmer Date   Time   Sent To  
Notes
2001-01-08 00:00:00TRUSS PLANS 12/15/2000 DENIED
 T1A ARCH ANCHOR LEGEND "L" 1170 VS TRUSS
 PLAN R2/1320.
 GT4 2M ARCH PLAN R1=(2M) VS TRUSS PLAN
 PAGE 76 R1= 3690. R2 MTS12 ALLOWABLE 860
 (PINE)X 3 =2580 VS TRUSS PLAN R2=3665.
 GT6 3M DIFFERENCES FROM THE ARCH PLAN,IF
 THE TRUSS MANUFACTURER CHANGES THELAYOUT
 WITHOUT WRIGHTEN PERMISSION THE TRUSS CO
 BECOMES RESPONSIBLE FOR ALL ANCHORAGE
 DETAILS FROM BEARING TO FOOTER. NOTED ON
 PLAN.WHAT TYPE OF CONNECTIONS? ALSO
 CRUSHING VALUES 31/2 X 550= 8661 PAGE104
 R1=9796 R2=8661 VS 9354.
 NOTE ARCH BLOCKWALL VS LEDGER TYPE OF
 CONNECTION? WALL TO TRUSS ARCH TRUSS TO
 TRUSS OR TRUSS TO GIRDER TRUSS ENG.GIVE
 A LIST OF HANGERS TO BE USED.
 ARCH PLAN LIST "M" 1845 UPLIFT ON THE
 FOLLOWING TRUSSES, T44,T46,T48,T50,T52
 T54,T56& H58. THE UPLIFT VALUES RANGE
 FROM 3290 TO 2672, PAGES 24-29 TRUSS PL.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-06-07 Cont ID  
Sent By dpalmer Date 2000-06-07 Time 20:12 Rev Time 0.00
Received By dpalmer Date 2000-06-07 Time 20:12 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-07-29 Cont ID  
Sent By cthirben Date 2000-07-29 Time 09:23 Rev Time 1.00
Received By cthirben Date 2000-07-29 Time 09:23 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2000-05-27 Cont ID  
Sent By cthirben Date 2000-05-27 Time 12:26 Rev Time 1.00
Received By cthirben Date 2000-05-27 Time 12:26 Sent To  
Notes
2001-01-08 00:00:00**************DENIED********************
 A/H 1 IS TOO SMALL FOR THE SUPPLY SHOWN
 ON PLANS, SUPPLY= 2300 CFM
 A/H= 2000 CFM

Review Stop P PLUMBING
Rev No 3 Status P Date 2000-08-26 Cont ID  
Sent By pschmitz Date 2000-08-26 Time 10:00 Rev Time 0.50
Received By pschmitz Date   Time   Sent To  
Notes
2001-01-08 00:00:00REVISION AS BUILT.

Review Stop P PLUMBING
Rev No 2 Status P Date 2000-07-26 Cont ID  
Sent By tlarge Date 2000-07-26 Time 21:25 Rev Time 0.30
Received By tlarge Date 2000-07-26 Time 21:24 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2000-05-22 Cont ID  
Sent By tlarge Date 2000-05-22 Time 06:53 Rev Time 0.33
Received By tlarge Date 2000-05-22 Time 06:53 Sent To  
Notes
2001-01-08 00:00:00SUBMIT A SANITARY RISER THAT COMPLIES
 WITH THE STANDARD PLUMBING CODE IN ALL
 RESPECTS.COUNTYWIDE AMENDMENTS TO SPC
 SEC.101.1,104.2.1.
  
 LOCATION OF PLUMBING FIXTURES ON
 SANITARY RISER SHALL CORRELATE W/FLOOR
 PLAN.COUNTYWIDE AMENDMENTS TO SPC SEC.
 104.2.1.
  
 GAS WATER HEATER IN GARAGE SHALL COMPLY
 W/SGC SEC.402.7.1,402.7.2.+
  
 SUBMIT COMPLETE GAS DRAWING FOR REVIEW
 PRIOR TO INSPECTION.SGC SEC.302.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2000-06-20 Cont ID  
Sent By tmoore Date 2000-06-20 Time 14:19 Rev Time 4.00
Received By rmcdouga Date 2000-06-20 Time 14:18 Sent To  
Notes
2001-01-08 00:00:00 
  
 *************PROVISO***************
  
 SBC 104.2.2
  
 1) PROVIDE 2 CURRENT COPIES OF SBCCI OR
 METRO DADE PRODUCT APPROVALS FOR;
 A) MULLIONS
 B) FRONT DOOR WITH SIDELITE
 C) SINGLE LIGHT FRENCH DOOR
  
 2) PROVIDE STORM PANEL INFORMATION
 UNDER SEPERATE PERMIT
  
 3) BEFORE A PERMIT TO CONSTRUCT CAN
 BE ISSUED, IMPACT FEES MUST BE PAID
 TO PALM BEACH CO. THE PERMIT PLANS
 STAMPED BY THEM AND THE RECEIPT
 ATTACHED TO THE PERMIT APPLICATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-05-19 Cont ID  
Sent By gjoyce Date 2000-05-19 Time 15:54 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved