|
 |
 |
 |
 |
 |
Plan Review Details - Permit 00040269
| Plan Review Stops For Permit 00040269 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-05-03 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-05-03 |
Time |
05:54 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-05-03 |
Time |
05:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2000-04-21 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-04-21 |
Time |
14:54 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-04-21 |
Time |
14:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-04-20 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-04-20 |
Time |
06:21 |
Rev Time |
0.33 |
| Received By |
tlarge |
Date |
2000-04-20 |
Time |
06:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2000-10-02 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2000-10-02 |
Time |
17:15 |
Rev Time |
0.50 |
| Received By |
jgomez |
Date |
2000-10-02 |
Time |
17:15 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | TRUSS DRAWINGS CHECKLIST: | | | | | | 1-THERE IS A SLIGHT CHANGE IN THE ROOF | | | FRAMING PLAN BY THE MASTER BEDROOM | | | SITTING AREA. SPECIFY ANCHORS AS | | | REQUIRED FOR NEW ROOF TRUSS LAYOUT. | | | 2-CONNECTORS SPECIFIED FOR SOME ROOF | | | TRUSSES DON'T RESIST THE UPLIFT LOADS | | | CALCULATED IN THE ENGINEERED TRUSSES. | | | REVISE CONNECTOR SCHEDULE AS REQUIRED. | | | SEE TRUSS LAYOUT FOR COMMENTS. | | | | | | | | | | | | | | | | | | | | | NOTE: | | | -IF YOU HAVE ANY QUESTIONS, PLEASE FEEL | | | FREE TO CALL JULIO GOMEZ AT 659-8096 | | | EXT. 8232. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2000-06-03 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2000-06-03 |
Time |
15:45 |
Rev Time |
3.00 |
| Received By |
jgomez |
Date |
2000-06-03 |
Time |
14:05 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | APPROVED WITH PROVISO: | | | 1-PROVIDE CURRENT PRODUCT APPROVAL FOR | | | MASONRY. | | | 2-MULLION PRODUCT APPROVAL IS TO BE USED | | | WITH SERIES 7500 SINGLE HUNG WINDOWS | | | MULLED TOGETHER ONLY. PROVIDE MULLION | | | PRODUCT APPROVAL FOR HORIZONTAL | | | APPLICATIONS. | | | -CLEARLY INDICATE MULLION SIZES AND | | | FASTENERS TO BE USED IN THIS PROJECT. | | | -PROVIDE UPDATED PRODUCT APPROVAL. | | | 3-PROVIDE PRODUCT APPROVAL FOR SLIDING | | | GLASS DOORS WITH TRANSOM ABOVE AS A | | | SINGLE ASSEMBLY AS SHOWN ON ARCHITECTS | | | DRAWINGS. | | | 4-PROVIDE STORM PANELS PRODUCT APPROVAL. | | | -HIGHLIGHT SPECIFIC MOUNTING CONDITIONS | | | AND ANCHOR TYPE AND SPACING TO BE USED | | | ACCORDING TO THE DESIGN PRESSURES | | | (MEAN ROOF HEIGHT), EDGE DISTANCE, | | | PANEL SPAN AND STRUCTURE TO BE | | | ANCHORED TO. | | | 5-UPDATE/REVISE ALL DRAWINGS AS REQUIRED | | | SEE COMMENTS ON PLANS. | | | 6-PROVIDE COMPLETE FRAMING DETAILS AT | | | ARCHED OPENINGS. SECTION 104.2.2 OF | | | CITY AMENDMENTS. | | | 7-PROVIDE SOIL TEST REPORT WITH THE | | | MINIMUM INFORMATION AS REQUESTED IN | | | SECTION 1804.2.7.2 CITY AMENDMENTS. | | | 8-ATTIC ACCESS TO BE 22"X36" MINIMUM. | | | SECTION 2309.6 SBC 1997.REVISE NOTE #7 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-04-11 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-04-11 |
Time |
10:37 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |