Plan Review Details - Permit 00041259
Plan Review Stops For Permit 00041259
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2000-06-02 Cont ID  
Sent By lmartine Date 2000-06-02 Time 10:59 Rev Time 0.00
Received By lmartine Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2000-06-19 Cont ID  
Sent By dpalmer Date 2000-06-19 Time 08:26 Rev Time 0.00
Received By dpalmer Date 2000-06-19 Time 08:26 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2000-06-16 Cont ID  
Sent By dpalmer Date 2000-06-16 Time 09:38 Rev Time 0.00
Received By dpalmer Date 2000-06-16 Time 09:38 Sent To  
Notes
2001-01-08 00:00:00PLANS TO BE SIGNED ANDSEALED.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-05-05 Cont ID  
Sent By dpalmer Date 2000-05-05 Time 07:19 Rev Time 0.00
Received By dpalmer Date 2000-05-05 Time 07:19 Sent To  
Notes
2001-01-08 00:00:00**************** UNSAT *****************
  
 1)NOTE: NEED TO SHOW LOAD CALCULATIONS
 FOR EACH PANEL. NEED TO LOAD CALCS ON
 THE EQUIPMENT THAT YOU ARE ADDING THESE
 LOADS TO. BE SURE THAT YOU SHOW THE
 LOAD CALCUALTION.PLEASE INCLYDE ALL
 CONTINUOUS LOADS/ LIGHTING ETC.
 220 AND 215-5.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THEREARE ANY QUESTIONS
 PLEASE CALL 659-8096 EXT 8372

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2000-05-09 Cont ID  
Sent By rturnque Date 2000-05-09 Time 15:07 Rev Time 0.35
Received By rturnque Date   Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-05-24 Cont ID  
Sent By ndenmark Date 2000-05-24 Time 15:06 Rev Time 0.50
Received By ndenmark Date 2000-05-24 Time 15:06 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2000-06-09 Cont ID  
Sent By tlarge Date 2000-06-09 Time 11:00 Rev Time 0.00
Received By tlarge Date 2000-06-09 Time 11:01 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2000-06-03 Cont ID  
Sent By pschmitz Date 2000-06-03 Time 08:52 Rev Time 1.50
Received By pschmitz Date   Time   Sent To  
Notes
2001-01-08 00:00:00PLUMBING PLAN REVIEW
 (1) SHT M04,6" CONDENSATE DRAIN, CLEAR
 WASTE ONLY,RERQUIRES A HUB DRAIN 1"
 ABOVE FF IN AEACH MECHANICAL ROOM.
 (2) CAP ON TOP OF 6" CONDENSATE RISER
 TO BE PERFORATED FOR VENTING.
 (3) PVC PIPE EXPOSED TO UV RAYS TO BE
 PROTECTED AS PER MANFACTURES
 RECOMENDATIONS.
 (4) SUPPORT PVC PIPE PER SPC 94 SEC 310.
 END OF COMMENTS


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved