|
 |
 |
 |
 |
 |
Plan Review Details - Permit 00031797
| Plan Review Stops For Permit 00031797 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2000-08-02 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-08-02 |
Time |
15:49 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-08-02 |
Time |
15:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-05-01 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-05-01 |
Time |
16:43 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-05-01 |
Time |
16:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2000-04-15 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-04-15 |
Time |
08:42 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-04-15 |
Time |
08:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-04-18 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-04-18 |
Time |
11:32 |
Rev Time |
0.33 |
| Received By |
tlarge |
Date |
2000-04-18 |
Time |
11:27 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | ******************PROVISO*************** | | | SUBMIT REVISED SANITARY RISER PRIOR TO | | | ROUGH INSPECTION. |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
P |
Date |
2000-05-18 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-05-18 |
Time |
11:54 |
Rev Time |
4.00 |
| Received By |
fknapp |
Date |
2000-05-18 |
Time |
10:09 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | | | | ****************PROVISO***************** | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE 2 CURRENT COPIES OF SBCCI OR | | | METRO DADE PRODUCT APPROVALS FOR: | | | ALL SWING ENTRY DOORS BEING USED. | | | GARAGE DOOR BEING USED. | | | | | | 2)PROVIDE APPROVED DRAWINGS FOR STORM | | | PANELS WITH INSTALLATION SCHEDULE AND | | | KEY PLAN WITH SPECIFIC ANCHORS AND | | | MOUNTING TO BE USED. | | | | | | 3)PROVIDE OWNER/AGENT SIGNATURE ON | | | ENERGY CALCULATIONS. | | | | | | 4)PROVIDE ENGINEERING FOR BUTT GLASS | | | OPENINGS. | | | | | | 5)PROVIDE SAFETY GLASS AS REQUIRED. | | | SBC 2405.2.1 | | | | | | 6)BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED, IMPACT FEES MUST BE PAID TO PALM | | | BEACH CO.,THE PERMIT PLANS STAMPED BY | | | THEM AND THE RECEIPT ATTACHED TO THE | | | PERMIT APPLICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-04-05 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-04-05 |
Time |
08:28 |
Rev Time |
0.25 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |