Plan Review Details - Permit 00030897
| Plan Review Stops For Permit 00030897 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2000-04-05 |
|
|
Cont ID |
|
| Sent By |
dpalmer |
Date |
2000-04-05 |
Time |
23:15 |
Rev Time |
0.00 |
| Received By |
dpalmer |
Date |
2000-04-05 |
Time |
23:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2000-08-30 |
|
|
Cont ID |
|
| Sent By |
jleech |
Date |
2000-08-30 |
Time |
17:27 |
Rev Time |
0.00 |
| Received By |
jleech |
Date |
2000-08-30 |
Time |
17:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2000-03-23 |
|
|
Cont ID |
|
| Sent By |
cthirben |
Date |
2000-03-23 |
Time |
09:26 |
Rev Time |
1.00 |
| Received By |
cthirben |
Date |
2000-03-23 |
Time |
09:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2000-03-22 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2000-03-22 |
Time |
07:35 |
Rev Time |
0.50 |
| Received By |
tlarge |
Date |
2000-03-22 |
Time |
07:35 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2000-05-31 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-05-31 |
Time |
16:39 |
Rev Time |
1.00 |
| Received By |
fknapp |
Date |
2000-05-31 |
Time |
16:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2000-05-02 |
|
|
Cont ID |
|
| Sent By |
fknapp |
Date |
2000-05-02 |
Time |
14:11 |
Rev Time |
5.00 |
| Received By |
fknapp |
Date |
2000-05-02 |
Time |
14:11 |
Sent To |
|
|
| Notes |
| 2001-01-08 00:00:00 | | | | *****************DENIED***************** | | | | | | SBC 104.2.2 | | | | | | 1)PROVIDE ENERGY CALCULATIONS WITH | | | OWNER/AGENT SIGNATURE. | | | | | | 2)PROVIDE 2 CURRENT COPIES OF SBCCI OR | | | METRO DADE PRODUCT APPROVALS FOR FRONT | | | DOOR ASSEMBLY WITH SIDELITE. | | | | | | 3)PROVIDE TRUSS LAYOUT REVIEWED AND | | | APPROVED BY DESIGNER OF RECORD. | | | | | | 4)PROVIDE ATRIUM PRIVACY WALL TO BOTTOM | | | OF SLIDING GLASS DOOR LINTEL. | | | | | | 5)PROVIDE RAISE SEAL OF ARCHITECT WHERE | | | MISSING ON PLANS. | | | | | | 6)PROVIDE SPECIFICATIONS FOR 30"X30" 1HR | | | EGRESS PANEL AT ATRIUM. | | | | | | 7)PROVIDE REVISED DESIGN CERTIFICATION | | | ASCE 7-95 WIND IS 145 MPH, MEAN ROF | | | HEIGHT IS MORE THAN 11.2'. IS THE | | | BUILDING ENCLOSED OR PARTIALLY ENCLOSED? | | | | | | 8)PROVIDE COMPLETE FRAMING DETAILS FOR | | | LITEWELL AND SKYLITE, MAX ROOF OPENING | | | PER PRODUCT APPROVAL IS 48"X 48". | | | | | | 9)PROVIDE STRUCTUAL NOTES BASE ON PLANS | | | DRAWN BY ARCHITECT OF PLANS SUBMITTED. | | | | | | 10)BEFORE A PERMIT TO CONSTRUCT CAN BE | | | ISSUED, IMPACT FEES MUST BE PAID TO PALM | | | BEACH CO., THE PERMIT PLANS STAMPED BY | | | THEM AND THE RECEIPT ATTACHED TO THE | | | PERMIT APPLICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2000-03-20 |
|
|
Cont ID |
|
| Sent By |
gjoyce |
Date |
2000-03-20 |
Time |
13:30 |
Rev Time |
0.15 |
| Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |