Plan Review Details - Permit 00041035
Plan Review Stops For Permit 00041035
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2000-05-30 Cont ID  
Sent By hpiskura Date 2000-05-30 Time 08:09 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-09-21 Cont ID  
Sent By dpalmer Date 2000-09-21 Time 12:36 Rev Time 0.00
Received By dpalmer Date 2000-09-21 Time 12:36 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-05-04 Cont ID  
Sent By dpalmer Date 2000-05-04 Time 06:29 Rev Time 0.00
Received By dpalmer Date 2000-05-04 Time 06:29 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2000-06-02 Cont ID  
Sent By mgonzale Date 2000-06-02 Time 09:05 Rev Time 2.00
Received By mgonzale Date   Time   Sent To  
Notes
2001-01-08 00:00:00PASSED WITH PROVISOS
 PROJECT RECIEVED FOR ENG REVIEW 6/1/00
  
 REVIEW COMMENTS FOR SHEET C-2
  
 1. DIRECT TAPS MUST BE CALLED OUT
 SPECIFIYING SIZE AND INSTALLATION BY
 CONTRACTOR. (NO SADDLE TAPS ALLOWED)
  
 2. REDUCE PREASSURE ASSEMBLIES MUST BE
 INSTALLED AS MARKED ON PLAN.
  
 3. BACKFLOWS MUST BE INSTALLED IN THE
 PROPERTY JUST INSIDE THE R.O.W. LINE.
  
 4. METERS MUST BE INSTALLED JUST OUSIDE
 OF THE R.O.W.
  
 5. VERTICAL CLEARANCES MUST BE CALLED
 OUT BETWEEN WATER AND SEWER. AN 18"
 MINIMUM CLEARANCE IS REQUIRED.
  
 6. MUST HAVE ON PLAN "SUNSHINE" LOCATING
 SERVICE NOTE ALONG WITH THE TELEPHONE
 NUMBER 1 800 432 4770.
  
 7. SUPPLY STANDARD UTILITY DETAIL
 DRAWINGS TO CONTRACTOR. THIS APPLY'S
 TO SERVICES, BACKFLOW, CLEAN-OUTS,
 AND LATERALS ETC.
  
 8. SUBMITSHOP DRAWINGS TO PROJECT
 COORDINATOR FOR WATER SERVICES AND STORM

Review Stop P PLUMBING
Rev No 2 Status P Date 2000-07-13 Cont ID  
Sent By tlarge Date 2000-07-13 Time 10:51 Rev Time 0.65
Received By tlarge Date 2000-07-13 Time 10:51 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2000-05-04 Cont ID  
Sent By tlarge Date 2000-05-04 Time 18:13 Rev Time 0.50
Received By tlarge Date 2000-05-04 Time 18:13 Sent To  
Notes
2001-01-08 00:00:00DRINKING FOUNTAIN SHALL BE H.C.ACCESS-
 IBLE AND BE LOCATED ON AN ACCESSIBLE
 ROUTE PER FACBC SEC.4.1.1,4.1.2.,4.3.
 PROVISIONS SHALL BE MADE FOR PEOPLE WHO
 HAVE TROUBLE BENDING OR STOOPING.
  
 WATER LINE TO DRINKING FOUNTAIN SHALL BE
 EQUIPPED W/BQCKFLOW PER SPC SEC.606.1,
 606.2.
  
 INDICATE ON PLAN HOW WASTE WATER FROM
 DRINKING FOUNTAIN WILL BE DISPOSED.
 WASTE SHALL BE CONNECTED TO SANITARY
 SYSTEM.SPC SEC.301.11.1.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-04-25 Cont ID  
Sent By gjoyce Date 2000-04-25 Time 09:13 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved