Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-07-05 Cont ID  
Sent By dpalmer Date 2000-07-05 Time 20:17 Rev Time 0.00
Received By dpalmer Date 2000-07-05 Time 20:17 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-05-24 Cont ID  
Sent By dpalmer Date 2000-05-24 Time 19:25 Rev Time 0.00
Received By dpalmer Date 2000-05-24 Time 19:25 Sent To  
Notes
2001-01-08 00:00:00************** UNSAT *******************
  
 1)NOTE: PLEASE INCLUDE BLDG. STEEL AS
 PART OF THE GROUNDING ELECTRODE SYSTEM.
 AS PER 250-50
  
 2)NOTE: PLEASE NOTE THAT ALL THE OUTLETS
 SERVING KITCHEN COUNTERSPACE ARE TO BE
 GFI/GFI PROTECTED. PLEASE LABEL AS GFI.
 AS PER 210-8-A-6
  
 3)NOTE: YOU HAVE A NOTE ON RISER DIAGRAM
 THAT MAIN DISC. WITH CURRENT LIMITING
 FUSES? BUT THERE IS NO DISC. YOU SHOW
 MAIN BRKR PANEL? PLEASE PROVIDE AIC RAT-
 -ING FOR MAIN ON PANEL OR WHATEVER
 EQUIPMENT IS BEING INSTALLED? SHOW THE
 RATING. MAINS MUST BE RATED FOR THE
 AVAILABLE FAULT CURRENT.110-9
 PLEASE SHOW THE ABOVE PER 215-5
  
  
 4)NOTE:PLEASE SHOW ON PANEL SCHEDULE
 THE REQ`D DEDICATED BATH(S) CIRCUIT(S)
 PER 210-11-C-3/215-5
  
 5)NOTE:PLEASE NOTE THE MISSING OUTLETS
 THAT ARE REQ`D BY 210-52
 IN FRONT FOYER ARE AND ADJOINING ROOM
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS
 PLEASE CALL. 659-8096 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-05-05 Cont ID  
Sent By cthirben Date 2000-05-05 Time 11:06 Rev Time 0.00
Received By cthirben Date 2000-05-05 Time 11:09 Sent To  
Notes
2001-01-08 00:00:00*****************PROVISO****************
 PLANS TO INDICATE EXAUST FANS AND DRYER
 VENT. SMC 503.2.
 ** MECHANICAL PLANS TO SHOWN AS FLOOR
 PLANS.

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-05-05 Cont ID  
Sent By tlarge Date 2000-05-05 Time 06:03 Rev Time 0.33
Received By tlarge Date 2000-05-05 Time 06:03 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2000-08-03 Cont ID  
Sent By tmoore Date 2000-08-03 Time 07:19 Rev Time 1.00
Received By tmoore Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2000-07-07 Cont ID  
Sent By jgomez Date 2000-07-07 Time 16:48 Rev Time 2.50
Received By jgomez Date 2000-07-07 Time 16:48 Sent To  
Notes
2001-01-08 00:00:00CHECKLIST:
 1-IMPACT FEES WERE NOT PAID.
 2-EXTERIOR ELEVATIONS DON'T MATCH FLOOR
 PLAN. REVISE AS REQUIRED.
 3-PROVIDE SAFETY GLASS AT BEDROOM #2
 WINDOW. SECTION 2405.2 SBC 1997.
 4-ENGINEER OF RECORD TO SIGN, SEAL AND
 DATE SHEET A-3. ALSO, INCLUDE HIS
 NAME, LICENSE # AND ADDRESS.
 5-REVISE SIZES OF CEILING FANS. SEE
 TABLE 6-6 OF FLORIDA ENERGY EFFICIENCY
 CODE FOR BUILDING CONSTRUCTION,1997 ED
 6-PROVIDE COPIES OF SOIL TEST REPORT
 DONE AS PER SECTION 1804.2.7.3 OF CITY
 AMENDMENTS.
 7-PROVIDE COMPLETE DETAIL FOR AHU
 INSTALLATION. SPECIFY ALL FASTENERS.
 SECTION 104.2.2 CITY AMENDMENTS.
 8-PROVIDE PRODUCT APPROVAL FOR:
 BUTT GLAZING ASSEMBLY AT MASTER BATH,
 ALL FRENCH DOORS ASSEMBLIES AS SHOWN
 ON PLANS, DOUBLE ENTRY INSWING DOORS,
 FIXED GLASS TRANSOM ABOVE DOORS IN
 LIVING ROOM -SEE SIZE, WINDOW MULLIONS
 9-BEFORE SUBMITTING PRODUCT APPROVAL FOR
 FRENCH DOORS AND ENTRY DOORS CHECK IF
 INSTALLATION REQUIRES A 2X BUCK. IF SO
 PROVIDE INSTALLATION DETAIL.
 10-SEE COMMENTS ON PLANS, INCLUDING
 COMMENTS BY THE OTHER TRADES.
 11-OWES $FOR LOW VALUATION AND
 RADON FEES. SEE ATTACHED RECEIPT.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-06-12 Cont ID  
Sent By tmoore Date 2000-06-12 Time 16:07 Rev Time 4.00
Received By tmoore Date 2000-06-12 Time 15:56 Sent To  
Notes
2001-01-08 00:00:00 
  
 ****************DENIED******************
  
 SBC 104.2.2
  
 1)PROVIDE 2 CURRENT COPIES OF SBCCI OR
 METRO DADE PRODUCT APPROVALS FOR:
 ALL EXTERIOR SWING DOOR ASSEMBLIES
 FIREPLACE UNIT
  
 2)PROVIDE ENGINEERING FOR ALL BUTT GLASS
 OPENINGS.
  
 3)PROVIDE NAME AND SIGNATURE OF PERSON
 RESPONSIBLE FOR THE DESIGN
  
 4)PROVIDE SAFETY GLASS AS REQ.
 1997 SBC 2405.2
  
 *****************NOTE*******************
  
 5) BEFORE A PERMIT TO CONSTRUCT CAN BE
 ISSUED, IMPACT FEES MUST BE PAID TO
 PALM BEACH CO.,THE PERMIT PLANS STAMPED
 BY THEM AND THE RECEIPT ATTACHED TO
 THE PERMIT APPLICATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-05-04 Cont ID  
Sent By gjoyce Date 2000-05-04 Time 08:34 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***