Plan Review Details - Permit 00030552
Plan Review Stops For Permit 00030552
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2000-03-24 Cont ID  
Sent By dlauderm Date 2000-03-24 Time 08:21 Rev Time 1.00
Received By dlauderm Date 2000-03-24 Time 08:08 Sent To  
Notes
2001-01-08 00:00:00REVIEWED AND PASSED BY JOSE DEL RIO.O.
 PROVISO COMMENTS BY DEAN LAUDERMILK.LK.
  
 1.HYDRAULIC COMPUTATIONS AND SUPPORTING
 DOCUMENTATION NOT SUPPLIED AND ARE
 REQUIRED.
  
 2.IMPERVIOUS AREA COMPUTATIONS NOT
 SUPPLIED AND ARE REQUIRED.
  
 3.POLLUTION PREVENTION PLAN NOT SUPPLIED
 AND ARE REQUIRED.THE POLLUTION
 PREVENTION PLAN SHALL BE KEPT ON SITE AT
 ALL TIMES DURING CONSTRUCTION. THE PLAN
 SHALL BE INSTALLED IN THE FIELD PRIOR TO
 ANY EARTHWORK. THE ENGINEER OF RECORD
 SHALL CERTIFY TO THE CITY, ON A MONTHLY
 BASIS, THAT THE PLAN IS WORKING PROPERLY
 AND AS DESIGNED. THE ENGINEER OF RECORD
 IS RESPONSIBLE TO CERTIFY IMPLEMENTATION
 OF THE PROVISIONS OF CITY ORDINANCE NO.
 3132-98 OF THE CITY CODE AT SUCH TIME
 THE PERMITTEE APPLIES FOR A CERTIFICATE
 OF OCCUPANCY FROM THE CITY BUILDING
 OFFICIAL
  
 4.EVERY SIX MONTHS AFTER CONSTRUCTION A
 PE SHALL CERTIFY THAT THE PERMANENT
 POLLUTION PREVENTION STRUCTURES, DRY-WET
 WATER DETENTION FACILITIES, AND
 EXFILTRATION SYSTEMS ARE WORKING AS
 DESIGNED AND ARE IN GOOD OPERATING
 CONDITION. ALL CERTIFICATIONS MUST BE
 SUBMITTED TO:
 STORM WATER UTILITY ENGINEER
 CITY OF WEST PALM BEACH PUBLIC UTILITIES
 DEPARTMENT
 P.O. BOX 3366, WEST PALM BEACH, FL
 33402.
 THE CERTIFICATION MUST INCLUDE THE
 BUILDING PERMIT NUMBER, THE ADDRESS OF
 THE PROPERTY AND THE NAME OF THE
 ESTABLISHMENT/PROJECT CONSTRUCTED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved